Jump to content

Grand Central (train operating company): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
D47817 (talk | contribs)
History
m refs. We don't include "publisher" in citations of mainstream newspapers and magazines
Line 51: Line 51:
'''Grand Central Railway Company Limited''' (legal name Grand Central Railway Company Limited<ref>http://data.companieshouse.gov.uk/doc/company/03979826 Companies House extract: Grand Central Railway Company Limited</ref>is an [[Open access operator|Open Access Operator]] in the United Kingdom operating passenger rail services on the [[East Coast Main Line]] from [[Sunderland railway station|Sunderland]] and [[Bradford Interchange railway station|Bradford]] to [[London King's Cross railway station|London King's Cross]].
'''Grand Central Railway Company Limited''' (legal name Grand Central Railway Company Limited<ref>http://data.companieshouse.gov.uk/doc/company/03979826 Companies House extract: Grand Central Railway Company Limited</ref>is an [[Open access operator|Open Access Operator]] in the United Kingdom operating passenger rail services on the [[East Coast Main Line]] from [[Sunderland railway station|Sunderland]] and [[Bradford Interchange railway station|Bradford]] to [[London King's Cross railway station|London King's Cross]].


Operations commenced on 18 December 2007 between [[Sunderland railway station|Sunderland]] and [[London King's Cross railway station|London King's Cross]] calling at [[Hartlepool railway station|Hartlepool]], [[Eaglescliffe railway station|Eaglescliffe]], [[Northallerton railway station|Northallerton]], [[Thirsk railway station|Thirsk]] and [[York railway station|York]]. While awaiting the delivery of all of the rolling stock, initially only one Sunderland - Kings Cross and one York - Kings Cross service operated in each direction.<ref>{{cite web |url= http://www.grandcentralrail.co.uk/news.html?id=news056 |title=Passenger services begin Tuesday 18 December |date= 18 December 2007 |publisher=Grand Central}}</ref> The full timetable was introduced in March 2008.<ref>{{cite web |url=http://www.grandcentralrail.co.uk/news.html?id=news059 |title=Full Grand Central service to begin on Saturday|date=29 February 2008 |publisher=Grand Central}}</ref><ref>Rail Magazine Issue 585 13 February 2008 Page 41</ref> A fourth daily service was added on 17 August 2009.<ref>{{cite news |url= http://www.sunderlandecho.com/news/Grand-Central-starts-fourth-train.5557895.jp| title=Grand Central starts fourth train to King's Cross |newspaper=Sunderland Echo |publisher=Johnston Publishing Ltd |date=17 August 2009 |first=Kevin |last=Clark |accessdate=9 June 2010}}</ref>
Operations commenced on 18 December 2007 between [[Sunderland railway station|Sunderland]] and [[London King's Cross railway station|London King's Cross]] calling at [[Hartlepool railway station|Hartlepool]], [[Eaglescliffe railway station|Eaglescliffe]], [[Northallerton railway station|Northallerton]], [[Thirsk railway station|Thirsk]] and [[York railway station|York]]. While awaiting the delivery of all of the rolling stock, initially only one Sunderland - Kings Cross and one York - Kings Cross service operated in each direction.<ref>{{cite web |url= http://www.grandcentralrail.co.uk/news.html?id=news056 |title=Passenger services begin Tuesday 18 December |date= 18 December 2007 |publisher=Grand Central}}</ref> The full timetable was introduced in March 2008.<ref>{{cite web |url=http://www.grandcentralrail.co.uk/news.html?id=news059 |title=Full Grand Central service to begin on Saturday|date=29 February 2008 |publisher=Grand Central}}</ref><ref>Rail Magazine Issue 585 13 February 2008 Page 41</ref> A fourth daily service was added on 17 August 2009.<ref>{{cite news |url= http://www.sunderlandecho.com/news/Grand-Central-starts-fourth-train.5557895.jp| title=Grand Central starts fourth train to King's Cross |newspaper=Sunderland Echo |date=17 August 2009 |first=Kevin |last=Clark |accessdate=9 June 2010}}</ref>


