[1] |
Anthony, R. N., Planning and control systems: A framework for analysis (1965), Graduate School of Business Administration, Harvard University |
[2] |
Cornuejols, G.; Sridharan, R.; Thizy, J. M., A comparison of heuristics and relaxations for the capacitated plant location problem, European Journal of Operational Research, 50, 280-297 (1991) · Zbl 0734.90046 |
[3] |
Erlenkotter, D., A dual-based procedure for uncapacitated facility location, Operations Research, 26, 992-1009 (1978) · Zbl 0422.90053 |
[4] |
Garey, M. R.; Johnson, D. S.; Sethi, R., Complexity of flow shop and job shop scheduling, Mathematics of Operations Research, 1, 2, 117-129 (1976) · Zbl 0396.90041 |
[5] |
Hax, A. C.; Candea, D., Production and Inventory Management (1984), Prentice-Hall: Prentice-Hall Englewood Cliffs, NJ |
[6] |
Roy, T. J.van, A cross decomposition algorithm for capacitated facility location, Operations Research, 34, 1, 145-163 (1984) · Zbl 0594.90022 |
[7] |
Schrage, L., Implicit representation of variable upper bounds in linear programming, Mathematical Programming Study, 4, 118-132 (1975) · Zbl 0359.90049 |
[8] |
Wassenhove, L. N.van; Vanderhenst, P., Planning production in a bottleneck department, European Journal of Operational Research, 12, 127-137 (1983) |