[1] |
Aghajani, M.; Ghodsi, R.; Javadi, B., Balancing of robotic mixed-model two-sided assembly line with robot setup times, Int. J. Adv. Manuf. Technol., 74, 1005-1016 (2014) · doi:10.1007/s00170-014-5945-x |
[2] |
Akpinar, S.; Bayhan, GM; Baykasoglu, A., Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence-dependent setup times between tasks, Appl. Soft Comput., 13, 1, 574-589 (2013) · doi:10.1016/j.asoc.2012.07.024 |
[3] |
Akpinar, S.; Baykasoglu, A., Modeling and solving mixed-model assembly line balancing problem with setups. Part I: a mixed-integer linear programming model, J. Manuf. Syst., 33, 1, 177-187 (2014) · doi:10.1016/j.jmsy.2013.11.004 |
[4] |
Akpinar, S.; Baykasoglu, A., Modeling and solving mixed-model assembly line balancing problem with setups. Part II: a multiple colony hybrid bees’ algorithm, J. Manuf. Syst., 33, 4, 445-461 (2014) · doi:10.1016/j.jmsy.2014.04.001 |
[5] |
Andres, C.; Miralles, C.; Pastor, R., Balancing and scheduling tasks in assembly lines with sequence-dependent setup times, Eur. J. Oper. Res., 187, 3, 1212-1223 (2008) · Zbl 1137.90476 · doi:10.1016/j.ejor.2006.07.044 |
[6] |
Cakir, B.; Altiparmak, F.; Dengiz, B., Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm, Comput. Ind. Eng., 60, 3, 376-384 (2011) · doi:10.1016/j.cie.2010.08.013 |
[7] |
Chutima, P.; Olanviwatchai, P., Mixed-model U-shaped assembly line balancing problems with coincidence memetic algorithm, J. Softw. Eng. Appl., 3, 347-363 (2010) · doi:10.4236/jsea.2010.34040 |
[8] |
Çil, ZA; Mete, S.; Ağpak, K., Analysis of the type II robotic mixed-model assembly line balancing problem, Eng. Optim., 49, 6, 990-1009 (2017) · doi:10.1080/0305215X.2016.1230208 |
[9] |
Gamberini, R.; Gebennini, E.; Grassi, A.; Regattieri, A., A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem, Int. J. Prod. Res., 47, 8, 2141-2164 (2009) · Zbl 1198.90181 · doi:10.1080/00207540802176046 |
[10] |
Geem, Z., Hwangbo, H.: Application of harmony search to multi-objective optimization for satellite heat pipe design. In: Proceedings of US-Korea Conference on Science, Technology and Entrepreneurship, Citeseer, Teaneck, NJ, USA, pp. 1-3 (2006) |
[11] |
Geem, ZW; Kim, JH; Loganathan, G., A new heuristic optimization algorithm: harmony search, Simulation, 76, 60-68 (2001) · doi:10.1177/003754970107600201 |
[12] |
Geem, Z.W.: Harmony Search Algorithms for Structural Design Optimization, 2010th edn. Studies in Computational Intelligence. Springer, Berlin (2010) |
[13] |
Hamta, N.; Ghomi, SF; Jolai, F.; Shirazi, MA, A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect, Int. J. Prod. Econ., 141, 1, 99-111 (2013) · doi:10.1016/j.ijpe.2012.03.013 |
[14] |
Hazir, O.; Dolgui, A., Assembly line balancing under uncertainty: robust optimization models and exact solution method, Comput. Ind. Eng., 65, 261-267 (2013) · doi:10.1016/j.cie.2013.03.004 |
[15] |
Hazir, O.; Dolgui, A., A decomposition-based solution algorithm for U-type assembly line balancing with interval data, Comput. Oper. Res., 59, 126-131 (2015) · Zbl 1348.90224 · doi:10.1016/j.cor.2015.01.010 |
[16] |
Jin, W.; He, Z.; Wu, Q., Robust optimization of resource-constrained assembly line balancing problems with uncertain operation times, Eng. Comput. (2021) · doi:10.1108/EC-01-2021-0061 |
[17] |
Lee, KS; Geem, ZW; Lee, SH; Bae, KW, The harmony search heuristic algorithm for discrete structural optimization, Eng. Optim., 37, 7, 663-684 (2005) · doi:10.1080/03052150500211895 |
[18] |
