Li, Xue; He, Zhengwen; Wang, Nengmin A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective. (English) Zbl 07877708 Comput. Oper. Res. 166, Article ID 106623, 20 p. (2024). MSC: 90Bxx × Cite Format Result Cite Review PDF Full Text: DOI
Zhang, Houkun; Ma, Ran; He, Zhengwen Project scheduling cost optimization based on resource transfer costs and robustness. (English) Zbl 07765553 Comput. Oper. Res. 161, Article ID 106445, 13 p. (2024). MSC: 90Bxx × Cite Format Result Cite Review PDF Full Text: DOI
He, Yukang; Jia, Tao; Zheng, Weibo Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty. (English) Zbl 07709802 Eur. J. Oper. Res. 310, No. 1, 34-52 (2023). MSC: 90Bxx × Cite Format Result Cite Review PDF Full Text: DOI
Ma, Yong; He, Zhengwen; Wang, Nengmin; Demeulemeester, Erik Tabu search for proactive project scheduling problem with flexible resources. (English) Zbl 1542.90106 Comput. Oper. Res. 153, Article ID 106185, 17 p. (2023). MSC: 90B35 90C10 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Li, Xue; He, Zhengwen; Wang, Nengmin; Vanhoucke, Mario Multimode time-cost-robustness trade-off project scheduling problem under uncertainty. (English) Zbl 1495.90182 J. Comb. Optim. 43, No. 5, 1173-1202 (2022). MSC: 90C29 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Tian, Wendi; Zhao, Yan; Demeulemeester, Erik Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty. (English) Zbl 1511.90219 Comput. Oper. Res. 143, Article ID 105795, 16 p. (2022). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Van Eynde, Rob; Vanhoucke, Mario A reduction tree approach for the discrete time/cost trade-off problem. (English) Zbl 1511.90225 Comput. Oper. Res. 143, Article ID 105750, 20 p. (2022). MSC: 90B35 90C59 × Cite Format Result Cite Review PDF Full Text: DOI Link
Zhang, Junguang; Wan, Dan Determination of early warning time window for bottleneck resource buffer. (English) Zbl 1476.90136 Ann. Oper. Res. 300, No. 1, 289-305 (2021). MSC: 90B35 90B36 × Cite Format Result Cite Review PDF Full Text: DOI
Chrétienne, Philippe Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures. (English) Zbl 1434.90051 J. Sched. 23, No. 1, 135-143 (2020). MSC: 90B35 68M20 90B25 × Cite Format Result Cite Review PDF Full Text: DOI
Wichmann, Matthias G.; Gäde, Maren; Spengler, Thomas S. A fuzzy robustness measure for the scheduling of commissioned product development projects. (English) Zbl 1464.90031 Fuzzy Sets Syst. 377, 125-149 (2019). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Aouam, Tarik; Vanhoucke, Mario An agency perspective for multi-mode project scheduling with time/cost trade-offs. (English) Zbl 1458.90246 Comput. Oper. Res. 105, 167-186 (2019). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Ingels, Jonas; Maenhout, Broos Employee substitutability as a tool to improve the robustness in personnel scheduling. (English) Zbl 1375.90155 OR Spectrum 39, No. 3, 623-658 (2017). MSC: 90B70 90B35 90B50 × Cite Format Result Cite Review PDF Full Text: DOI Link
Xiong, Jian; Chen, Yingwu; Zhou, Zhongbao Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations. (English) Zbl 1326.90032 J. Ind. Manag. Optim. 12, No. 2, 719-737 (2016). MSC: 90B35 90B50 68M20 90C31 × Cite Format Result Cite Review PDF Full Text: DOI OA License
Said, Samer S.; Haouari, Mohamed A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem. (English) Zbl 1390.90324 Appl. Math. Comput. 259, 628-636 (2015). MSC: 90B35 39A60 60K20 × Cite Format Result Cite Review PDF Full Text: DOI
Ingels, Jonas; Maenhout, Broos The impact of reserve duties on the robustness of a personnel shift roster: an empirical investigation. (English) Zbl 1348.90369 Comput. Oper. Res. 61, 153-169 (2015). MSC: 90B70 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Su, Zhi-xiong; Qi, Jian-xun; Wei, Han-ying A float-path theory and its application to the time-cost tradeoff problem. (English) Zbl 1346.90390 J. Appl. Math. 2015, Article ID 539374, 17 p. (2015). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI OA License
Choi, Byung-Cheon; Park, Myoung-Ju Min-max regret version of the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs. (English) Zbl 1330.90027 Asia-Pac. J. Oper. Res. 32, No. 5, Article ID 1550039, 16 p. (2015). MSC: 90B30 90C05 90C47 × Cite Format Result Cite Review PDF Full Text: DOI
Gabrel, Virginie; Murat, Cécile; Thiele, Aurélie Recent advances in robust optimization: an overview. (English) Zbl 1305.90390 Eur. J. Oper. Res. 235, No. 3, 471-483 (2014). MSC: 90C31 90B05 90B06 90B22 90C15 91B06 91B30 × Cite Format Result Cite Review PDF Full Text: DOI