An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Albert Street railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane central business district. To be built as an underground station directly beneath Albert Street, it will consist of two platforms. Construction commenced in October 2019, with it scheduled to open in 2024. The platforms are built at a depth of 31 metres. The station has two entrances. The main entrance lies to the south, while the second entrance is located to the north.

Property Value
dbo:abstract
  • Albert Street railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane central business district. To be built as an underground station directly beneath Albert Street, it will consist of two platforms. Construction commenced in October 2019, with it scheduled to open in 2024. The platforms are built at a depth of 31 metres. The station will provide access to the mixed-use residential, employment and retail precinct adjoining the City Botanic Gardens, the financial district, Queen’s Wharf, the government precinct and Queensland University of Technology at Gardens Point. The station has two entrances. The main entrance lies to the south, while the second entrance is located to the north. (en)
dbo:address
  • Albert Street, Brisbane (en)
dbo:fareZone
  • Go cardzone 1
dbo:numberOfTracks
  • 2 (xsd:nonNegativeInteger)
dbo:openingYear
  • 2024-01-01 (xsd:gYear)
dbo:owner
dbo:owningOrganisation
dbo:railwayPlatforms
  • 2
dbo:servingRailwayLine
dbo:stationStructure
  • Underground
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 54314976 (xsd:integer)
dbo:wikiPageLength
  • 5231 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1116334356 (xsd:integer)
dbo:wikiPageWikiLink
dbp:address
dbp:disabled
  • Yes (en)
dbp:electrified
  • Yes (en)
dbp:imageCaption
  • Albert Street railway station under construction in February 2021 (en)
dbp:line
dbp:name
  • Albert Street (en)
dbp:opened
  • 2024 (xsd:integer)
dbp:operator
  • Queensland Rail (en)
dbp:owned
dbp:platform
  • 2 (xsd:integer)
dbp:status
  • Under construction (en)
dbp:structure
  • Underground (en)
dbp:style
  • TransLink (en)
dbp:tracks
  • 2 (xsd:integer)
dbp:web
dbp:wikiPageUsesTemplate
dbp:zone
  • Go card zone 1 (en)
dct:subject
rdf:type
rdfs:comment
  • Albert Street railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane central business district. To be built as an underground station directly beneath Albert Street, it will consist of two platforms. Construction commenced in October 2019, with it scheduled to open in 2024. The platforms are built at a depth of 31 metres. The station has two entrances. The main entrance lies to the south, while the second entrance is located to the north. (en)
rdfs:label
  • Albert Street railway station (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Albert Street (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License