×

Designing multi-echelon service parts networks with finite repair capacity. (English) Zbl 1176.90032

Summary: We propose an approach to model and solve the joint problem of facility location, inventory allocation and capacity investment in a two echelon, single-item, service parts supply chain with stochastic demand. The objective of the decision problem is to minimize the total expected costs associated with (1) opening repair facilities, (2) assigning each field service location to an opened facility, (3) determining capacity levels of the opened repair facilities, and (4) optimizing inventory allocation among the locations. Due to the size of the problem, computational efficiency is essential. The accuracy of the approximations and effectiveness of the approach are analyzed with two numerical studies. The approach provides optimal results in 90% of scenarios tested and was within 2% of optimal when it did not.We explore the impact of capacity utilization, inventory availability, and lead times on the performance of the approach. We show that including tactical considerations jointly with strategic network design resulted in additional cost savings from 3% to 12%. Our contribution is the development of a practical model and approach to support the decision making process of joint facility location and multi-echelon inventory optimization.

MSC:

90B05 Inventory, storage, reservoirs
90C10 Integer programming
90C30 Nonlinear programming
Full Text: DOI

References:

[1] Caggiano, K. E.; Muckstadt, J. A.; Rappold, J. A., Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system, Manufacturing & Service Operations Management, 8, 292-319 (2006)
[2] Daskin, M. S.; Coullard, C. R.; Shen, Z. J.M., An inventory-location model: Formulation, solution algorithm and computational results, Annals of Operations Research, 110, 83-106 (2002) · Zbl 1013.90001
[3] De Smit, J. H.A., The queue GI/M/s with customers of different types or the queue GI/Hm/s, Advances in Applied Probability, 15, 392-419 (1983) · Zbl 0512.60086
[4] Diaz, A.; Fu, M. C., Models for multi-echelon repairable item inventory systems with limited repair capacity, European Journal of Operational Research, 97, 480-492 (1997) · Zbl 0927.90003
[5] Drezner, Z., Facility Location: A Survey of Applications and Methods (1995), Springer-Verlag: Springer-Verlag New York
[6] Eppen, G.; Schrage, L., Centralized ordering policies in a multi-warehouse system with lead times and random demand, (Schwarz, L. B., Multi-Level Production/Inventory Systems: Theory and Practice, vol. 16 (1981), North Holland: North Holland New York) · Zbl 0471.90044
[7] Graves, S. C., A multi-echelon inventory model for a repairable item with one-for-one replenishment, Management Science, 31, 1247-1256 (1985) · Zbl 0601.90035
[8] Palm, C., Analysis of the Erlang traffic formula for busy signal arrangements, Ericsson Technics, 5, 39-58 (1938)
[9] Prabhu, N. U., Queues and Inventories: A Study of Their Basic Stochastic Processes (1965), John Wiley and Sons: John Wiley and Sons New York · Zbl 0131.16904
[10] Pyke, D. F., Priority repair and dispatch policies for repairable-item logistics systems, Naval Research Logistics, 37, 1-30 (1990)
[11] Shen, Z. J.M.; Coullard, C. R.; Daskin, M. S., A joint location-inventory model, Transportation Science, 37, 40-55 (2003)
[12] Shen, Z. J.M.; Daskin, M. S., Trade-offs between customer service and cost in integrated supply chain design, Manufacturing and Service Operations Management, 7, 188-207 (2005)
[13] Sherbrooke, C. C., METRIC: A multi-echelon technique for recoverable item control, Operations Research, 16, 122-141 (1968)
[14] Slay, F. M.; Sherbrooke, C. C., The Nature of the Aircraft Component Failure Process: A Working Note (1988), Logistics Management Institute: Logistics Management Institute Bethesda, Maryland
[15] Sleptchenko, A.; van der Heijden, M.; van Harten, A., Trade-off between inventory and repair capacity in spare part networks, Journal of the Operational Research Society, 54, 263-272 (2003) · Zbl 1171.90327
[16] Snyder, L.V., 2004. Facility Location Under Uncertainty: A Review. Technical report 04T-015.; Snyder, L.V., 2004. Facility Location Under Uncertainty: A Review. Technical report 04T-015.
[17] Tsiakis, T.; Shah, N.; Pantelides, C. C., Design of multi-echelon supply chain networks under demand uncertainty, Industrial and Engineering Chemistry Research, 40, 3585-3604 (2001)
[18] Van der Heijden, M. C.; van Harten, A.; Sleptchenko, A., Approximations for markovian multi-class queues with preemptive priorities, Operations Research Letters, 32, 273-282 (2004) · Zbl 1045.90015
[19] Van Roo, B.D., 2007. Strategic Models for Designing Multi-echelon Inventory Networks with Finite Repair Capacity and Capabilities. Ph.D. Dissertation, School of Business, University of Wisconsin-Madison.; Van Roo, B.D., 2007. Strategic Models for Designing Multi-echelon Inventory Networks with Finite Repair Capacity and Capabilities. Ph.D. Dissertation, School of Business, University of Wisconsin-Madison.
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.