He, Ruyan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work. (English) Zbl 1468.90049 J. Comb. Optim. 41, No. 2, 504-525 (2021). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI Link
Chen, Rubing; Yuan, Jinjiang; Geng, Zhichao ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost. (English) Zbl 1433.90062 Appl. Math. Comput. 365, Article ID 124697, 13 p. (2020). MSC: 90B35 68M20 90C60 90C29 × Cite Format Result Cite Review PDF Full Text: DOI
Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. Scheduling with release dates and preemption to minimize multiple max-form objective functions. (English) Zbl 1430.90296 Eur. J. Oper. Res. 280, No. 3, 860-875 (2020). MSC: 90B35 90C29 × Cite Format Result Cite Review PDF Full Text: DOI Link
Zhang, Yuan; Yuan, Jinjiang A note on a two-agent scheduling problem related to the total weighted late work. (English) Zbl 1423.90104 J. Comb. Optim. 37, No. 3, 989-999 (2019). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Li, Shisheng; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang Two-agent scheduling on a single sequential and compatible batching machine. (English) Zbl 1411.90151 Nav. Res. Logist. 64, No. 8, 628-641 (2017). MSC: 90B35 90C39 × Cite Format Result Cite Review PDF Full Text: DOI
Wan, Long; Yuan, Jinjiang; Wei, Lijun Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost. (English) Zbl 1410.90096 Appl. Math. Comput. 273, 912-923 (2016). MSC: 90B35 68M20 90C29 × Cite Format Result Cite Review PDF Full Text: DOI
Cheng, T. C. E.; Ng, C. T.; Yuan, J. J. Multi-agent scheduling on a single machine with max-form criteria. (English) Zbl 1129.90023 Eur. J. Oper. Res. 188, No. 2, 603-609 (2008). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI Link