Jump to content

Line 19 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GMB205 (talk | contribs) at 11:02, 24 December 2022 (Created page with '{{Short description|Future Shenzhen Metro line}} {{Infobox rail line | name = | other_name = | logo = <!--{{huge|{{rint|shenzhen|19}}}}--> | logo_width = | color = {{rcr|SZM|19}} | image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Shenzhen Metro | status = Under planning | locale = Shenzhen, Guangdong | start = {{stl|SZM|Nantangwei}} (Phase 1)...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Line 19
Overview
StatusUnder planning
LocaleShenzhen, Guangdong
Termini
Stations12 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length12.5km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 19 of the Shenzhen Metro is a line under planning, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction is planned to begin in 2023. The first phase of Line 19 has entered Phase V planning, and will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2] The line is proposed to use 6 car type B trains.[3]

Stations (Phase 1)

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Nantangwei 南塘围 Pingshan
People's Hospital 人民医院
Tang-keng 汤坑
Jinlong 锦龙 14
Xinwei 新围
Baoshan 宝山
Xinhe 新和 16
Cultural Center 文化中心
Pingshan Center 坪山中心 14
Lanzhu Road 兰竹路
Lijing 荔景
Julong 聚龙

References

  1. ^ 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. ^ 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  3. ^ 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.