×

Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments. (English) Zbl 1241.90007

Summary: This paper studies the multi-stage logistics and inventory problem in an assembly-type supply chain where a uniform lot size is produced uninterruptedly with a single setup at each stage. Partial lots, or sub-batches, can be transported to next stage upon completion. Unequal sub-batch sizes at each stage follow geometric series and the numbers of sub-batches across stages are allowed to be different. Since the mainline and each branch line of an assembly-type supply chain are series-type supply chains, a model of the series-type supply chain is first established and a model of the assembly-type supply chain is subsequently developed. Optimization algorithms that determine the economic lot sizes, the optimal sub-batch sizes and the number of sub-batches for each stage are developed. The polynomial-time algorithms incorporate the optimality properties derived in the paper to find the lower and upper bounds of the solutions by constructing the solution ranges and then the optimal solutions accordingly.

MSC:

90B05 Inventory, storage, reservoirs
90C90 Applications of mathematical programming
Full Text: DOI

References:

[1] Yung, K.L., Tang, J., Andrew, W.H.Ip., Wang, D.: Heuristics for joint decisions in production, transportation, and order quantity. Transp. Sci. 40, 99–116 (2006) · doi:10.1287/trsc.1040.0111
[2] Rudberg, M., Olhager, J.: Manufacturing networks and supply chains: an operations strategy perspective. Omega-Int. J. Manage. S. 31, 29–39 (2003) · doi:10.1016/S0305-0483(02)00063-4
[3] Handfield, R.B., Nichols, E.L.: Introduction to Supply Chain Management. Prentice Hall, Englewood Cliffs (1999)
[4] Geunes, J., Pardalos, P.M., Romeijn, H.E.: Supply Chain Optimization: Applications and Algorithms. Kluwer Academic, Dordrecht (2002) · Zbl 0984.00036
[5] Geunes, J., Pardalos, P.M.: Supply Chain Optimization. Kluwer Academic, Dordrecht (2003) · Zbl 1054.90080
[6] Pardalos, P.M., Tsitsiringos, V.: Financial Engineering, Supply Chain and E-commerce. Kluwer Academic, Dordrecht (2002) · Zbl 0994.00020
[7] Alcali, E., Geunes, J., Pardalos, P.M., Romeijn, H.E., Shen, Z.J.: Applications of Supply Chain Management and E-commerce Research in Industry. Kluwer Academic, Dordrecht (2004)
[8] Spekman, R.E., Kamauff, J.W., Salmond, D.J.: At last purchasing is becoming strategic. Long Range Plan. 27, 76–84 (1994) · doi:10.1016/0024-6301(94)90211-9
[9] Zhang, C., Tan, G.W., Robb, D.J., Zheng, X.: Sharing shipment quantity information in the supply chain. Omega-Int. J. Manage. S. 34, 427–438 (2006) · doi:10.1016/j.omega.2004.12.005
[10] Quinn, J.: What’s the buzz? Supply chain management. Logist. Manag. 36, 43 (1997)
[11] Ratliff, H.D.: Logistics management: integrate your way to an improved bottom line. IIE Solut. 27, 31 (1995)
[12] Ganeshan, R.: Managing supply chain inventories: a multiple retailer, one warehouse, multiple supplier model. Int. J. Prod. Econ. 59, 341–354 (1999) · doi:10.1016/S0925-5273(98)00115-7
[13] Szendrovits, A.Z.: Manufacturing cycle time determination for a multi-stage economic production quantity model. Manage. Sci. 22, 298–308 (1975) · Zbl 0313.90017 · doi:10.1287/mnsc.22.3.298
[14] Goyal, S.K.: Note on: manufacturing cycle time determination for a multi-stage economic production quantity model. Manage. Sci. 23, 332–333 (1976) · Zbl 0348.90035 · doi:10.1287/mnsc.23.3.332
