Lead time anticipation in supply chain operations planning. (English) Zbl 1260.90034

Summary: Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process in the PU and the lead time that is difficult to capture in the LP model formulation. We propose a two-step lead time anticipation (LTA) procedure where the LP model is first solved irrespective of the available production capacity and is subsequently updated with aggregate order release targets. The order release targets are generated by a local smoothing algorithm that accounts for the evolution of the stochastic workload in the PU. A solution that is both feasible with respect to the planned lead time and meets the material requirements may not exist. By means of discrete event simulation, we compare a conservative strategy where the production quantities are reduced to an optimistic strategy where the planned lead time constraint is allowed to be violated.

MSC:

90B06 Transportation, logistics and supply chain management
90B10 Deterministic network models in operations research
90C05 Linear programming

References:

[1] Asmundsson J, Rardin RL, Uzsoy R (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans Semicond Manuf 19(1): 95–111 · doi:10.1109/TSM.2005.863214
[2] Asmundsson J, Rardin RL, Turkseven CH, Uzsoy R (2009) Production planning with resources subject to congestion. Naval Res Logist 56(2): 142–157 ISSN:1520-6750 · Zbl 1158.90337 · doi:10.1002/nav.20335
[3] Bertrand JWM, Wortmann JC, Wijngaard J (1990) Production control: a structural and design oriented approach. Elsevier, Amsterdam
[4] Bitran GR, Tirupati D (1993) Hierarchical production planning. Handbooks in OR & MS, vol 4, chap 10. North-Holland, pp 523–568
[5] Byrne MD, Bakir MA (1999) Production planning using a hybrid simulation–analytical approach. Int J Prod Econ 59(1–3): 305–311 · doi:10.1016/S0925-5273(98)00104-2
[6] De Kok AG (1989) A moment-iteration method for approximating the waiting-time characteristics of the gi/g/1 queue. Probab Eng Inf Sci 3: 273–287 · Zbl 1134.60414 · doi:10.1017/S0269964800001133
[7] De Kok AG (2003) Evaluation and optimization of strongly ideal assemble-to-order systems. In: Shanthikumar JG, Yao, DD, Zijm WHM (eds) Stochastic modeling and optimization of manufacturing systems and supply chains, pp 203–242 · Zbl 1149.90310
[8] De Kok AG, Fransoo JC (2003) Planning supply chain operations: definition and comparison of planning concepts. In: Handbooks in operations research and management science, vol 11, pp 597–676. ISSN:0927-0507
[9] Graves SC (1986) A tactical planning model for a job shop. Oper Res 34(4): 522–533 · Zbl 0609.90061 · doi:10.1287/opre.34.4.522
[10] Hackman ST, Leachman RC (1986) A general framework for modeling production. Manag Sci 35(4): 478–495 · doi:10.1287/mnsc.35.4.478
[11] Hopp WJ, Spearman ML (2011) Factory physics. Irwin McGraw-Hill
[12] Hung YF, Hou MC (2001) A production planning approach based on iterations of linear programming optimization and flow time prediction. J Chines Inst Ind Eng 18(3): 55–67
[13] Hung YF, Leachman RC (1996) A production planning methodology for semiconductor manufacturingbased on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2): 257–269 · doi:10.1109/66.492820
[14] Hwang S, Uzsoy R (2005) A single stage multi-product dynamic lot sizing model with work in process and congestion. Technical report, Purdue University
[15] Irdem DF, Kacar NB, Uzsoy R (2008) An experimental study of an iterative simulation-optimization algorithm for production planning. In: Proceedings of the 40th conference on winter simulation, pp 2176–2184
[16] Karmarkar US (1989) Capacity loading and release planning with work-in-progress (WIP) and leadtimes. J Manuf Oper Manag 2: 105–123
[17] Karmarkar US (1993) Logistics of production and inventory. In: Manufacturing lead times, order release and capacity loading, vol 4. North-Holland, pp 287–329
[18] Kim B, Kim S (2001) Extended model for a hybrid production planning approach. Int J Prod Econ 73(2): 165–173 · doi:10.1016/S0925-5273(00)00172-9
[19] Kohler-Gudum C, De Kok AG (2002) A safety stock adjustment procedure to enable target service levels in simulation of generic inventory systems. Technical report, Eindhoven University of Technology
[20] Law A (2007) Simulation modeling and analysis, 4th edn. McGraw-Hill
[21] Meyr H, Wagner M, Rohde J (2005) Structure of advanced planning systems. Supply chain management and advanced planning, pp 109–115
[22] Missbauer H (2002) Aggregate order release planning for time-varying demand. Int J Prod Res 40(3): 699–718 · Zbl 1060.90508 · doi:10.1080/00207540110090939
[23] Missbauer H (2009) Models of the transient behaviour of production units to optimize the aggregate material flow. Int J Prod Econ 118(2): 387–397 · doi:10.1016/j.ijpe.2008.11.014
[24] Missbauer H (2010) Order release planning with clearing functions: a queueing-theoretical analysis of the clearing function concept. Int J Prod Econ (in press)
[25] Pahl J, Voß S, Woodruff DL (2007) Production planning with load dependent lead times: an update of research. Ann Oper Res 153(1): 297–345 ISSN:0254-5330 · Zbl 1159.90381 · doi:10.1007/s10479-007-0173-5
[26] Riano G (2002) Transient behavior of stochastic networks: application to production planning with load-dependent lead times. PhD thesis, Georgia Institute of Technology
[27] Schneeweiss C (2003) Distributed decision making, 2nd edn. Springer, Berlin · Zbl 1079.90074
[28] Selçuk B (2007) Dynamic performance of hierarchical planning systems: modeling and evaluation with dynamic planned lead times. PhD thesis, Eindhoven University of Technology
[29] Peterson R (1998) Inventory management and production planning and scheduling, 3rd edn. Wiley, New York
[30] Simpson NC (1999) Multiple level production planning in rolling horizon assembly environments. Eur J Oper Res 114(1): 15–28 ISSN:0377-2217 · Zbl 0949.90035 · doi:10.1016/S0377-2217(98)00005-8
[31] Spitter JM, Hurkens CAJ, De Kok AG, Lenstra JK, Negenman EG (2004) Linear programming models with planned lead times for supply chain operations planning. Eur J Oper Res 163: 706–720 · Zbl 1071.90512 · doi:10.1016/j.ejor.2004.01.019
[32] Stadtler H (2005) Supply chain management and advanced planning–basics, overview and challenges. Eur J Oper Res 163(3): 575–588 · Zbl 1072.90502 · doi:10.1016/j.ejor.2004.03.001
[33] van Houtum GJ (2006) Multiechelon production/inventory systems: optimal policies, heuristics, and algorithms. Tutorial in operations research, INFORMS 2006
[34] Vollmann TE, Berry WL, Whybark DC (1984) Manufacturing planning and control systems. Dow Jones-Irwin, Homewood
[35] Zipkin PH (2000) Foundations of inventory management. McGraw-Hill, New York · Zbl 1370.90005
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.