Shahbazi, Behrooz; Rahmati, Seyed Habib A. Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach. (English) Zbl 1476.90102 SN Oper. Res. Forum 2, No. 4, Paper No. 51, 43 p. (2021). MSC: 90B25 90C35 90C59 90-10 × Cite Format Result Cite Review PDF Full Text: DOI
Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach. (English) Zbl 1434.90068 Ann. Oper. Res. 269, No. 1-2, 583-621 (2018). MSC: 90B35 90B25 × Cite Format Result Cite Review PDF Full Text: DOI