On 23 May 2010 Grand Central started services between {{Stnlnk|Bradford Interchange}} and London King's Cross, calling at various Yorkshire stations including {{Stnlnk|Halifax}} and {{Stnlnk|Doncaster}}.<ref>
On 23 May 2010 Grand Central started services between {{Stnlnk|Bradford Interchange}} and London King's Cross, calling at various Yorkshire stations including {{Stnlnk|Halifax}} and {{Stnlnk|Doncaster}}.<ref>
Line 61: Line 61:
{{cite web |url= http://www.examiner.co.uk/news/local-west-yorkshire-news/2010/05/20/an-historic-journey-to-london-with-grand-central-west-riding-service-86081-26481173/ |accessdate=20 November 2011 |title=An historic journey to London with Grand Central West Riding Service |work= [[Huddersfield Daily Examiner]] |date=20 May 2010}}</ref> These services have been dubbed the 'West Riding Service'.
{{cite web |url= http://www.examiner.co.uk/news/local-west-yorkshire-news/2010/05/20/an-historic-journey-to-london-with-grand-central-west-riding-service-86081-26481173/ |accessdate=20 November 2011 |title=An historic journey to London with Grand Central West Riding Service |work= [[Huddersfield Daily Examiner]] |date=20 May 2010}}</ref> These services have been dubbed the 'West Riding Service'.


In November 2011 Grand Central was purchased by [[Arriva UK Trains|Arriva]].<ref>{{cite web |url= http://www.railwaygazette.com/news/single-view/view/10/ec-approves-dbs-takeover-of-arriva/browse/2.html |date=11 August 2010 |accessdate=19 August 2010 |title= EC approves DB's takeover of Arriva |work=Railway Gazette International |location =London}}</ref><ref>{{cite web |url= http://www.railwaymagazine.co.uk/news/arriva-acquires-open-access-operator-grand-central-railway |title=Arriva acquires open access operator Grand Central Railway |date=5 November 2011 |accessdate=12 February 2012 |first=Chris |last=Milner |work=[[The Railway Magazine]] |location =Horncastle}}</ref><ref>{{cite news |url= http://www.railnews.co.uk/news/general/2011/11/04-germans-buy-openaccess-operator-grand.html |title= Germans buy open-access operator Grand Central |date=4 November 2011 |accessdate=12 February 2012 |work=[[Railnews]] |publisher=Railnews Limited |location=Stevenage}}</ref><ref>{{cite news |url= http://www.examiner.co.uk/news/local-west-yorkshire-news/2011/11/05/arriva-buys-grand-central-railway-86081-29722640/ |title=Arriva buys Grand Central Railway |first=Henryk |last=Zientek |work= Huddersfield Daily Examiner |publisher=Trinity Mirror North West & North Wales Limited |date=5 November 2011 |accessdate=12 February 2012}}</ref><ref>{{cite web |url= http://www.publicsectortravel.org.uk/2011/11/08/arriva-buys-open-access-firm-grand-central/ |title= Arriva buys open access firm Grand Central |first=Mark |last=Smulian |date=8 November 2011 |accessdate=12 February 2012 |work=Public Sector Travel |location =London}}</ref><ref>{{cite news |url= http://www.yorkpress.co.uk/news/business/news/9344895.York_train_operator_Grand_Central_bought_by_Arriva/ |title= York train operator Grand Central bought by Arriva |work=[[The Press (York)|The Press]] |location=York |publisher=Newsquest Media Group |date=5 November 2011 |first=Mike |last=Laycock}}</ref><ref>{{cite news |url= http://www.sunderlandecho.com/news/business/latest-news/sunderland_based_arriva_buys_grand_central_rail_1_3943980 |title=Sunderland-based Arriva buys Grand Central rail |work=[[Sunderland Echo]] |publisher=Johnston Publishing Ltd |date=6 November 2011 |accessdate=12 February 2012}}</ref><ref>{{cite news |url= http://www.railjournal.com/newsflash/db-arriva-acquires-grand-central-1379.html |title=DB Arriva acquires Grand Central |date=4 November 2011 |accessdate=12 February 2012 |work=[[International Railway Journal]]|location=London |publisher=Simmons-Boardman Publishing}}</ref> At the time of the takeover Grand Central had 123 employees, a turnover of £18.9m and debts of £44m.