[15] Goyal, S.K.: Economic batch quantity in a multi-stage production system. Int. J. Prod. Res. 16, 267–273 (1977a) · doi:10.1080/00207547808930019
[16] Szendrovits, A.Z., Drezner, Z.: Optimizing multi-stage production with constant lot size and varying numbers of batches. Omega-Int. J. Manage. S. 8, 623–629 (1980) · doi:10.1016/0305-0483(80)90003-1
[17] Goyal, S.K.: Determination of optimum production quantity for a two-stage production system. Oper. Res. Quart. 28, 865–870 (1977b) · Zbl 0365.90073 · doi:10.1057/jors.1977.174
[18] Banerjee, A.: A joint economic lot size model for purchaser and vendor. Decis. Sci. 17, 292–311 (1986) · doi:10.1111/j.1540-5915.1986.tb00228.x
[19] Goyal, S.K., Szendrovits, A.Z.: A constant lot size model with equal and unequal sized batch shipments between production stages. Eng. Cost Prod. Econ. 10, 203–210 (1986)
[20] Goyal, S.K.: A joint economic lot size model for purchaser and vendor: a comment. Decis. Sci. 19, 236–241 (1988) · doi:10.1111/j.1540-5915.1988.tb00264.x
[21] Vercellis, C.: Multi-plant production planning in capacitated self-configuring two-stage serial systems. European J. Oper. Res. 119, 451–460 (1999) · Zbl 0948.90057 · doi:10.1016/S0377-2217(99)00146-0
[22] Cachon, G.P., Zipkin, P.H.: Competitive and cooperative inventory policies in a two-stage supply chain. Manage. Sci. 45, 936–953 (1999) · Zbl 1231.90013 · doi:10.1287/mnsc.45.7.936
[23] Bogaschewsky, R.W., Buscher, U.D., Lindner, G.: Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. Omega-Int. J. Manage. S. 29, 183–191 (2001) · doi:10.1016/S0305-0483(00)00040-2
[24] Hoque, M.A., Kingsman, B.G.: Synchronization in common cycle lot size scheduling for a multi-product serial supply chain. Int. J. Prod. Econ. 103, 316–331 (2006) · doi:10.1016/j.ijpe.2005.08.007
[25] Buscher, U.D., Lindner, G.: Optimizing a production system with rework and equal sized batch shipments. Comput. Oper. Res. 34, 515–535 (2007) · Zbl 1113.90027 · doi:10.1016/j.cor.2005.03.011
[26] Wang, S., Sarker, B.R.: An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy. European J. Oper. Res. 162, 153–172 (2005) · Zbl 1132.90302 · doi:10.1016/j.ejor.2003.10.038
[27] Rahman, M.A.A., Sarker, B.R.: Supply chain models for an assembly system with preprocessing of raw materials. European J. Oper. Res. 181, 733–752 (2007) · Zbl 1131.90307 · doi:10.1016/j.ejor.2006.08.015
[28] Liang, D., Wilhelm, W.E.: Decomposition schemes and acceleration techniques in application to production–assembly–distribution system design. Comput. Oper. Res. 35, 4010–4026 (2008) · Zbl 1278.90130 · doi:10.1016/j.cor.2007.07.003
[29] Zou, X., Pokharel, S., Piplani, R.: A two-period supply contract model for a decentralized assembly system. European J. Oper. Res. 187, 257–274 (2008) · Zbl 1133.90304 · doi:10.1016/j.ejor.2007.03.011
[30] Hnaien, F., Delorme, X., Dolgui, A.: Genetic algorithm for supply planning in two-level assembly systems with random lead times. Eng. Appl. Artif. Intell. 22, 906–915 (2009) · doi:10.1016/j.engappai.2008.10.012
[31] Che, Z.H., Chiang, C.J.: A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly. Adv. Eng. Softw. 4(1), 1011–1022 (2010) · Zbl 1231.90397 · doi:10.1016/j.advengsoft.2010.04.001
[32] Leng, M., Parlar, M.: Game-theoretic analyses of decentralized assembly supply chains: non-cooperative equilibria vs. coordination with cost-sharing contracts. European J. Oper. Res. 204, 96–104 (2010) · Zbl 1178.90043 · doi:10.1016/j.ejor.2009.10.011
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.