An analytic framework for sequencing mixed model assembly lines. (English) Zbl 0825.90483
Software:
GAMSReferences:
[1] | ACNRTIS A., Proceedings of the Second International Conference on Computer Integrated Manufacturing (1990) |
[2] | BROOKE A., GAMS A Users’s Guide (1988) |
[3] | DOI: 10.1016/0305-0483(78)90004-X · doi:10.1016/0305-0483(78)90004-X |
[4] | DOI: 10.1080/00207547508943016 · doi:10.1080/00207547508943016 |
[5] | DOI: 10.1016/0305-0483(77)90115-3 · doi:10.1016/0305-0483(77)90115-3 |
[6] | KILBRIDGE M., Proceedings of the Third International Conference on Operations Research pp 247– (1963) |
[7] | DOI: 10.1287/opre.37.6.925 · Zbl 0689.90048 · doi:10.1287/opre.37.6.925 |
[8] | DOI: 10.1287/mnsc.35.2.192 · Zbl 0666.90040 · doi:10.1287/mnsc.35.2.192 |
[9] | DOI: 10.1080/00207548908942636 · doi:10.1080/00207548908942636 |
[10] | MONDEN Y., Toyota Production System (1983) |
[11] | DOI: 10.1080/00207547908919611 · doi:10.1080/00207547908919611 |
[12] | DOI: 10.1007/BF00713157 · doi:10.1007/BF00713157 |
[13] | DOI: 10.1287/mnsc.16.9.593 · Zbl 0194.19801 · doi:10.1287/mnsc.16.9.593 |
[14] | DOI: 10.1147/rd.294.0401 · doi:10.1147/rd.294.0401 |
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.