Lot sizing with random yields: A review. Zbl 0832.90031
Yano, Candace Arai; Lee, Hau L. |
|
1995
|
Production control in multistage systems with variable yield losses. Zbl 0642.90046
Lee, Hau L.; Yano, Candace Arai |
|
1988
|
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Zbl 0815.90093
Kim, Yeong-Dae; Yano, Candace Arai |
|
1994
|
Algorithms for a class of single-machine weighted tardiness and earliness problems. Zbl 0725.90041
Yano, Candace Arai; Kim, Yeong-Dae |
|
1991
|
Preemption in single machine earliness/tardiness scheduling. Zbl 1168.90427
Bülbül, Kerem; Kaminsky, Philip; Yano, Candace |
|
2007
|
Setting planned leadtimes in serial production systems with tardiness costs. Zbl 0628.90030
Yano, Candace Arai |
|
1987
|
Joint production and pricing decisions with setup costs and capacity constraints. Zbl 1232.90176
Deng, Shiming; Yano, Candace A. |
|
2006
|
Improving supply chain performance and managing risk under weather-related demand uncertainty. Zbl 1232.90033
Chen, Frank Youhua; Yano, Candace Arai |
|
2010
|
Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs. Zbl 1054.90028
Bülbül, Kerem; Kaminsky, Philip; Yano, Candace |
|
2004
|
Product line selection and pricing under a share-of-surplus choice model. Zbl 1033.90062
Kraus, Ursula G.; Yano, Candace Arai |
|
2003
|
Cyclic scheduling to minimize inventory in a batch flow line. Zbl 0806.90063
Dobson, Gregory; Yano, Candace Arai |
|
1994
|
The multi-item joint replenishment problem with transportation and container effects. Zbl 0798.90037
Ben-Khedher, Nejib; Yano, Candace A. |
|
1994
|
A multiplier adjustment approach for the set partitioning problem. Zbl 0745.90050
Chan, Thomas Justin; Yano, Candace Arai |
|
1992
|
The strategic use of capacity slack in the economic lot scheduling problem with random demand. Zbl 0824.90054
Bourland, Karla E.; Yano, Candace A. |
|
1994
|
Third party logistics planning with routing and inventory costs. Zbl 1105.90008
Newman, Alexandra M.; Yano, Candace A.; Kaminsky, Philip M. |
|
2005
|
Scheduling trains and containers with due dates and dynamic arrivals. Zbl 1069.90533
Yano, Candace A.; Newman, Alexandra M. |
|
2001
|
New algorithms for (Q,r) systems with complete backordering using a fill- rate criterion. Zbl 0593.90017
Yano, Candace Arai |
|
1985
|
Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems. Zbl 0943.90519
Kim, Y.-D.; Yano, C. A. |
|
1997
|
Scheduling direct and indirect trains and containers in an intermodal setting. Zbl 0991.90528
Newman, Alexandra M.; Yano, Candace Arai |
|
2000
|
Characteristics of optimal workload allocation for closed queueing networks. Zbl 0754.60099
Lee, Heungsoon Felix; Srinivasan, Mandyam M.; Yano, Candace A. |
|
1991
|
The economic lot and delivery scheduling problem: Powers of two policies. Zbl 0858.90069
Hahm, Juho; Yano, Candace Arai |
|
1995
|
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors. Zbl 1107.90343
Bennett, Derek P.; Yano, Candace A. |
|
2004
|
Forecast horizons for the discounted dynamic lot-size problem allowing speculative motive. Zbl 0648.90025
Bean, James C.; Smith, Robert L.; Yano, Candace A. |
|
1987
|
Facility layout to support just-in-time. Zbl 0879.90082
Kamoun, Mahdi; Yano, Candace Arai |
|
1996
|
A due date-based approach to part type selection in flexible manufacturing systems. Zbl 0902.90080
Kim, Y.-D.; Yano, C. A. |
|
1994
|
Five decades of operations management and the prospects ahead. Zbl 1168.90307
Chopra, Sunil; Lovejoy, William; Yano, Candace |
|
2004
|
Stochastic leadtimes in two-level distribution-type networks. Zbl 0647.90027
Yano, Candace Arai |
|
1987
|
