×
Author ID: lee.geun-cheol Recent zbMATH articles by "Lee, Geun-Cheol"
Published as: Lee, G.-C.; Lee, Geun-Cheol
Documents Indexed: 14 Publications since 1977
Co-Authors: 5 Co-Authors with 4 Joint Publications
35 Co-Co-Authors

Citations contained in zbMATH Open

10 Publications have been cited 29 times in 23 Documents Cited by Year
Bottleneck-focused scheduling for a hybrid flowshop. Zbl 1052.90559
Lee, G.-C.; Kim, Y.-D.; Choi, S.-W.
18
2004
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. Zbl 1068.90056
Choi, S.-W.; Kim, Y.-D.; Lee, G.-C.
15
2005
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness. Zbl 1069.90115
Lee, G.-C.; Kim, Y.-D.
7
2004
Explicit time-domain transmitting boundary for dam-reservoir interaction analysis. Zbl 0775.73302
Yang, R.; Tsai, C. S.; Lee, G. C.
5
1993
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system. Zbl 1095.90550
Lee, G.-C.; Kim, Y.-D.; Kim, J.-G.; Choi, S.-H.
5
2003
An index of damping non-proportionality for discrete vibrating systems. Zbl 1147.74348
Tong, M.; Liang, Z.; Lee, G. C.
2
1994
On the distribution of the correlation coefficient when sampling from a mixture of two bivariate normal densities: Robustness and the effect of outliers. Zbl 0551.62033
Srivastava, M. S.; Lee, G. C.
2
1984
On the robustness of tests of correlation coefficient in the presence of an outlier. Zbl 0562.62034
Srivastava, M. S.; Lee, G. C.
2
1985
Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times. Zbl 1394.90284
Lee, Geun-Cheol; Hong, Jung Man; Choi, Seong-Hoon
2
2015
A finite element model for thin-walled members. Zbl 0497.73071
Gellin, S.; Lee, G. C.; Chern, J. H.
1
1983
Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times. Zbl 1394.90284
Lee, Geun-Cheol; Hong, Jung Man; Choi, Seong-Hoon
2
2015
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. Zbl 1068.90056
Choi, S.-W.; Kim, Y.-D.; Lee, G.-C.
15
2005
Bottleneck-focused scheduling for a hybrid flowshop. Zbl 1052.90559
Lee, G.-C.; Kim, Y.-D.; Choi, S.-W.
18
2004
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness. Zbl 1069.90115
Lee, G.-C.; Kim, Y.-D.
7
2004
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system. Zbl 1095.90550
Lee, G.-C.; Kim, Y.-D.; Kim, J.-G.; Choi, S.-H.
5
2003
An index of damping non-proportionality for discrete vibrating systems. Zbl 1147.74348
Tong, M.; Liang, Z.; Lee, G. C.
2
1994
Explicit time-domain transmitting boundary for dam-reservoir interaction analysis. Zbl 0775.73302
Yang, R.; Tsai, C. S.; Lee, G. C.
5
1993
On the robustness of tests of correlation coefficient in the presence of an outlier. Zbl 0562.62034
Srivastava, M. S.; Lee, G. C.
2
1985
On the distribution of the correlation coefficient when sampling from a mixture of two bivariate normal densities: Robustness and the effect of outliers. Zbl 0551.62033
Srivastava, M. S.; Lee, G. C.
2
1984
A finite element model for thin-walled members. Zbl 0497.73071
Gellin, S.; Lee, G. C.; Chern, J. H.
1
1983

Citations by Year