Leung, Janny M. Y.; Levner, Eugene An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times. (English) Zbl 1133.90340 Oper. Res. Lett. 34, No. 4, 465-472 (2006). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Campbell, Ann Melissa; Hardin, Jill R. Vehicle minimization for periodic deliveries. (English) Zbl 1062.90012 Eur. J. Oper. Res. 165, No. 3, 668-684 (2005). MSC: 90B20 90B35 65Y20 90B80 × Cite Format Result Cite Review PDF Full Text: DOI
Kats, Vladimir; Levner, Eugene Cyclic scheduling in a robotic production line. (English) Zbl 0995.90032 J. Sched. 5, No. 1, 23-41 (2002). MSC: 90B35 90B30 × Cite Format Result Cite Review PDF Full Text: DOI
Kats, Vladimir; Levner, Eugene Minimizing the number of vehicles in periodic scheduling: The non-Euclidean case. (English) Zbl 0943.90035 Eur. J. Oper. Res. 107, No. 2, 371-377 (1998). MSC: 90B35 × Cite Format Result Cite Review PDF Full Text: DOI
Korst, Jan; Aarts, Emile; Lenstra, Jan Karel; Wessels, Jaap Periodic assignment and graph colouring. (English) Zbl 0807.05030 Discrete Appl. Math. 51, No. 3, 291-305 (1994). Reviewer: M.Kubale (Gdańsk) MSC: 05C15 05C90 94C15 × Cite Format Result Cite Review PDF Full Text: DOI
Carraresi, P.; Gallo, G. Network models for vehicle and crew scheduling. (English) Zbl 0537.90053 Eur. J. Oper. Res. 16, 139-151 (1984). MSC: 90B35 90-02 90C08 90B10 90C35 × Cite Format Result Cite Review PDF Full Text: DOI
Orlin, James B. Maximum-throughput dynamic network flows. (English) Zbl 0516.90027 Math. Program. 27, 214-231 (1983). MSC: 90B10 90C10 90C35 90B35 × Cite Format Result Cite Review PDF Full Text: DOI