×

Models and management structure for the development and implementation of innovative technologies in railway transportation. II. An incentive mechanism for saving energy and elements of the project management structure. (English. Russian original) Zbl 1455.90084

Autom. Remote Control 81, No. 8, 1507-1518 (2020); translation from Upr. Bol’sh. Sist. 2018, No. 76, 219-238 (2018).
Summary: This paper consists of two parts. In the second part, the management mechanisms for implementing complex projects that improve the energy-saving characteristics of products and technologies are further studied. An incentive model for saving energy in the sequence of projects within a multi-project structure is considered, and an optimal mechanism for this model is proposed. This mechanism includes a planning procedure, penalty functions for the nonfulfillment of plans, and an incentive function for project results. The functioning of the system is treated as a game of the Principal and sequentially connected agents who implement projects. The Principal’s strategy is the choice of a specific mechanism. The agents’ strategies are messages, in which they report to the Principal some information about their parameters, and also the choice of the project results. The information about the agents’ parameters is necessary to calculate the plans based on the planning procedure. At the same time, the agents may prefer not to tell the truth, reporting unreliable (distorted) information. It is shown that the optimal mechanism proposed below stimulates the agents to provide reliable information and also to choose the project results coinciding with the plans. The first part of this paper (see [V. N. Burkov et al., Autom. Remote Control 81, No. 7, 1316–1329 (2020; Zbl 1455.90085); translation from Upravl. Bol’sh. Sist. 2018, No. 74, 81–107 (2018)]) was devoted to the mechanisms of project assessment and resource allocation; the results established therein are used to propose a project management system for implementing complex projects.

MSC:

90B50 Management decision making, including multiple objectives
90B06 Transportation, logistics and supply chain management
91A80 Applications of game theory
91B32 Resource and cost allocation (including fair division, apportionment, etc.)

Citations:

Zbl 1455.90085
Full Text: DOI

References:

[1] Belov, MV; Novikov, DA, Network Active Systems: Models of Planning and Incentives, Autom, Remote Control, 80, no. 12, 2229-2244 (2019) · Zbl 1436.91090 · doi:10.1134/S0005117919120117
[2] Burkov, VN; Enaleev, AK, Optimality of the Revelation Principle. Necessary and Sufficient Conditions for the Reliability of Information in Active Systems, Autom. Remote Control, 46, no. 3, 341-348 (1985) · Zbl 0578.90047
[3] Burkov, VN; Enaleev, AK; Strogonov, VI; Fedyanin, DN, Models and Management Structure for the Development and Implementation of Innovative Technologies in Railway Transportation. I. Mechanisms of Priority Projects Selection and Resource Allocation, Autom. Remote Control, 81, no. 7, 81-107 (2020) · Zbl 1455.90085 · doi:10.1134/S0005117920070127
[4] Burkov, VN; Novikov, DA, Kak upravlyat’ organizatsiyami (How to Manage Organizations) (2004), Moscow: SINTEG, Moscow
[5] Enaleev, AK, Optimal Mechanism for an Active System with Communication, Upravlen. Bolash. Sist., no. 29, 108-127 (2010)
[6] Enaleev, AK, Optimal Incentive-Compatible Mechanisms in Active Systems, Autom, Remote Control, 74, no. 3, 491-505 (2013) · Zbl 1271.93004 · doi:10.1134/S0005117913030120
[7] Enaleev, AK, Optimal Incentive Compatible Mechanism in a System with Several Active Elements, Autom. Remote Control, 78, no. 1, 146-158 (2013) · Zbl 1369.49055 · doi:10.1134/S000511791701012X
[8] Mekhanizmy upravleniya (Control Mechanisms), Novikov, D.A., Ed., Moscow: LENAND, 2011. Translated under the title Mechanism Design and Management: Mathematical Methods for Smart Organizations, Novikov, D.A., Ed., New York: Nova Publishers, 2013.
[9] Novikov, DA, Setevye struktury i organizatsionnye sistemy (Network Structures and Organizational Systems) (2003), Moscow: Inst. Probl. Upravlen, Moscow
[10] Novikov, DA; Tsvetkov, AV, Mekhanizmy stimulirovaniya v mnogoelementnykh organizatsionnykh sistemakh (Incentive Mechanisms in Multi-element Organizational Systems) (2000), Moscow: Apostrof, Moscow
[11] ”Statute of the Technical Policy Department of OJSC Russian Railways,” Statute of OJSC RZhD no. 53 dated May 25, 2009 (as amended on October 24, 2017). https://jd-doc.ru/2009/maj-2009/7782-polozhenie-oao-rzhd-ot-25-05-2009-n-53.
[12] ”On Approval of the Statute of the Elaboration and Implementation of the Innovative Development Program of the Russian Railways Holding,” Order of JSC RZhD no. 2596r dated October 30, 2015. www.consultant.ru/cons/cgi/online.cgi?req=doc&base=EXP&n=651275.
[13] ”On Approval of the Statute of the Innovative Development Center—A Branch of OJSC Russian Railways” (together with the Statute itself), Order of JSC RZhD no. 1761r dated August 29, 2016.
[14] ”On the Distribution of Functions in the Management System for Technical and Technological Development, Innovative Activity and Safety Assurance of Production Processes in the Russian Railways Holding,” Order of JSC RZhD no. 2168r dated September 12, 2014 (as amended on September 8, 2016).
[15] STO RZhD 08.007-2011. Standard of JSC RZhD. Innovative Activities in JSC RZhD. Management of the Implementation of Scientific and Technical Works. Approved and put into effect by Order no. 1267r of JSC RZhD dated June 26, 2012. http://doc.rzd.ru/doc/public/ru?STRUCTURE_ID =704&layer_id=5104&id=6027.
[16] STO RZhD 08.015-2011. Standard of JSC RZhD. Innovative Activities in JSC RZhD. The Examination Procedure of Innovative Projects. Approved and put into effect by Order no. 1267r of JSC RZhD dated June 26, 2012. http://lawru.info/dok/2012/06/26/n170829.htm.
[17] STO RZhD 08.005-2011. Standard of JSC RZhD. Innovative activities in JSC RZhD. The Procedure for Assessing the Effectiveness of Innovative Projects. Approved and put into effect by Order no. 1267r of JSC RZhD dated June 26, 2012. http://doc.rzd.ru/doc/public/ru?STRUCTURE_ID =704&layer_id=5104&id=6024.
[18] STK 1.04.001 Quality Standard of JSC RZhD. Project Management of JSC RZhD. Basic Regulations. https://jd-doc.ru/2009/sentyabr-2009/7447-standart-po-kachestvu-oao-rzhd-n-stk-1-04-004-ot-14-09-2009-g-n-1902r.
[19] Bayiz, M. and Corbett, C.J., Coordination and Incentive Contracts in Project Management under Asymmetric Information, December 15, 2005. https://ssrn.com/abstract=914227
[20] Cleden, D., Managing Project Uncertainty (2017), Abingdon: Routledge, Abingdon
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.