×

Incentives to improve the service level in a random yield supply chain: the role of bonus contracts. (English) Zbl 1346.90196

Summary: We consider a decentralized supply chain comprised of one manufacturer and one retailer where the manufacturer has random yield, and the retailer faces uncertain demand. To guarantee product availability, the retailer requires a service level of the product supply from the manufacturer. However, we determine that the high service level indeed benefits the retailer whereas causes the manufacturer’s profit loss. Therefore, to promote the high-service-level cooperation, the retailer has to provide incentives for the manufacturer, such as bonuses. We consider two common bonus contracts: unit bonus and flat (or lump-sum) bonus. The primary question we address is whether the service-level based bonus contracts can achieve the two firms’ Pareto-improving for both service level and profits, which is a prerequisite for the retailer to carry out them with the manufacturer. The results show that both bonus contracts can achieve Pareto-improving. While it is simpler for the retailer to carry out the unit bonus contract, the retailer can achieve a higher service level and higher profits under the flat bonus contract.

MSC:

90B06 Transportation, logistics and supply chain management
Full Text: DOI

References:

[1] Arifoğlu, K.; Deo, S.; Iravani, S. M., Consumption externality and yield uncertainty in the influenza vaccine supply chain: Interventions in demand and supply sides., Management Science, 58, 6, 1072-1091 (2012)
[2] Bollapragada, R.; Rao, U. S.; Zhang, J., Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements., IIE Transactions, 36, 1, 73-85 (2004)
[3] Cachon, G. P., The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts., Management Science, 50, 2, 222-238 (2004) · Zbl 1232.90027
[4] Chen, X.; Shen, Z.-J., An analysis of a supply chain with options contracts and service requirements., IIE Transactions, 44, 10, 805-819 (2012)
[5] Cho, S.-H.; Tang, C. S., Advance selling in a supply chain under uncertain supply and demand., Manufacturing & Service Operations Management, 15, 2, 305-319 (2013)
[6] Chu, L. Y.; Lai, G., Salesforce contracting under demand censorship, Manufacturing & Service Operations Management, 223, 2, 320-334 (2013)
[7] de Frutos, M.-Á.; Fabra, N., Endogenous capacities and price competition: The role of demand uncertainty., International Journal of Industrial Organization, 29, 4, 399-411 (2011)
[8] Dong, Y.; Xu, K.; Evers, P. T., Transshipment incentive contracts in a multi-level supply chain., European Journal of Operational Research, 223, 2, 430-440 (2012) · Zbl 1292.90046
[9] Ebrahim-Khanjari, N.; Hopp, W.; Iravani, S. M., Trust and information sharing in supply chains., Production and Operations Management, 21, 3, 444-464 (2012)
[11] He, Y.; Zhang, J., Random yield risk sharing in a two-level supply chain., International Journal of Production Economics, 112, 2, 769-781 (2008)
[12] He, Y.; Zhang, J., Random yield supply chain with a yield dependent secondary market., European Journal of Operational Research, 206, 1, 221-230 (2010) · Zbl 1188.90030
[13] Hu, X.; Gurnani, H.; Wang, L., Managing risk of supply disruptions: Incentives for capacity restoration., Production and Operations Management, 22, 1, 137-150 (2013)
[14] Inderfurth, K.; Clemens, J., Supply chain coordination by risk sharing contracts under random production yield and deterministic demand., OR Spectrum, 36, 2, 525-556 (2014) · Zbl 1290.90004
[15] Inderfurth, K.; Vogelgesang, S., Concepts for safety stock determination under stochastic demand and different types of random production yield., European Journal of Operational Research, 224, 2, 293-301 (2013) · Zbl 1292.90015