<ref>{{cite news |url= http://www.journallive.co.uk/north-east-news/todays-news/2011/11/05/transport-giant-arriva-takeover-grand-central-61634-29725010/ |title=Transport giant Arriva takeover (sic) Grand Central |work=[[The Journal (newspaper)|The Journal]] |location= Newcastle upon Tyne |publisher=ncjMedia Limited |first=Iain |last=Laing |date=5 November 2011 |accessdate=12 February 2012}}</ref>
In November 2011 Grand Central was purchased by [[Arriva UK Trains|Arriva]].<ref>{{cite web |url= http://www.railwaygazette.com/news/single-view/view/10/ec-approves-dbs-takeover-of-arriva/browse/2.html |date=11 August 2010 |accessdate=19 August 2010 |title= EC approves DB's takeover of Arriva |work=Railway Gazette International |location =London}}</ref><ref>{{cite web |url= http://www.railwaymagazine.co.uk/news/arriva-acquires-open-access-operator-grand-central-railway |title=Arriva acquires open access operator Grand Central Railway |date=5 November 2011 |accessdate=12 February 2012 |first=Chris |last=Milner |work=[[The Railway Magazine]] |location =Horncastle}}</ref><ref>{{cite news |url= http://www.railnews.co.uk/news/general/2011/11/04-germans-buy-openaccess-operator-grand.html |title= Germans buy open-access operator Grand Central |date=4 November 2011 |accessdate=12 February 2012 |work=[[Railnews]] |location=Stevenage}}</ref><ref>{{cite news |url= http://www.examiner.co.uk/news/local-west-yorkshire-news/2011/11/05/arriva-buys-grand-central-railway-86081-29722640/ |title=Arriva buys Grand Central Railway |first=Henryk |last=Zientek |work= Huddersfield Daily Examiner |date=5 November 2011 |accessdate=12 February 2012}}</ref><ref>{{cite web |url= http://www.publicsectortravel.org.uk/2011/11/08/arriva-buys-open-access-firm-grand-central/ |title= Arriva buys open access firm Grand Central |first=Mark |last=Smulian |date=8 November 2011 |accessdate=12 February 2012 |work=Public Sector Travel |location =London}}</ref><ref>{{cite news |url= http://www.yorkpress.co.uk/news/business/news/9344895.York_train_operator_Grand_Central_bought_by_Arriva/ |title= York train operator Grand Central bought by Arriva |work=[[The Press (York)|The Press]] |location=York |date=5 November 2011 |first=Mike |last=Laycock}}</ref><ref>{{cite news |url= http://www.sunderlandecho.com/news/business/latest-news/sunderland_based_arriva_buys_grand_central_rail_1_3943980 |title=Sunderland-based Arriva buys Grand Central rail |work=[[Sunderland Echo]] |date=6 November 2011 |accessdate=12 February 2012}}</ref><ref>{{cite news |url= http://www.railjournal.com/newsflash/db-arriva-acquires-grand-central-1379.html |title=DB Arriva acquires Grand Central |date=4 November 2011 |accessdate=12 February 2012 |work=[[International Railway Journal]]|location=London }}</ref> At the time of the takeover Grand Central had 123 employees, a turnover of £18.9m and debts of £44m.<ref>{{cite news |url= http://www.journallive.co.uk/north-east-news/todays-news/2011/11/05/transport-giant-arriva-takeover-grand-central-61634-29725010/ |title=Transport giant Arriva takeover (sic) Grand Central |work=[[The Journal (newspaper)|The Journal]] |location= Newcastle upon Tyne |first=Iain |last=Laing |date=5 November 2011 |accessdate=12 February 2012}}</ref>


