Found 8 Documents (Results 1–8)
A bicriterion scheduling problem involving total flowtime and total tardiness. (English) Zbl 0932.90015
An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system. (English) Zbl 0886.90087
MSC:
90B35
Single machine jobshop scheduling problem with weighted quadratic function of job lateness: A branch-and-bound approach. (English) Zbl 0861.90077
MSC:
90B35
Minimizing a quadratic function of job lateness in the single machine system. (English) Zbl 0803.90077
MSC:
90B35
A branch-and-bound approach to solve a bicriterion scheduling problem involving squared flowtime and maximum tardiness. (English) Zbl 0801.90066
MSC:
90B35
Filter Results by …
Author
- Sen, Tapan (8)
- Dileepan, Parthasarati (5)
- Raiszadeh, Farhad M. E. (4)
- Scott, Brian W. (1)
all
top 5
Volume
- 24, No. 1 (2003) (1)
- 20, No. 2 (1999) (1)
- 18, No. 1 (1997) (1)
- 16, No. 2 (1995) (1)
- 15, No. 2 (1994) (1)
- 15, No. 1 (1994) (1)
- 10, No. 3 (1989) (1)
- 8 (1987) (1)