×

Scheduling in-house transport vehicles to feed parts to automotive assembly lines. (English) Zbl 1402.90052

Summary: Due to exorbitant product variety, very limited space, and other factors, organizing efficient and timely deliveries of parts and subassemblies to final assembly within the factory is one of the most pressing problems of modern mixed-model assembly production. Many automobile producers have implemented the so-called “supermarket” concept to transfer material to the assembly line frequently and in small lots. Supermarkets are decentralized logistics areas on the shop floor where parts are intermediately stored for nearby assembly cells, to be ferried there by small transport vehicles (called tow trains or tuggers). This paper tackles the operational problem of drawing up schedules for these tow trains, such that the assembly line never starves for parts while also minimizing in-process inventory, thus satisfying just-in-time goals. We prove strong NP-completeness of the problem and present exact and heuristic solution methods. In a computational study, the procedures are shown to perform very well, solving realistic instances to (near-)optimality in a matter of minutes, clearly outperforming the simple cyclic schedules commonly used in industrial practice. We also provide some managerial insight into the right degree of automation for such a part feeding system.

MSC:

90B35 Deterministic scheduling theory in operations research
90B06 Transportation, logistics and supply chain management
90B30 Production models

Software:

Tabu search
Full Text: DOI

References:

[1] Akıllığlu, A. H.; Baydoğan, M. G.; Bolatlı, Y.; Canbaz, D.; Halıcı, A.; Sezgin, Ö., Pull-based milk-run distribution system design for a firm producing diesel injectors, Journal of Industrial Engineering, 17, 2-15 (2006)
[2] Arostegui, M. A.; Kadipasaoglu, S. N.; Khumawala, B. M., An empirical comparison of tabu search, simulated annealing, and genetic algorithms for facilities location problems, International Journal of Production Economics, 103, 742-754 (2006)
[4] Battini, D.; Boysen, N.; Emde, S., Just-in-time supermarkets for part supply in the automobile industry, Journal of Management Control, 24, 209-217 (2013)
[5] Battini, D.; Faccio, M.; Persona, A.; Sgarbossa, F., “Supermarket warehouses”: Stocking policies optimization in an assembly-to-order environment, International Journal of Advanced Manufacturing Technology, 50, 775-788 (2010)
[6] Blazewicz, J.; Machowiak, M.; Weglarz, J.; Kovalyov, M. Y.; Trystram, D., Scheduling malleable tasks on parallel processors to minimize the makespan, Annals of Operations Research, 129, 65-80 (2004) · Zbl 1056.90055
[7] Boysen, N.; Emde, S.; Hoeck, M.; Kauderer, M., Part logistics in the automotive industry: Decision problems, literature review and research agenda, European Journal of Operational Research, 242, 107-120 (2015) · Zbl 1341.90012
[8] Boysen, N.; Fliedner, M.; Scholl, A., Assembly line balancing: Joint precedence graphs under high product variety, IIE Transactions, 41, 183-193 (2009)
[9] Bozer, Y. A.; McGinnis, L. F., Kitting versus line stocking: A conceptual framework and a descriptive model, International Journal of Production Economics, 28, 1-19 (1992)
[10] Choi, W.; Lee, Y., A dynamic part-feeding system for an automotive assembly line, Computers & Industrial Engineering, 43, 123-134 (2002)
[11] Emde, S., Scheduling the replenishment of just-in-time supermarkets in assembly plants, OR Spectrum (2016)
[12] Emde, S.; Boysen, N., Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines, International Journal of Production Economics, 135, 393-402 (2012)
[13] Emde, S.; Boysen, N., Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines, European Journal of Operational Research, 217, 287-299 (2012) · Zbl 1244.90033
[14] Emde, S.; Fliedner, M.; Boysen, N., Optimally loading tow trains for JIT-supply of mixed-model assembly lines, IIE Transactions, 44, 121-135 (2012)
[15] Fathi, M.; Alvarez, M. J.; Hassani Mehraban, F.; Rodriguez, V., A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines, Mathematical Problems in Engineering, 2014 (2014) · Zbl 1407.90151
[16] Finnsgård, C.; Wänström, C.; Medbo, L.; Neumann, W. P., Impact of materials exposure on assembly workstation performance, International Journal of Production Research, 49, 7253-7274 (2011)
[17] Garey, M. R.; Johnson, D. S., Computers and intractability: A guide to the theory of NP-completeness (1979), W. H. Freeman: W. H. Freeman San Francisco, CA · Zbl 0411.68039
[18] Gendreau, M.; Hertz, A.; Laporte, G., A tabu search heuristic for the vehicle routing problem, Management Science, 40, 1276-1290 (1994) · Zbl 0822.90053
[19] Gendreau, M.; Potvin, J. Y., Tabu search, (Gendreau, M.; Potvin, J., Handbook of metaheuristics. Handbook of metaheuristics, International series in operations research and management science, vol. 146 (2010), Springer: Springer Berlin, Germany) · Zbl 1198.90002
[20] Glover, F.; Laguna, M., Tabu search (1997), Kluwer: Kluwer Boston, MA · Zbl 0930.90083
[21] Golz, J.; Gujjula, R.; Gunther, H.-O.; Rinderer, S.; Ziegler, M., Part feeding at high-variant mixed-model assembly lines, Flexible Services and Manufacturing Journal, 24, 119-141 (2012)
[22] Hertz, A., Finding a feasible course schedule using tabu search, Discrete Applied Mathematics, 35, 255-270 (1992) · Zbl 0800.90562
[23] Kilic, H. S.; Durmusoglu, M. B., A mathematical model and a heuristic approach for periodic material delivery in lean production environment, The International Journal of Advanced Manufacturing Technology, 69, 977-992 (2013)
[24] Limére, V.; Van Landeghem, H.; Goetschalckx, M.; Aghezzaf, E.-H.; McGinnis, L. F., Optimising part feeding in the automotive assembly industry: deciding between kitting and line stocking, International Journal of Production Research, 50, 4046-4060 (2012)
[25] Monden, Y., Toyota production system: An integrated approach to just-in-time (2011), CRC Press: CRC Press Boca Raton, FL
[26] Orlin, J. B., A polynomial time primal network simplex algorithm for minimum cost flows, Mathematical Programming, 78, 109-129 (1997) · Zbl 0888.90058
[27] Vaidyanathan, B. S.; Matson, J. O.; Miller, D. M.; Matson, J. E., A capacitated vehicle routing problem for just-in-time delivery, IIE Transactions, 31, 1083-1092 (1999)
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.