==Background==
==Background==
Line 106: Line 106:
As a result of capacity uncertainties, Grand Central was not given regulatory approval to run the originally proposed service to [[Bradford]]. It had proposed splitting and joining the Sunderland and Bradford trains at {{Stnlnk|Doncaster}}, with a single service to and from London, but the plan was rejected following concerns expressed by Network Rail.
As a result of capacity uncertainties, Grand Central was not given regulatory approval to run the originally proposed service to [[Bradford]]. It had proposed splitting and joining the Sunderland and Bradford trains at {{Stnlnk|Doncaster}}, with a single service to and from London, but the plan was rejected following concerns expressed by Network Rail.


Grand Central has promised to give an immediate 50% refund to any passenger unable to find a seat at any time during the journey.<ref>{{cite web|title=Passenger Charter (pg 7)|url=http://www.grandcentralrail.co.uk/Passenger-Charter.pdf|publisher=Grand Central|accessdate=20 November 2011}}</ref>
Grand Central has promised to give an immediate 50% refund to any passenger unable to find a seat at any time during the journey.<ref>{{cite web|title=Passenger Charter (7)|url=http://www.grandcentralrail.co.uk/Passenger-Charter.pdf|publisher=Grand Central|accessdate=20 November 2011}}</ref>


GNER vigorously opposed the prospect of on-rail competition on the ECML from Grand Central. The regulatory hearing at the ORR saw strong objections by GNER to Grand Central's services, but these were rejected. GNER then challenged the legality of the ORR's decisions by seeking a judicial review in the High Court. On 27 July 2006, GNER's case failed and the court ruled that the decision to allow Grand Central access to the national railway network - paying access charges which are structurally different from (and lower than) those payable by franchised passenger train operators - was legal.<ref>{{cite news |url=http://www.guardian.co.uk/transport/Story/0,,1832208,00.html |title=GNER fails to block rival's east coast line service |newspaper=The Guardian | location = London |date=28 July 2006 | first=Katie | last=Allen }}</ref>
GNER vigorously opposed the prospect of on-rail competition on the ECML from Grand Central. The regulatory hearing at the ORR saw strong objections by GNER to Grand Central's services, but these were rejected. GNER then challenged the legality of the ORR's decisions by seeking a judicial review in the High Court. On 27 July 2006, GNER's case failed and the court ruled that the decision to allow Grand Central access to the national railway network - paying access charges which are structurally different from (and lower than) those payable by franchised passenger train operators - was legal.<ref>{{cite news |url=http://www.guardian.co.uk/transport/Story/0,,1832208,00.html |title=GNER fails to block rival's east coast line service |newspaper=The Guardian | location = London |date=28 July 2006 | first=Katie | last=Allen }}</ref>
Line 220: Line 220:


===Grand Union===
===Grand Union===
''Grand Union'' developed a case for running services over an additional route, {{Stnlnk|London Euston}} to Bradford Interchange via {{Stnlnk|Huddersfield}} and the [[West Coast Main Line]] (WCML). This proposal was dropped due to difficulties involving [[Virgin Trains]]' ''moderation of competition'' protection.<ref>{{cite web|title=Virgin’s competition protection deserves to be challenged for the good of the railway|url=http://www.transportxtra.com/magazines/transit/news/?ID=12585|publisher=TransportXtra|accessdate=20 November 2011}}</ref>
''Grand Union'' developed a case for running services over an additional route, {{Stnlnk|London Euston}} to Bradford Interchange via {{Stnlnk|Huddersfield}} and the [[West Coast Main Line]] (WCML). This proposal was dropped due to difficulties involving [[Virgin Trains]]' ''moderation of competition'' protection.<ref>{{cite |title= competition protection deserves to be challenged for the good of the railway|url=http://www.transportxtra.com/magazines/transit/news/?ID=12585|=TransportXtra|accessdate=20 November 2011}}</ref>


===London-Lincoln===
===London-Lincoln===
Line 226: Line 226:


===Other proposed routes===
===Other proposed routes===
Grand Central was originally linked with a proposal to run shortened HSTs between Newcastle and [[Preston railway station|Preston]], via the [[Durham]] Coast, York, [[Wakefield]], [[Brighouse]], [[Rochdale]] and Manchester. It later suggested a York to [[Chester]] service to be run by DMUs (probably [[British Rail Class 158|Class 158s]] displaced from [[TransPennine Express]]). According to its on-board magazine, it is currently developing proposals for a Scarborough to London service.<ref name="magazine">{{cite web|title=GC Magazine Issue 1|url=http://www.grandcentralrail.co.uk/GCM_Issue1.pdf|publisher=Grand Central|accessdate=20 November 2011}}</ref>
Grand Central was originally linked with a proposal to run shortened HSTs between Newcastle and [[Preston railway station|Preston]], via the [[Durham]] Coast, York, [[Wakefield]], [[Brighouse]], [[Rochdale]] and Manchester. It later suggested a York to [[Chester]] service to be run by DMUs (probably [[British Rail Class 158|Class 158s]] displaced from [[TransPennine Express]]). According to its on-board magazine, it is currently developing proposals for a Scarborough to London service.<ref name="magazine">{{cite web|title=GC Magazine Issue 1|url=http://www.grandcentralrail.co.uk/GCM_Issue1.pdf|publisher=Grand Central|accessdate=20 November 2011}}</ref>