Li, Z.; Ding, R.; Floudas, CA, A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed-integer linear optimization, Ind. Eng. Chem. Res., 50, 10567-10603 (2011) · doi:10.1021/ie200150p |
[19] |
Li, Z.; Janardhanan, MN; Tang, Q.; Ponnambalam, SG, Model and metaheuristics for robotic two-sided assembly line balancing problems with setup times, Swarm Evol. Comput., 50, 100567 (2019) · doi:10.1016/j.swevo.2019.100567 |
[20] |
Lin, MH; Carlsson, JG; Ge, D.; Shi, J.; Tsai, JF, A review of piecewise linearization methods, Math. Probl. Eng. (2013) · Zbl 1296.90092 · doi:10.1155/2013/101376 |
[21] |
Liu, X.; Yang, X.; Lei, M., Optimization of mixed-model assembly line balancing problem under uncertain demand, J. Manuf. Syst., 59, 214-227 (2021) · doi:10.1016/j.jmsy.2021.02.019 |
[22] |
Lu, Z.; Cui, W.; Han, X., production and preventive maintenance scheduling for a single machine with failure uncertainty, Comput. Ind. Eng., 80, 236-244 (2015) · doi:10.1016/j.cie.2014.12.017 |
[23] |
Martino, L.; Pastor, P., Heuristic procedures for solving the general assembly line balancing problem with setups, Int. J. Prod. Res., 48, 6, 1787-1804 (2010) · doi:10.1080/00207540802577979 |
[24] |
Nilakantan, JM; Ponnambalam, SG; Jawahar, N., Design of energy efficient RAL system using evolutionary algorithms, Eng. Comput., 33, 2, 580-602 (2016) · doi:10.1108/EC-11-2014-0232 |
[25] |
Nilakantan, J.; Nielsen, I.; Ponnambalam, SG; Venkataramanaiah, S., Differential evolution algorithm for solving RALB problem using cost- and time-based models, Int. J. Adv. Manuf. Technol., 89, 311-332 (2016) · doi:10.1007/s00170-016-9086-2 |
[26] |
Nilakantan, JM; Ponnambalam, SG, Robotic U-shaped assembly line balancing using particle swarm optimization, Eng. Optim., 48, 231-252 (2016) · doi:10.1080/0305215X.2014.998664 |
[27] |
Nilakantan, MN; Li, Z.; Bocewicz, G.; Banaszak, Z.; Nielsen, P., Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times, Appl. Math. Model., 65, 256-270 (2019) · Zbl 1481.90157 · doi:10.1016/j.apm.2018.08.016 |
[28] |
Oksuz, MK; Buyukozkan, K.; Satoglu, SI, U-shaped assembly line worker assignment and balancing problem: a mathematical model and two meta-heuristics, Comput. Ind. Eng., 112, 246-263 (2017) · doi:10.1016/j.cie.2017.08.030 |
[29] |
Özcan, U., Balancing and scheduling tasks in parallel assembly lines with sequence-dependent setup times, Int. J. Prod. Econ., 213, 81-96 (2019) · doi:10.1016/j.ijpe.2019.02.023 |
[30] |
Özcan, U.; Toklu, B., Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming model, Comput. Oper. Res., 36, 3, 1955-1965 (2009) · Zbl 1179.90191 · doi:10.1016/j.cor.2008.06.009 |
[31] |
Özcan, U.; Toklu, B., Balancing two-sided assembly lines with sequence-dependent setup times, Int. J. Prod. Res., 48, 18, 5363-5383 (2010) · Zbl 1197.90224 · doi:10.1080/00207540903140750 |
[32] |
Pastor, R.; Andrés, C.; Miralles, C., Corrigendum to ‘‘Balancing and scheduling tasks in assembly lines with sequence-dependent setup” [European Journal of Operational Research 187 (2008) 1212-1223], Eur. J. Oper. Res., 201, 336 (2010) · Zbl 1177.90178 · doi:10.1016/j.ejor.2009.02.019 |
[33] |
Pereira, J., the Robust (min-max regret) assembly line worker assignment and balancing problem, Comput. Oper. Res., 93, 27-40 (2018) · Zbl 1391.90226 · doi:10.1016/j.cor.2018.01.009 |
[34] |
Pereira, J.; Miranda, EA, An exact approach for the robust assembly line balancing problem, Omega, 78, 85-98 (2017) · doi:10.1016/j.omega.2017.08.020 |
[35] |
Rabbani, M.; Moghaddam, M.; Manavizadeh, N., Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout, Int. J. Adv. Manuf. Technol., 59, 9-12, 1191-1210 (2012) · doi:10.1007/s00170-011-3545-6 |
