The risk of delay of a project in terms of the morphology of its network. (English) Zbl 0933.90032

From the text: The objective of this paper is the development of a system of indicators to describe the morphology of a project network and to study the statistical distribution of the total duration in terms of such indicators. The risk of delay above any given limit can be easily determined using the estimated distribution. Also, an automatic procedure to produce pictures of the network is discussed and successfully tested.

MSC:

90B35 Deterministic scheduling theory in operations research
Full Text: DOI

References:

[1] Battersby, A., 1967. Network Analysis for Planning and Scheduling. Macmillan, New York; Battersby, A., 1967. Network Analysis for Planning and Scheduling. Macmillan, New York · Zbl 0388.90020
[2] Clark, C. E., The PERT model for the distribution of an activity time, Operations Research, 10, 405-406 (1962)
[3] Elmaghraby, S.E., 1977. Activity Networks: Project Planning and Control by Network Models. Wiley, New York; Elmaghraby, S.E., 1977. Activity Networks: Project Planning and Control by Network Models. Wiley, New York · Zbl 0385.90076
[4] Foley, J.D., Van Dams, A., 1982. Fundamentals of Interactive Computer Graphics. Addison-Wesley, Reading, MA; Foley, J.D., Van Dams, A., 1982. Fundamentals of Interactive Computer Graphics. Addison-Wesley, Reading, MA
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.