List of power stations in Madagascar
Appearance
The following page lists all power stations in Madagascar. The list is not complete. You can assist by adding relevant referenced content.
Hydroelectric
[edit]Operational
[edit]Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
---|---|---|---|---|---|---|---|
Andekaleka Hydroelectric Power Station | Andekaleka | Vohitra River | Gravity | N/A | 91 MW | 1982, 2012 | |
Antelomita Hydroelectric Power Station | Anjeva Gara | Ikopa River | Gravity | N/A | 8.4 MW | 1930, 1952, 1953 | |
Farahantsana Hydroelectric Power Station | Mahitsy[1] | Ikopa River | Gravity | N/A | 28 MW | 2022 | |
Mandraka Power Station | Mandraka | Mandraka River | Gravity | Lake Mandraka | 24 MW | 1956 | |
Ankevirato Hydroelectric Power Station[2] | Tsarazaza | Rianamboa River | Gravity | 560 kW | 2023 |
Under construction
[edit]Hydroelectric station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes | |
---|---|---|---|---|---|---|---|---|
Volobe Hydroelectric Power Station | Ambodilazana | water power | 120 MW | 2027 | Compagnie générale d’hydroélectricité de Volobe (CGHV)[3] |
Proposed
[edit]Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
---|---|---|---|---|---|---|---|
Antetezambato Central[4] | Ambatofinandrahana District | ?? | Gravity | 140 MW[5] | (projected) | ||
Sahofika Hydroelectric Power Station[6] | Sahofika | Onive River | Gravity | Sahofika Reservoir | 205 MW[6] | 2024 (Expected) | |
Antananarivo Mixed Hydrosolar Power Station[7] | Antananarivo | Run of river | N/A | 35 MW[7] | 2026 (Expected) | ||
Ranomafana Hydroelectric Power Station | Ranomafana (95 km northwest of Antananarivo)[8] | -18°36’35.9S,47°1’13.27 E | Ikopa River[9] | Gravity | 2x32MW = 64 MW[10] | 202? (Expected) |
Thermal
[edit]Operational
[edit]Thermal power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Ambohimanambola Thermal power station | Ambohimanambola[11] | Heavy fuel oil | 105 MW[12] (7x15 MW) | 2024 | Jirama (state financed) | | ||
Mandroseza Power Plant | Antananarivo | Heavy fuel oil | 40 MW[13] | 202? | Symbion Power Mandroseza SA[14] | ||
Noor I Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 48 MW[13] | 2018 | Jovena | ||
Noor II Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 28 MW[13] | 2018 | Jovena | ||
Andaingo Thermal Power Station[15] | Andaingo | Biomass | 75 MW[15] | 2012 | CIRAD |
Solar
[edit]Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Ambatolampy Solar Power Station | Ambatolampy | Solar | 40 MW | April 2022 | Ambatolampy Solar Consortium | ||
Access Solar Power Station[16] | Antananarivo | Solar | 25 MW[16] | 2025 Expected | Access Power | ||
Centrale Solaire d’Andranotakatra | Belobaka, Mahajanga II[17] | 12 MW Solar central | Solar | 1.25 MW | 2022 | ||
Centrale Solaire d’Ambavahadinilakaka (Ihorombe) | Ambavahadinilakaka[18] | 470 kW Solar central | Solar | 470 kW | 2022 | Maherlla | |
Sambava Solar Power Station | Sambava[19] | Solar | 500 kW | March 2022 | Green Energy Solutions |
Hybride
[edit]Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
---|---|---|---|---|---|---|---|
Kimony Solar Hybride Central | Bemanonga, Menabe | Solar + Thermal | 1.4 MW operative, 3MW projected[20] | 2022 (1.4MW operative) | Green Energy Solutions (GES) + Jirama | ||
Sava Hybride Power Station | Sambava, Antalaha, Vohemar[21] | Solar + Thermal | 8 MW Thermal + 5MW solar | Green Yellow | |||
Tanambao Verrerie Solar-hybride central | Tanambao Verrerie, Toamasina | Solar + Thermal | 18MW | 2021 | Jirama | ||
Toliara Centrale Energetique | Besinjaka (Tulear)[22] | Thermal + Solar | 9 MW Thermal + 2.9 MW solar | Filatex Energy |
See also
[edit]References
[edit]- ^ MADAGASCAR : la centrale hydroélectrique de Farahantsana (28 MW) entre en service
- ^ commune-rurale-de-tsarazaza
- ^ Jirama achetera la production de Volobe
- ^ Centrale d'Antetezambato
- ^ 2424.mg
- ^ a b Jean Marie Takouleu (26 May 2020). "Madagascar: ADF supports Sahofika hydropower project with a €4 million loan". Paris: Afrik21.africa. Retrieved 16 September 2020.
- ^ a b Boris Ngounou (29 August 2019). "Madagascar: 35 MW hydroelectric power plant in project in Antananarivo". Paris: Afrik21.africa. Retrieved 16 September 2020.
- ^ La-centrale-hydroelectrique-de-Ranomafana-Ikopa-
- ^ meh.mg
- ^ Délestage: quelques années à tenir
- ^ Nouvelle Centrale Thermique à Ambohimanambola
- ^ 105 mw plant
- ^ a b c d e Towerco of Madagascar (30 January 2018). "Jovena: Two new 76 MW thermal power stations planted" (Translated from the original French language). Antananarivo: Towerco of Madagascar. Retrieved 15 September 2020.
- ^ Symbion
- ^ a b CIRAD (April 2013). "Decentralized rural electricity distribution: the first thermal power station using biomass in Madagascar". Paris: CIRAD. Retrieved 16 September 2020.
- ^ a b Access Power (September 2020). "Access Power: Our Projects In Madagascar". Dubai: Access Power. Retrieved 16 September 2020.
- ^ Rajoelina a Boeny
- ^ HAZAVANA HO AN’NY REHETRA POUR LA COMMUNE D’IHOSY
- ^ www.egedec.com
- ^ centrale-solaire-hybride-de-Morondava
- ^ PV Magazine
- ^ Energie à Toliara
External links
[edit]- Mini-Grid Market Opportunity Assessment: Madagascar As of March 2019.