==Named trains==
==Named trains==

Revision as of 09:26, 8 October 2012

Grand Central Railway
Grand Central Class 180 Zephyrs
Franchise(s)Open access operator
Not subject to franchising;
18 December 2007 – December 2016
Main route(s)Sunderland - London King's Cross
Bradford Interchange - London King's Cross
Other route(s)None
Fleet size3 High Speed Trains
5 Class 180 Zephyrs
Stations called at13
Stations operated0
Parent companyArriva UK Trains
Other
Websitewww.grandcentralrail.co.uk
Route map
Route map
Template:UKrail-header2Template:BS-table1Template:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BS

|}

Template:Rail-header2Template:BS-tableTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BS

|}

Grand Central Railway Company Limited (legal name Grand Central Railway Company Limited[1]is an Open Access Operator in the United Kingdom operating passenger rail services on the East Coast Main Line from Sunderland and Bradford to London King's Cross.

Operations commenced on 18 December 2007 between Sunderland and London King's Cross calling at Hartlepool, Eaglescliffe, Northallerton, Thirsk and York. While awaiting the delivery of all of the rolling stock, initially only one Sunderland - Kings Cross and one York - Kings Cross service operated in each direction.[2] The full timetable was introduced in March 2008.[3][4] A fourth daily service was added on 17 August 2009.[5]

On 23 May 2010 Grand Central started services between Bradford Interchange and London King's Cross, calling at various Yorkshire stations including Halifax and Doncaster.[6][7] These services have been dubbed the 'West Riding Service'.

In November 2011 Grand Central was purchased by Arriva.[8][9][10][11][12][13][14][15] At the time of the takeover Grand Central had 123 employees, a turnover of £18.9m and debts of £44m.[16]

Background

Grand Central operates four return trips per day between Sunderland and London, along the ECML and the Durham Coast Line, and three return trips between Bradford and London using the ECML, parts of the Caldervale Line, and a previously goods-only line. Initially one return trip from Sunderland, and two from York were offered until all rolling stock became available to allow a full service to start.

Following the model of First Hull Trains, the services are run on a fully commercial, non-subsidised basis using the "open access" process to gain access to the rail network. The majority of other services in the UK are instead operated through Department for Transport (DfT)-run franchises, including most of the principal National Rail train service operators.

The Sunderland service covers a distance of 266 miles, more than two thirds of it non-stop between York station and London King's Cross. The service is operated using rebuilt HST and refurbished Class 180 rolling stock capable of 125mph; procuring and renovating sufficient compatible rolling stock had been blamed by the company for delaying the original launch.

On 23 May 2010, Grand Central started running three return trips per day between West Yorkshire and London, along the ECML and the Caldervale Line. Trains are formed of the Class 180 units also acquired for the fourth return service to Sunderland.

History

Grand Central was founded by former British Rail manager Ian Yeowart in April 2000.[17] A majority shareholding was sold at some stage to coach operator Fraser Eagle Group. On 13 March 2007 Grand Central was sold to two former managers of Prism Rail, backed by a private equity group.[18] On 4 November 2011 Grand Central was sold to Arriva.[19][20]

London Kings Cross on 18 December 2007 - the first day of Grand Central services

Grand Central originally applied to operate from Newcastle via the Caldervale Line to Manchester Victoria using High Speed Trains. The application was rejected by the Office of Rail Regulation in June 2004.[21][22][23]

In February 2005 Grand Central lodged an application with the Office of Rail Regulation to operate four daily services from Sunderland to London King's Cross and four daily services from Bradford Interchange to London King's Cross using Class 67 locomotives hauling five Mark 3 carriages and a Class 82 Driving Van Trailer.[24] On 23 March 2006 the Office of Rail Regulation granted Grand Central access rights for three daily Sunderland to London King's Cross services, but only with 125 mph capable rolling stock.[25] GNER sought a judicial review of the decision to grant Grand Central access rights but was rejected by the High Court on 27 July 2006.[26]

In March 2008 Grand Central lodged an application with the Office of Rail Regulation to operate three daily services from Bradford Interchange to London King's Cross.[27] On 29 January 2009 the Office of Rail Regulation granted Grand Central access rights for three daily Bradford Interchange to London King's Cross services until December 2014 and a fourth Sunderland to London King's Cross service until May 2012.[28] All access right have now been extended until December 2016.[29]

Problems in obtaining suitable rolling stock led to the start date being put back to May 2007.[30] However, further delays in refurbishing rolling stock for the service delayed the start again, with the service planned to begin in September 2007,[31] then November.[32]

By this date, Grand Central had managed to get a shortened HST running on trials between Sunderland, York and London for crew training purposes, and had sufficient stock to form one of its complete trains, but entry into passenger service required more stock becoming available and being cleared to carry passengers by the DfT, the ORR, HM Railway Inspectorate and Network Rail. As a consequence, the start date further slipped to December 2007, a full year after the originally planned start.[33] Grand Central's initial services were restricted by the amount of rolling stock it had available, which numbered only one complete train. The company was able to operate one train to and from Sunderland each day, with an additional service to and from York.

