Allahverdi, Ali Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. (English) Zbl 1231.90171 Decis. Mak. Manuf. Serv. 1, No. 1-2, 5-23 (2007). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Kuo, Wen-Hung; Yang, Dar-Li Single machine scheduling with past-sequence-dependent setup times and learning effects. (English) Zbl 1184.68132 Inf. Process. Lett. 102, No. 1, 22-26 (2007). MSC: 68M20 × Cite Format Result Cite Review PDF Full Text: DOI
Moccellin, João Vitor; Nagano, Marcelo Seido A structural property of flow shop sequencing with separated machine setup times. (Portuguese. English summary) Zbl 1176.90233 Pesqui. Oper. 27, No. 3, 487-515 (2007). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Ng, C. T.; Allahverdi, Ali; Al-Anzi, Fawaz S.; Cheng, T. C. Edwin The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times. (English) Zbl 1154.90477 Int. J. Oper. Res. 2, No. 2, 135-155 (2007). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Kacem, Imed Lower bounds for tardiness minimization on a single machine with family setup times. (English) Zbl 1143.90336 Int. J. Oper. Res., Taichung 4, No. 1, 18-31 (2007). MSC: 90B35 × Cite Format Result Cite Review PDF
Ruiz, Rubén; Allahverdi, Ali Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. (English) Zbl 1145.90027 Ann. Oper. Res. 156, 143-171 (2007). MSC: 90B35 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Winands, E. M. M. On polling systems with large setups. (English) Zbl 1149.90044 Oper. Res. Lett. 35, No. 5, 584-590 (2007). MSC: 90B22 60K25 × Cite Format Result Cite Review PDF Full Text: DOI Link
Burnetas, Apostolos; Economou, Antonis Equilibrium customer strategies in a single server Markovian queue with setup times. (English) Zbl 1124.60069 Queueing Syst. 56, No. 3-4, 213-228 (2007). MSC: 60K25 90B22 × Cite Format Result Cite Review PDF Full Text: DOI
Armentano, Vinícius Amaral; de França Filho, Moacir Felizardo Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach. (English) Zbl 1127.90021 Eur. J. Oper. Res. 183, No. 1, 100-114 (2007). MSC: 90B35 90B40 × Cite Format Result Cite Review PDF Full Text: DOI Link
Anghinolfi, Davide; Paolucci, Massimo Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach. (English) Zbl 1127.90020 Comput. Oper. Res. 34, No. 11, 3471-3490 (2007). MSC: 90B35 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Al-Anzi, Fawaz S.; Allahverdi, Ali A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. (English) Zbl 1128.90024 Eur. J. Oper. Res. 182, No. 1, 80-94 (2007). MSC: 90B35 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Pereira Lopes, Manuel J.; Valério de Carvalho, J. M. A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times. (English) Zbl 1113.90061 Eur. J. Oper. Res. 176, No. 3, 1508-1527 (2007). MSC: 90B35 90C57 × Cite Format Result Cite Review PDF Full Text: DOI