×
Author ID: xiong.fuli Recent zbMATH articles by "Xiong, Fuli"
Published as: Xiong, Fuli
Documents Indexed: 6 Publications since 2012
Co-Authors: 10 Co-Authors with 5 Joint Publications
103 Co-Co-Authors

Citations contained in zbMATH Open

5 Publications have been cited 19 times in 18 Documents Cited by Year
Minimizing the total completion time in a distributed two stage assembly system with setup times. Zbl 1348.90328
Xiong, Fuli; Xing, Keyi; Wang, Feng; Lei, Hang; Han, Libin
7
2014
Just-in-time scheduling for a distributed concrete precast flow shop system. Zbl 1510.90131
Xiong, Fuli; Chu, Mengling; Li, Zhi; Du, Yao; Wang, Linting
7
2021
Extraction of bridge frequencies inclusive of the higher modes by the ESMD using the contact-point response. Zbl 1535.74402
Yang, Y. B.; Xiong, F.; Wang, Z. L.; Xu, H.
5
2020
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time. Zbl 1357.90061
Xiong, Fuli; Xing, Keyi; Wang, Feng
3
2015
Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm. Zbl 1265.90133
Xiong, Fuli; Yan, Hongsen
2
2012
Just-in-time scheduling for a distributed concrete precast flow shop system. Zbl 1510.90131
Xiong, Fuli; Chu, Mengling; Li, Zhi; Du, Yao; Wang, Linting
7
2021
Extraction of bridge frequencies inclusive of the higher modes by the ESMD using the contact-point response. Zbl 1535.74402
Yang, Y. B.; Xiong, F.; Wang, Z. L.; Xu, H.
5
2020
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time. Zbl 1357.90061
Xiong, Fuli; Xing, Keyi; Wang, Feng
3
2015
Minimizing the total completion time in a distributed two stage assembly system with setup times. Zbl 1348.90328
Xiong, Fuli; Xing, Keyi; Wang, Feng; Lei, Hang; Han, Libin
7
2014
Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm. Zbl 1265.90133
Xiong, Fuli; Yan, Hongsen
2
2012

Citations by Year