Eskandari, Amin; Ziarati, Koorush; Nikseresht, Alireza An extended \(\varepsilon \)-constraint method for a bi-objective assortment optimization problem. (English) Zbl 07841039 Int. Trans. Oper. Res. 31, No. 5, 3197-3219 (2024). MSC: 90-XX × Cite Format Result Cite Review PDF Full Text: DOI
Ahmed, Javeria; Amin, Saman Hassanzadeh; Fang, Liping A multi-objective approach for designing a tire closed-loop supply chain network considering producer responsibility. (English) Zbl 1510.90024 Appl. Math. Modelling 115, 616-644 (2023). MSC: 90B06 90C11 90C29 91B38 × Cite Format Result Cite Review PDF Full Text: DOI
Farrokhizadeh, Elmira; Seyfi-Shishavan, Seyed Amin; Satoglu, Sule Itir Blood supply planning during natural disasters under uncertainty: a novel bi-objective model and an application for red crescent. (English) Zbl 1509.90182 Ann. Oper. Res. 319, No. 1, 73-113 (2022). MSC: 90C29 90C11 90B80 × Cite Format Result Cite Review PDF Full Text: DOI
Özpeynirci, Selin; Özpeynirci, Özgür; Mousseau, Vincent Portfolio decision analysis with a generalized balance approach. (English) Zbl 1511.91134 Comput. Oper. Res. 142, Article ID 105705, 9 p. (2022). MSC: 91G10 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Lotfi, Reza; Yadegari, Zahra; Hosseini, Seyed Hossein; Khameneh, Amir Hossein; Tirkolaee, Erfan Babaee; Weber, Gerhard-Wilhelm A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project. (English) Zbl 1499.90081 J. Ind. Manag. Optim. 18, No. 1, 375-396 (2022). MSC: 90B35 90C17 90C29 90B50 × Cite Format Result Cite Review PDF Full Text: DOI
Nemati-Lafmejani, Reza; Davari-Ardakani, Hamed Multi-mode resource constrained project scheduling problem along with contractor selection. (English) Zbl 1511.90202 INFOR: Inf. Syst. Oper. Res. 59, No. 2, 212-231 (2021). MSC: 90B35 90B50 × Cite Format Result Cite Review PDF Full Text: DOI
Xiong, Beibei; Chen, Haoxun; An, Qingxian; Wu, Jie A multi-objective distance friction minimization model for performance assessment through data envelopment analysis. (English) Zbl 1430.90355 Eur. J. Oper. Res. 279, No. 1, 132-142 (2019). MSC: 90B50 90C08 90C29 × Cite Format Result Cite Review PDF Full Text: DOI
Dabiri, Nooraddin; J. Tarokh, Mohammad.; Alinaghian, Mahdi New mathematical model for the bi-objective inventory routing problem with a step cost function: a multi-objective particle swarm optimization solution approach. (English) Zbl 1480.90040 Appl. Math. Modelling 49, 302-318 (2017). MSC: 90B06 65K05 90B05 90C10 90C11 × Cite Format Result Cite Review PDF Full Text: DOI
Roni, Mohammad S.; Eksioglu, Sandra D.; Cafferty, Kara G.; Jacobson, Jacob J. A multi-objective, hub-and-spoke model to design and manage biofuel supply chains. (English) Zbl 1357.90140 Ann. Oper. Res. 249, No. 1-2, 351-380 (2017). MSC: 90C29 90C11 90C90 × Cite Format Result Cite Review PDF Full Text: DOI Link
Razmi, Jafar; Zahedi-Anaraki, Amirhossien; Zakerinia, Mohammadsaleh A bi-objective stochastic optimization model for reliable warehouse network redesign. (English) Zbl 1327.90291 Math. Comput. Modelling 58, No. 11-12, 1804-1813 (2013). MSC: 90C29 90C15 90C11 90B10 × Cite Format Result Cite Review PDF Full Text: DOI
Sharma, Amita; Mehra, Aparna Portfolio selection with a minimax measure in safety constraint. (English) Zbl 1282.91309 Optimization 62, No. 11, 1473-1500 (2013). MSC: 91G10 90C47 90C05 × Cite Format Result Cite Review PDF Full Text: DOI
Kourempele, Maria; Mavrotas, G.; Geronikolou, L.; Rozakis, S. Power generation expansion planning in an autonomous island system using multi-objective programming: the case of Milos Island. (English) Zbl 1185.90145 Oper. Res., Int. J. 10, No. 1, 109-132 (2010). MSC: 90B90 90C70 90C11 × Cite Format Result Cite Review PDF Full Text: DOI