Jump to content

Service 710 (CPTM)

From Wikipedia, the free encyclopedia
Service 710
Overview
Service typeCommuter rail
LocaleGreater São Paulo
First service4 May 2021; 3 years ago (2021-05-04)
Current operator(s) Companhia Paulista de Trens Metropolitanos
Websitewww.cptm.sp.gov.br
Route
Termini

Stops
  • 31
  • 24 (peak hours)
Distance travelled100.7 km (62.6 mi)
Average journey time2 hours, 8 minutes
Service frequencyEvery 6 minutes
Line(s) used
On-board services
Disabled accessFully accessible
Technical
Rolling stock
  • 40 Siemens/Mitsui/SGP Series 3000 (5 trains)
  • 304 CAF Series 7000 (38 trains)
  • 64 CAF Series 7500 (8 trains)
  • 232 Hyundai Rotem Series 9500 (29 trains)
Track gauge1,600 mm (5 ft 3 in)
Electrification3,000 V DC catenary
Operating speed80 km/h (50 mph)
Track owner(s) Companhia Paulista de Trens Metropolitanos
Route map
Rumo Logística
to Campinas
Down arrow
Jundiaí
Jundiaí rail yard
Várzea Paulista
Campo Limpo Paulista
Botujuru
Botujuru Tunnel
Francisco Morato
Baltazar Fidélis
Franco da Rocha
Caieiras
Perus
Vila Aurora
Jaraguá
Vila Clarice
Pirituba
Piqueri
Lapa
Água Branca
Av. Santa Marina
Palmeiras–Barra Funda
Up arrow
Down arrow
Luz
Brás
Roosevelt rail yard
Juventus–Mooca
Ipiranga
Tamanduateí
Meninos Brook
São Caetano do Sul–
Pref. Walter Braido
Utinga
Prefeito Saladino
Pref. Celso Daniel–
Santo André
Guarará Brook
Pirelli
opened 1943
closed 2006
Av. Manoel da Nóbrega
Capuava
Mauá
Guapituba
Ribeirão Pires–
Antônio Bespalec
Grande River
Est. Guilherme Pinto Monteiro
Rio Grande da Serra
Up arrow
MRS Logística
to Santos

Service 710 (Portuguese: Serviço 710) is a commuter rail service operated by Companhia Paulista de Trens Metropolitanos in the Greater São Paulo, Brazil. It is a route that unifies both lines 7-Ruby and 10-Turquoise of the metropolitan rail network of the state of São Paulo.[1] It offers a service from Jundiaí to Rio Grande da Serra stations and from Francisco Morato to Mauá during peak hours.[2] Outside the Francisco Morato-Mauá loop, commuter will have to leave the train and wait for the next one to proceed, with a 12 minutes headway.[3]

See also

[edit]

References

[edit]
  1. ^ Meier, Ricardo (30 April 2021). "CPTM lança "Serviço 710", com trens indo de Jundiaí a Rio Grande da Serra". Metrô CPTM (in Portuguese). Retrieved 1 May 2021.
  2. ^ Lobo, Renato (30 April 2021). "Confirmado: linhas 7 e 10 da CPTM serão unificadas". Via Trólebus (in Portuguese). Retrieved 1 May 2021.
  3. ^ "CPTM lança o Serviço 710 com melhorias na mobilidade dos passageiros das linhas 7-Rubi e 10-Turquesa". Companhia Paulista de Trens Metropolitanos (in Portuguese). 30 April 2021. Retrieved 1 May 2021.
[edit]