Improving supply chain performance and managing risk under weather-related demand uncertainty. Zbl 1232.90033
Chen, Frank Youhua; Yano, Candace Arai |
|
2010
|
Preemption in single machine earliness/tardiness scheduling. Zbl 1168.90427
Bülbül, Kerem; Kaminsky, Philip; Yano, Candace |
|
2007
|
Joint production and pricing decisions with setup costs and capacity constraints. Zbl 1232.90176
Deng, Shiming; Yano, Candace A. |
|
2006
|
Third party logistics planning with routing and inventory costs. Zbl 1105.90008
Newman, Alexandra M.; Yano, Candace A.; Kaminsky, Philip M. |
|
2005
|
Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs. Zbl 1054.90028
Bülbül, Kerem; Kaminsky, Philip; Yano, Candace |
|
2004
|
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors. Zbl 1107.90343
Bennett, Derek P.; Yano, Candace A. |
|
2004
|
Five decades of operations management and the prospects ahead. Zbl 1168.90307
Chopra, Sunil; Lovejoy, William; Yano, Candace |
|
2004
|
Product line selection and pricing under a share-of-surplus choice model. Zbl 1033.90062
Kraus, Ursula G.; Yano, Candace Arai |
|
2003
|
Scheduling trains and containers with due dates and dynamic arrivals. Zbl 1069.90533
Yano, Candace A.; Newman, Alexandra M. |
|
2001
|
Scheduling direct and indirect trains and containers in an intermodal setting. Zbl 0991.90528
Newman, Alexandra M.; Yano, Candace Arai |
|
2000
|
Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems. Zbl 0943.90519
Kim, Y.-D.; Yano, C. A. |
|
1997
|
Facility layout to support just-in-time. Zbl 0879.90082
Kamoun, Mahdi; Yano, Candace Arai |
|
1996
|
Lot sizing with random yields: A review. Zbl 0832.90031
Yano, Candace Arai; Lee, Hau L. |
|
1995
|
The economic lot and delivery scheduling problem: Powers of two policies. Zbl 0858.90069
Hahm, Juho; Yano, Candace Arai |
|
1995
|
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Zbl 0815.90093
Kim, Yeong-Dae; Yano, Candace Arai |
|
1994
|
Cyclic scheduling to minimize inventory in a batch flow line. Zbl 0806.90063
Dobson, Gregory; Yano, Candace Arai |
|
1994
|
The multi-item joint replenishment problem with transportation and container effects. Zbl 0798.90037
Ben-Khedher, Nejib; Yano, Candace A. |
|
1994
|
The strategic use of capacity slack in the economic lot scheduling problem with random demand. Zbl 0824.90054
Bourland, Karla E.; Yano, Candace A. |
|
1994
|
A due date-based approach to part type selection in flexible manufacturing systems. Zbl 0902.90080
Kim, Y.-D.; Yano, C. A. |
|
1994
|
A multiplier adjustment approach for the set partitioning problem. Zbl 0745.90050
Chan, Thomas Justin; Yano, Candace Arai |
|
1992
|
Algorithms for a class of single-machine weighted tardiness and earliness problems. Zbl 0725.90041
Yano, Candace Arai; Kim, Yeong-Dae |
|
1991
|
Characteristics of optimal workload allocation for closed queueing networks. Zbl 0754.60099
Lee, Heungsoon Felix; Srinivasan, Mandyam M.; Yano, Candace A. |
|
1991
|
Production control in multistage systems with variable yield losses. Zbl 0642.90046
Lee, Hau L.; Yano, Candace Arai |
|
1988
|
Setting planned leadtimes in serial production systems with tardiness costs. Zbl 0628.90030
Yano, Candace Arai |
|
1987
|
Forecast horizons for the discounted dynamic lot-size problem allowing speculative motive. Zbl 0648.90025
Bean, James C.; Smith, Robert L.; Yano, Candace A. |
|
1987
|
Stochastic leadtimes in two-level distribution-type networks. Zbl 0647.90027
Yano, Candace Arai |
|
1987
|
New algorithms for (Q,r) systems with complete backordering using a fill- rate criterion. Zbl 0593.90017
Yano, Candace Arai |
|
1985
|