×
Author ID: huang.guangquan Recent zbMATH articles by "Huang, Guangquan"
Published as: Huang, Guangquan
Documents Indexed: 14 Publications since 1985
Co-Authors: 5 Co-Authors with 3 Joint Publications
530 Co-Co-Authors

Citations contained in zbMATH Open

10 Publications have been cited 17 times in 17 Documents Cited by Year
A q-rung orthopair fuzzy decision-making model with new score function and best-worst method for manufacturer selection. Zbl 1536.90101
Xiao, Liming; Huang, Guangquan; Pedrycz, Witold; Pamucar, Dragan; Martínez, Luis; Zhang, Genbao
12
2022
Distributed project scheduling with information sharing in supply chains. I: An agent-based negotiation model. Zbl 1095.90042
Lau, J. S. K.; Huang, G. Q.; Mak, K. L.; Liang, L.
6
2005
Distributed project scheduling with information sharing in supply chains. II: Theoretical analysis and computational study. Zbl 1096.90019
Lau, J. S. K.; Huang, G. Q.; Mak, K. L.; Liang, L.
6
2005
Design alternative assessment and selection: a novel Z-cloud rough number-based BWM-MABAC model. Zbl 1534.90066
Huang, Guangquan; Xiao, Liming; Pedrycz, Witold; Pamucar, Dragan; Zhang, Genbao; Martínez, Luis
5
2022
Generalized Morse theory and its applications to control and stability analysis. Zbl 0757.93014
Luxemburg, L. A.; Huang, G.
4
1991
Control of reactive power and voltage in emergencies. Zbl 0561.90055
Zaborszky, J.; Huang, G.; Lin, S. Y.
3
1985
Distributed supply-chain project rescheduling. I: Impacts of information-sharing strategies. Zbl 1080.90502
Huang, G. Q.; Lau, J. S. K.; Mak, K. L.; Liang, L.
2
2005
Distributed supply-chain project rescheduling. II: Distributed affected operations rescheduling algorithm. Zbl 1095.90548
Huang, G. Q.; Lau, J. S. K.; Mak, K. L.; Liang, L.
2
2006
Modelling and optimisation for sustainable development policy assessment. Zbl 1068.90068
Cannon, M.; Kouvaritakis, B.; Huang, G.
1
2005
Characterization of equilibrium points on the stability boundary via algebraic topology approach. Zbl 0677.58017
Huang, G.; Luxemburg, L. A.
1
1988
A q-rung orthopair fuzzy decision-making model with new score function and best-worst method for manufacturer selection. Zbl 1536.90101
Xiao, Liming; Huang, Guangquan; Pedrycz, Witold; Pamucar, Dragan; Martínez, Luis; Zhang, Genbao
12
2022
Design alternative assessment and selection: a novel Z-cloud rough number-based BWM-MABAC model. Zbl 1534.90066
Huang, Guangquan; Xiao, Liming; Pedrycz, Witold; Pamucar, Dragan; Zhang, Genbao; Martínez, Luis
5
2022
Distributed supply-chain project rescheduling. II: Distributed affected operations rescheduling algorithm. Zbl 1095.90548
Huang, G. Q.; Lau, J. S. K.; Mak, K. L.; Liang, L.
2
2006
Distributed project scheduling with information sharing in supply chains. I: An agent-based negotiation model. Zbl 1095.90042
Lau, J. S. K.; Huang, G. Q.; Mak, K. L.; Liang, L.
6
2005
Distributed project scheduling with information sharing in supply chains. II: Theoretical analysis and computational study. Zbl 1096.90019
Lau, J. S. K.; Huang, G. Q.; Mak, K. L.; Liang, L.
6
2005
Distributed supply-chain project rescheduling. I: Impacts of information-sharing strategies. Zbl 1080.90502
Huang, G. Q.; Lau, J. S. K.; Mak, K. L.; Liang, L.
2
2005
Modelling and optimisation for sustainable development policy assessment. Zbl 1068.90068
Cannon, M.; Kouvaritakis, B.; Huang, G.
1
2005
Generalized Morse theory and its applications to control and stability analysis. Zbl 0757.93014
Luxemburg, L. A.; Huang, G.
4
1991
Characterization of equilibrium points on the stability boundary via algebraic topology approach. Zbl 0677.58017
Huang, G.; Luxemburg, L. A.
1
1988
Control of reactive power and voltage in emergencies. Zbl 0561.90055
Zaborszky, J.; Huang, G.; Lin, S. Y.
3
1985

Citations by Year