[16] Katok, E.; Thomas, D.; Davis, A., Inventory service-level agreements as coordination mechanisms: The effect of review periods., Manufacturing & Service Operations Management, 10, 4, 609-624 (2008)
[17] Kazaz, B.; Webster, S., The impact of yield-dependent trading costs on pricing and production planning under supply uncertainty., Manufacturing & Service Operations Management, 13, 3, 404-417 (2011)
[18] Keren, B., The single-period inventory problem: Extension to random yield from the perspective of the supply chain., Omega, 37, 4, 801-810 (2009)
[19] Konishi, H., Concentration of competing retail stores, Journal of Urban Economics, 58, 3, 488-512 (2005)
[21] Lariviere, M. A.; Porteus, E. L., Selling to the newsvendor: An analysis of price-only contracts., Manufacturing & Service Operations Management, 3, 4, 293-305 (2001)
[22] Lejeune, M. A., Probabilistic modeling of multiperiod service levels., European Journal of Operational Research, 230, 2, 299-312 (2013) · Zbl 1317.90219
[23] Li, G.; Huang, F. F.; Cheng, T.; Zheng, Q.; Ji, P., Make-or-buy service capacity decision in a supply chain providing after-sales service., European Journal of Operational Research, 239, 2, 377-388 (2014) · Zbl 1339.90059
[24] Li, X.; Li, Y.; Cai, X., A note on the random yield from the perspective of the supply chain., Omega, 40, 5, 601-610 (2012)
[25] Li, X.; Li, Y.; Cai, X., Double marginalization and coordination in the supply chain with uncertain supply., European Journal of Operational Research, 226, 2, 228-236 (2013) · Zbl 1292.90057
[26] Liang, L.; Atkins, D., Designing service level agreements for inventory management., Production and Operations Management, 22, 5, 1103-1117 (2013)
[27] Ma, S.; Yin, Z.; Guan, X., The role of spot market in a decentralised supply chain under random yield., International Journal of Production Research, 51, 21, 6410-6434 (2013)
[28] Sethi, S. P.; Yan, H.; Zhang, H.; Zhou, J., A supply chain with a service requirement for each market signal., Production and Operations Management, 16, 3, 322-342 (2007)
[29] Sieke, M. A.; Seifert, R. W.; Thonemann, U. W., Designing service level contracts for supply chain coordination., Production and Operations Management, 21, 4, 698-714 (2012)
[30] Sohoni, M. G.; Chopra, S.; Mohan, U.; Sendil, N., Threshold incentives and sales variance., Production and Operations Management, 20, 4, 571-586 (2011)
[31] Stratmann, U., Gemeinsam im Takt—Lean Manufacturing (in German), Management forum seminar (2006), June 30, 2006, Cologne, Germany.
[32] Tang, S. Y.; Gurnani, H.; Gupta, D., Managing disruptions in decentralized supply chains with endogenous supply process reliability., Production and Operations Management, 23, 7, 1198-1211 (2014)
[33] Tang, S. Y.; Kouvelis, P., Pay-back-revenue-sharing contract in coordinating supply chains with random yield., Production and Operations Management, 23, 12, 2089-2102 (2014)
[34] Tarakci, H.; Tang, K.; Moskowitz, H.; Plante, R., Incentive maintenance outsourcing contracts for channel coordination and improvement., IIE Transactions, 38, 8, 671-684 (2006)
[35] Wang, C., Random yield and uncertain demand in decentralised supply chains under the traditional and vmi arrangements., International Journal of Production Research, 47, 7, 1955-1968 (2009) · Zbl 1198.90069
[36] Wang, Y.; Xiao, Y.; Yang, N., Improving reliability of a shared supplier with competition and spillovers., European Journal of Operational Research, 236, 2, 499-510 (2014) · Zbl 1317.90058
[37] Xu, H., Managing production and procurement through option contracts in supply chains with random yield., International Journal of Production Economics, 126, 2, 306-313 (2010)
[38] Xu, M.; Lu, Y., The effect of supply uncertainty in price-setting newsvendor models., European Journal of Operational Research, 227, 3, 423-433 (2013) · Zbl 1292.90032
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.