[36] |
Rabbani, M.; Mousavi, Z.; Farrokhi-Asl, H., Multi-objective metaheuristics for solving a type II robotic mixed-model assembly line balancing problem, J. Ind. Prod. Eng., 33, 7, 472-484 (2016) |
[37] |
Ricart, J.; Huttemann, G.; Lima, J.; Baran, B., Multi-objective harmony search algorithm proposals, Electron. Notes Theor. Comput. Sci., 281, 51-67 (2011) · doi:10.1016/j.entcs.2011.11.025 |
[38] |
Rubinovitz, J., Bukchin, J.: Design and balancing of robotic assembly lines. In: Proceedings of the Fourth World Conference on Robotics Research, Pittsburgh, PA (1991) |
[39] |
Samouei, P.; Ashayeri, J., Developing optimization & robust models for a mixed-model assembly line balancing problem with semi-automated operations, Appl. Math. Model., 72, 259-275 (2019) · Zbl 1481.90160 · doi:10.1016/j.apm.2019.02.019 |
[40] |
Sarin, S.; Erel, E.; Dar-El, E., A methodology for solving single-model, stochastic assembly line balancing problem, Omega, 27, 5, 525-535 (1999) · doi:10.1016/S0305-0483(99)00016-X |
[41] |
Scholl, A.; Boysen, N.; Fliedner, M., The sequence-dependent assembly line balancing problem, OR Spect., 30, 3, 579-609 (2008) · Zbl 1193.90235 · doi:10.1007/s00291-006-0070-3 |
[42] |
Scholl, A.; Boysen, N.; Fliedner, M., The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics, OR Spectr., 35, 1, 291-320 (2013) · Zbl 1260.90098 · doi:10.1007/s00291-011-0265-0 |
[43] |
Seyed-Alagheband, S.; Ghomi, SF; Zandieh, M., A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks, Int. J. Prod. Res., 49, 3, 805-825 (2011) · doi:10.1080/00207540903471486 |
[44] |
Sivasubramani, S.; Swarup, KS, Multi-objective harmony search algorithm for optimal power flow problem, Int. J. Electr. Power Energy Syst., 33, 3, 745-752 (2011) · doi:10.1016/j.ijepes.2010.12.031 |
[45] |
Sobaszek, Ł.; Gola, A.; Świć, A.; Machado, J.; Soares, F.; Trojanowska, J.; Ivanov, V., The algorithms for robust scheduling of production jobs under machine failure and variable technological operation times, Innovations in Industrial Engineering. icieng 2021. Lecture Notes in Mechanical Engineering (2022), Cham: Springer, Cham |
[46] |
Thomopoulos, NT, Assembly Line Planning and Control (2014), Springer · Zbl 1274.90006 · doi:10.1007/978-3-319-01399-2 |
[47] |
Yang, XS; Geem, ZW, Harmony search as a metaheuristic algorithm, Music-Inspired Harmony Search Algorithm, Studies in Computational Intelligence, 1-14 (2009), Springer · doi:10.1007/978-3-642-00185-7_1 |
[48] |
Yılmaz, ÖF, Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times, Croat. Oper. Res. Rev. (2020) · Zbl 1458.90499 · doi:10.17535/crorr.2020.0018 |
[49] |
Yolmeh, A.; Kianfar, F., An efficient hybrid genetic algorithm to solve assembly line balancing problem with sequence-dependent setup times, Comput. Ind. Eng., 62, 4, 936-945 (2012) · doi:10.1016/j.cie.2011.12.017 |
[50] |
Zhang, Z.; Tang, Q.; Chica, M., A robust MILP and gene expression programming based on heuristic rules for mixed-model multi-manned assembly line balancing, Appl. Soft Comput., 109, 107513 (2021) · doi:10.1016/j.asoc.2021.107513 |
[51] |
Zhang, Z.; Tang, Q.; Zhang, L., Mathematical model and grey wolf optimization for low-carbon and low-noise U-shaped robotic assembly line balancing problem, J. Clean. Prod., 215, 744-756 (2019) · doi:10.1016/j.jclepro.2019.01.030 |
[52] |
Zhou, B.; Wu, Q., Decomposition-based bi-objective optimization for sustainable robotic assembly line balancing problems, J. Manuf. Syst., 55, 30-43 (2020) · doi:10.1016/j.jmsy.2020.02.005 |