×

Optimal production run length for products sold with warranty. (English) Zbl 0985.90032

Summary: This article studies the optimal production run length for a deteriorating production system in which the products are sold with free minimal repair warranty. The deterioration process of the system is characterized by a two-state continuous-time Markov chain. For products sold with free minimal repair warranty, we show that there exists a unique optimal production run length such that the expected total cost per item is minimized. Since there is no closed form expression for the optimal production run length, an approximate solution is derived. In addition, three special cases which provide bounds for searching the optimal production run length are investigated and some sensitivity analysis is carried out to study the effects of the model parameters on the optimal production run length. Finally, a numerical example is given to evaluate the performance of the optimal production run length.

MSC:

90B30 Production models
90C40 Markov and semi-Markov decision processes
Full Text: DOI

References:

[1] Blischke, W. R.; Murthy, D. N.P., Product warranty management - I: A taxonomy for warranty policies, European Journal of Operational Research, 62, 127-148 (1992) · Zbl 0775.90175
[2] Djamaludin, I.; Murthy, D. N.P.; Wilson, R. J., Quality control through lot sizing for items sold with warranty, International Journal of Production Economics, 33, 97-107 (1994)
[3] L.A. Johnson, D.C. Montgomery, Operations Research in Production Planning Scheduling and Inventory Control, McGraw-Hill, New York, 1980; L.A. Johnson, D.C. Montgomery, Operations Research in Production Planning Scheduling and Inventory Control, McGraw-Hill, New York, 1980
[4] Kim, H. C.; Hong, Y., An extended EMQ model for a failure prone machine with general lifetime distribution, International Journal of Production Economics, 49, 215-223 (1997)
[5] Lee, H. L.; Rosenblatt, M. J., Simultaneous determination of production cycle and inspection schedule in a production system, Management Science, 33, 9, 1125-1136 (1987) · Zbl 0628.90032
[6] Lee, H. L.; Rosenblatt, M. J., A production and maintenance planning model with restoration cost dependent on detection delay, IIE Transactions, 21, 4, 368-375 (1989)
[7] Lee, H. L., Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework, Management Science, 38, 9, 1314-1328 (1992) · Zbl 0758.90040
[8] Murthy, D. N.P., Optimal reliability choice in product design, Engineering Optimization, 15, 281-294 (1990)
[9] Murthy, D. N.P.; Blischke, W. R., Product warranty management - II: An integrated framework for study, European Journal of Operational Research, 62, 261-281 (1992) · Zbl 0775.90175
[10] Murthy, D. N.P.; Blischke, W. R., Product warranty management - III: A review of mathematical models, European Journal of Operational Research, 63, 1-34 (1992) · Zbl 0825.90421
[11] Murthy, D. N.P.; Wilson, R. J.; Djamaludin, I., Product warranty and quality control, Quality and Reliability Engineering, 9, 431-443 (1993)
[12] Porteus, E. L., Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research, 34, 1, 137-144 (1986) · Zbl 0591.90043
[13] Rosenblatt, M. J.; Lee, H. L., Economic production cycles with imperfect production process, IIE Transactions, 18, 48-55 (1986)
[14] Tseng, S. T., Optimal preventive maintenance policy for deteriorating production system, IIE Transactions, 28, 687-694 (1996)
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.