This article needs additional citations for verification. (March 2021) |
Tianhe Park station (Chinese: 天河公园站), is a station of Line 21 of the Guangzhou Metro. It started operations on 20 December 2019.[1] With the opening of Line 11 in December 2024, line 21 was truncated to here from Yuancun since October 2, 2024, as to allow renovation works in preparation for line 11 trains to serve that station instead. It will also be an interchange station with Line 13 in 2025.[2]
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 天河公园站 | ||||||||||
Traditional Chinese | 天河公園站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Tianhe Park, Huangpu Boulevard, Tianfu Road, Tianhe District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°07′40″N 113°21′27″E / 23.1277°N 113.3574°E | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 21 Line 11 (December 2024) Line 13 (2025) | ||||||||||
Platforms | 4 (2 island platforms) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 2102 | ||||||||||
History | |||||||||||
Opened | 20 December 2019 | ||||||||||
Services | |||||||||||
|
Prior to the opening of Line 11, the dismantling work of the section from this station to Yuancun of Line 21 began October 2, 2024. The southern terminus of Line 21 was adjusted north to this station, and platforms 3 and 4 on the inner platforms were put in use, whilst platforms 1 and 2 on the outer platforms were temporarily suspended. The 6B train type's shielding doors and glass panel false walls of the outer platform will be removed, and then the appropriate shielding doors of the 8A train type will be installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Yuancun station area and replace the signal system to Line 11 standards.[3]
Station layout
editWhen fully complete in 2024, the station's total construction area of the station will be 78558 square meters, which is equivalent to 2.3 Gongyuanqian stations and 3.3 Yangji stations. It will also be the largest station on the whole of Guangzhou Metro.[4]
The station has 2 underground island platforms. Platform 3 is for trains heading to Zengcheng Square, whilst platform 4 is for terminating trains. Platforms 1 and 2 are currently not in use as they are under renovation, however, they will be put into service when the renovation works are completed and Line 11 opens.
G | - | Exits B, E1, E2, F |
L1 | Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform | 11 U/C |
Island platform, doors will open on the right | ||
Platform 4 | 21 termination platform | |
Platform 3 | 21 towards Zengcheng Square (Tangdong) | |
Island platform, doors will open on the right | ||
Platform | 11 U/C |
Exits
editThere are 4 exits, lettered B, E1, E2 and F. Exits B and E1 are accessible. Exit B is located on Middle Huangpu Avenue, whilst exits E1, E2 and F are located on Tianfu Road.
Gallery
edit-
Platform 1
-
Paltform 2
-
Platform 1 projection showing both local and express trains
-
Concourse
-
Exit B
-
Exit E1
-
Exit E2
-
Exit F
References
edit- ^ "二十一号线真的官宣来啦!" (in Simplified Chinese). 19 December 2019.
- ^ "广州地铁13号线二期有了新进展 天河公园将借地围蔽施工" (in Simplified Chinese). 19 March 2019.
- ^ 李天研 (2024-09-11). "广州首条地铁环线11号线年底开通!10月2日起,21号线"天河公园-员村"段停运拆解" [Guangzhou's first subway loop line, Line 11, will open at the end of the year! Starting from October 2, the "Tianhe Park-Yuancun" section of Line 21 will be dismantled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-09-11. Retrieved 2024-10-02.
- ^ "天河公园站将成为广州规模最大地铁站". Guangzhou Metro (in Simplified Chinese). 13 August 2014.