×

Supply chain coordination by risk sharing contracts under random production yield and deterministic demand. (English) Zbl 1290.90004

Summary: From numerous contributions to literature we know that properly designed contracts can facilitate coordinated decision making of multiple actors in a supply chain (SC) so that efficiency losses for the whole SC can be avoided. In a newsvendor-type SC with stochastic demand it is well-known that the double marginalization effect hampers the simple wholesale price contract to achieve coordination. More complex contracts however can bring about coordination, especially those which enable appropriate sharing of risks between the actors. While the effectiveness of risk sharing contracts is well understood for SC situations with random demand and reliable supply, less is known about respective problems if demand is deterministic but supply is unreliable due to random production yield. This paper shows how in a buyer-supplier SC the distribution of risks affects the coordination of buyer’s ordering and supplier’s production decision in a basic random yield, deterministic demand setting. Both parties are exposed to risks of over-production or under-delivery, respectively, if a simple wholesale price contract is applied. The resulting risk distribution always impedes SC coordination. However, more sophisticated contract types which penalize or reward the supplier can change risk distribution so that SC coordination is possible under random yield. Additionally, it is proven that the wholesale price contract will guarantee SC coordination if the supplier has a second (emergency) procurement source that is more costly, but reliable. Moreover, it is shown that under wholesale price contracts it can be beneficial to utilize this emergency source even if it is unprofitable from a SC perspective. However, if such an emergency option is available to the buyer as opposed to the supplier, a wholesale price contract will not be able to coordinate the SC.

MSC:

90B05 Inventory, storage, reservoirs

References:

[1] Arshinder, K.; Kanda, A.; Deshmukh, SG; Choi, TM (ed.); Cheng, TCE (ed.), A review on supply chain coordination: coordination mechanisms, managing uncertainty and research directions, 39-82 (2011), Heidelberg
[2] Bassok Y, Hopp WJ, Rothagi M (2002) A simple linear heuristic for the service constrained random yield problem. IIE Trans 34(5):479-487
[3] Bendoly E, Croson R, Goncalves P, Schultz K (2010) Bodies of knowledge for research in behavioral operations. Prod Oper Manag 19(4):434-452 · doi:10.1111/j.1937-5956.2009.01108.x
[4] Burnetas A, Gilbert SM, Smith CE (2007) Quantity discounts in single-period supply contracts with asymmetric demand information. IIE Trans 39(5):465-479 · doi:10.1080/07408170600941599
[5] Cachon GP (2003) Supply chain coordination with contracts. In: Graves S, de Kok T (eds) handbooks in operations research and management science, supply chain management. North-Holland, pp 229-339 · Zbl 1188.90021
[6] Corbett, CJ; Tang, CS; Tayur, S. (ed.); Ganeshan, R. (ed.); Magazine, M. (ed.), Designing supply contracts: contract type and information asymmetry, 269-297 (1999), Boston · Zbl 1052.90506
[7] Gerchak Y, Vickson RG, Parlar M (1988) Periodic review production models with variable yield and uncertain demand. IIE Trans 20(2):144-150 · doi:10.1080/07408178808966163
[8] Gerchak Y, Wang Y, Yano CA (1994) Lot sizing in assembly systems with random component yields. IIE Trans 26(2):19-24 · doi:10.1080/07408179408966592
[9] Güler MG, Bilgic T (2009) On coordinating an assembly system under random yield and random demand. Eur J Oper Res 196(1):342-350 · Zbl 1159.90309 · doi:10.1016/j.ejor.2008.03.002
[10] Gurnani H, Akella R, Lehoczky J (2000) Supply management in assembly systems with random yield and random demand. IIE Trans 32(8):701-714
[11] Gurnani H, Gerchak Y (2007) Coordination in decentralized assembly systems with uncertain component yields. Eur J Oper Res 176(3):1559-1576 · Zbl 1109.90004 · doi:10.1016/j.ejor.2005.09.036
[12] Gurnani H, Ramachandran K, Ray S, Xia Y (2011) Ordering behavior under supply risk: an experimental investigation, Working paper · Zbl 1279.90015
[13] He Y, Zhang J (2008) Random yield risk sharing in a two-level supply chain. Int J Prod Econ 112(2):769-781 · doi:10.1016/j.ijpe.2007.06.003
[14] He Y, Zhang J (2010) Random yield supply chain with yield dependent secondary market. Eur J Oper Res 206(1):221-230 · Zbl 1188.90030 · doi:10.1016/j.ejor.2010.02.021
[15] He Y, Zhao X (2012) Coordination in multi-echelon supply chain under supply and demand uncertainty. Int J Prod Econ 139(1):106-115 · doi:10.1016/j.ijpe.2011.04.021
[16] Henig M, Gerchak Y (1990) The structure of periodic review policies in the presence of random yield. Oper Res 38(4):634-643 · Zbl 0721.90034 · doi:10.1287/opre.38.4.634
[17] Jones PC, Lowe TJ, Traub RD, Kegler G (2001) Matching supply and demand: The value of a second chance in producing hybrid seed corn. Manuf Serv Oper Manag 3(2):122-137
[18] Kazaz B (2004) Production planning under yield and demand uncertainty with yield-dependent cost and price. Manuf Serv Oper Manag 6(3):209-224
[19] Keren B (2009) The single-period inventory problem: extension to random yield from the perspective of the supply chain. Omega 37(4):801-810 · doi:10.1016/j.omega.2008.07.006
[20] Ma P, Wang H, He Y (2012) Coordination in a two-stage supply chain under random yield. ICIC Express Lett 6(1):71-77
[21] Maskin E, Tirole J (1990) The principal-agent relationship with an informed principal: the case of private values. Econometrica 52(2):379-409 · Zbl 0728.90107
[22] Nahmias S (2009) Production and operations analysis, 6th edn. McGraw-Hill, Boston
[23] Pan W, So KC (2010) Optimal product pricing and component production quantities for an assembly system under supply uncertainty. Oper Res 58(6):1792-1797 · Zbl 1231.90050
[24] Ray S, Li S, Song Y (2005) Tailored supply chain decision making under price-sensitive stochastic demand and delivery uncertainty. Manag Sci 51(12):1873-1891 · Zbl 1232.90085
[25] Wang CX (2009) Random yield and uncertain demand in decentralised supply chains under the traditional and VMI arrangements. Int J Prod Res 47(7):1955-1968 · Zbl 1198.90069
[26] Xia Y, Ramachandran K, Gurnani H (2011) Sharing demand and supply risk in a supply chain. IIE Trans 43(6):451-469
[27] Xu H (2010) Managing production and procurement through option contracts in supply chains with random yield. Int J Prod Econ 126(2):306-313
[28] Yan X, Liu K (2009) An analysis of pricing power allocation in supply chains of random yield and random demand. Int J Inf Manag Sci 20(3):415-433 · Zbl 1279.90015
[29] Yan X, Zhang M, Liu K (2010) A note on coordination in decentralized assembly systems with uncertain component yields. Eur J Oper Res 205(2):469-478 · Zbl 1188.90021
[30] Yano CA, Lee HL (1995) Lot sizing with random yields: a review. Oper Res 43(2):311-334 · Zbl 0832.90031
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.