×

On the time to failure of systems with large replenishable reverse time. (English. Russian original) Zbl 0738.90036

J. Sov. Math. 57, No. 5, 3429-3432 (1991); translation from Din. Sist., Kiev 6, 95-101 (1987).
See the review in Zbl 0666.90036.

MSC:

90B25 Reliability, availability, maintenance, inspection in operations research
60K15 Markov renewal processes, semi-Markov processes
60K25 Queueing theory (aspects of probability theory)
90B22 Queues and service in operations research

Citations:

Zbl 0666.90036
Full Text: DOI

References:

[1] G. N. Cherkesov,Reliability of Technical Systems with Surplus Time [in Russian], Soviet Radio, Moscow (1974).
[2] B. P. Kredentser,Predicting the Reliability of Systems with Surplus Time [in Russian], Naukova Dumka, Kiev (1978). · Zbl 0419.62077
[3] Yu. E. Obzherin, ”A Markov renewal process for systems with replenishable reserve time,” in:Analytic Methods of the Theory of Probability [in Russian], Inst. Matem. Akad. Nauk UkrSSR (1983), pp. 83–90.
[4] V. S. Korolyuk and A. F. Turbin,Markov Renewal Processes in System Reliability Problems [in Russian], Naukova Dumka, Kiev (1982). · Zbl 0508.60073
[5] V. S. Korolyuk and A. F. Turbin,Semimarkov Processes and their Applications [in Russian], Naukova Dumka, Kiev (1976). · Zbl 0371.60106
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.