He, Ruyan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work. (English) Zbl 1468.90049 J. Comb. Optim. 41, No. 2, 504-525 (2021). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI Link
Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. Scheduling with release dates and preemption to minimize multiple max-form objective functions. (English) Zbl 1430.90296 Eur. J. Oper. Res. 280, No. 3, 860-875 (2020). MSC: 90B35 90C29 × Cite Format Result Cite Review PDF Full Text: DOI Link
Li, Shisheng; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang Two-agent scheduling on a single sequential and compatible batching machine. (English) Zbl 1411.90151 Nav. Res. Logist. 64, No. 8, 628-641 (2017). MSC: 90B35 90C39 × Cite Format Result Cite Review PDF Full Text: DOI
Cheng, T. C. E.; Chung, Yu-Hsiang; Liao, Shan-Ci; Lee, Wen-Chiung Two-agent singe-machine scheduling with release times to minimize the total weighted completion time. (English) Zbl 1349.90329 Comput. Oper. Res. 40, No. 1, 353-361 (2013). MSC: 90B35 90C29 × Cite Format Result Cite Review PDF Full Text: DOI
Yin, Yunqiang; Cheng, Shuenn-Ren; Cheng, T. C. E.; Wu, Chin-Chia; Wu, Wen-Hsiang Two-agent single-machine scheduling with assignable due dates. (English) Zbl 1291.90102 Appl. Math. Comput. 219, No. 4, 1674-1685 (2012). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Cheng, T. C. E.; Wu, Wen-Hsiang; Cheng, Shuenn-Ren; Wu, Chin-Chia Two-agent scheduling with position-based deteriorating jobs and learning effects. (English) Zbl 1231.90182 Appl. Math. Comput. 217, No. 21, 8804-8824 (2011). MSC: 90B35 90C59 × Cite Format Result Cite Review PDF Full Text: DOI
Cheng, T. C. E.; Ng, C. T.; Yuan, J. J. Multi-agent scheduling on a single machine with max-form criteria. (English) Zbl 1129.90023 Eur. J. Oper. Res. 188, No. 2, 603-609 (2008). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI Link