Valiño, G.; Rico, J. C.; Mateos, S.; Suarez, C. M.; Blanco, D. Methodology for set-up planning automation of turned parts. (English) Zbl 1128.90560 Int. J. Prod. Res. 45, No. 17, 3917-3947 (2007). MSC: 90B99 × Cite Format Result Cite Review PDF Full Text: DOI HAL
Gharbi, A.; Kenné, J.-P.; Hajji, A. Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups. (English) Zbl 1095.90028 Int. J. Prod. Res. 44, No. 2, 545-567 (2006). MSC: 90B30 90C15 90C39 × Cite Format Result Cite Review PDF Full Text: DOI Link
Mansouri, S. Afshin Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms. (English) Zbl 1082.90050 Int. J. Prod. Res. 43, No. 15, 3163-3180 (2005). MSC: 90B50 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Tseng, Fan T.; Stafford, Edward F. jun. Two MILP models for the \(N\times M\) SDST flowshop sequencing problem. (English) Zbl 1009.90042 Int. J. Prod. Res. 39, No. 8, 1777-1809 (2001). MSC: 90B35 90B80 × Cite Format Result Cite Review PDF Full Text: DOI
Randhawa, S. U.; Smith, T. A. An experimental investigation of scheduling non-identical, parallel processors with sequence-dependent set-up times and due dates. (English) Zbl 0908.90170 Int. J. Prod. Res. 33, No. 1, 59-69 (1995). MSC: 90B35 90B30 × Cite Format Result Cite Review PDF Full Text: DOI
Skrikar, Bellur N.; Ghosh, Soumen A MILP model for the n-job, M-stage flowshop with sequence dependent set- up times. (English) Zbl 0605.90066 Int. J. Prod. Res. 24, 1459-1474 (1986). MSC: 90B35 90B30 90C11 65K05 × Cite Format Result Cite Review PDF Full Text: DOI
Rahman, S.; Nachlas, J. A. Formulation for a fixed-charge, separable nonlinear production planning problem. (English) Zbl 0547.90039 Int. J. Prod. Res. 21, 713-722 (1983). Reviewer: V.Dumitru MSC: 90B30 90C09 65K05 90C10 90C30 90C90 90B35 × Cite Format Result Cite Review PDF Full Text: DOI