Grand Central Mark 3 TS No. 42401 at London Kings Cross
The refurbished Standard Class interior of a Grand Central Mark 3 TS vehicle

In February 2008, the remaining power cars and coaches were delivered, and an announcement was made that the full service would begin in March.[34] Due to further "major component failures" on the trains, by May 2008 several services were being cancelled, and the timetable was cut to a temporarily reduced service once again.[35]

Full services were eventually resumed in the middle of July.[36]

Grand Central's agreement allowed for a fourth daily service, which could not be provided from within the existing fleet. As a consequence, Grand Central procured a pair of Class 180 Adelantes.[37] Permission to run the Class 180s was granted by Network Rail in June 2008.[38] The ORR gave Grand Central clearance to run the extra service awarded in January 2009,[39] and the service was expected to start in May.[40] Successful test runs for the service were held in April 2010.[41]

Grand Central is not yet a profitable operation, and in August 2009 it posted an £8 million loss.[42] This was blamed on the "significant start-up costs incurred when introducing a brand-new service". The company is aiming for the Sunderland-London service to be profitable by 2010.[42]

Competition with other services

Grand Central Mark 3 TF No. 41205 (converted from a former West Coast Mark 3A FO vehicle) at London Kings Cross
The refurbished First Class interior of a Grand Central Mark III TF vehicle

The ECML is one of the busiest lines on the UK rail network, and there is currently insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators. The principal long-distance passenger train operator on the line is the nationalised East Coast, which took over from National Express East Coast (NXEC) in November 2009 due to poor performance. NXEC had begun a franchise on 9 December 2007 with the DfT which was due to run until March 2015, taking over from the GNER which had surrendered the contract early due to the financial difficulties of its parent company.

As a result of capacity uncertainties, Grand Central was not given regulatory approval to run the originally proposed service to Bradford. It had proposed splitting and joining the Sunderland and Bradford trains at Doncaster, with a single service to and from London, but the plan was rejected following concerns expressed by Network Rail.

Grand Central has promised to give an immediate 50% refund to any passenger unable to find a seat at any time during the journey.[43]

GNER vigorously opposed the prospect of on-rail competition on the ECML from Grand Central. The regulatory hearing at the ORR saw strong objections by GNER to Grand Central's services, but these were rejected. GNER then challenged the legality of the ORR's decisions by seeking a judicial review in the High Court. On 27 July 2006, GNER's case failed and the court ruled that the decision to allow Grand Central access to the national railway network - paying access charges which are structurally different from (and lower than) those payable by franchised passenger train operators - was legal.[44]

The Grand Central service links parts of the North East that had not had a direct service to London for many years.

London King's Cross–Bradford Interchange

In March 2008, Grand Union submitted a track access application for paths on the East Coast Main Line (ECML) for services between Bradford and London. These follow a route from Bradford to Doncaster calling at Halifax, Brighouse, Wakefield Kirkgate and Pontefract Monkhill, via (but not stopping at) Askern, hitherto a freight-only route, before joining the ECML to London King's Cross. The company states that these are the first direct trains between Halifax and London for 32 years.

The plan was for up to six services in each direction per day, using 125-mile-per-hour-capable (200 km/h) rolling stock, either further HSTs or Class 180 Adelante trains.[45] The Office of Rail Regulation approved the proposal in February 2009, but limited paths to three trains daily each way.[46]

It was hoped that the service would start in December 2009, but difficulties in securing rolling stock caused delay.[47] The service, dubbed "West Riding", started on 23 May 2010.[48] It is operated under the existing brand name of Grand Central Railway, the name Grand Northern Trains being the name of the development company which applied for the services.

Grand Central revealed that almost 1,500 passengers used the West Riding service in its first week, marginally better than expected.[49] However, it also temporarily cut the cost of tickets by 25% until 19 June 2010.[49]

An additional stop at Mirfield, between Brighouse and Wakefield, started on 11 December 2011, after thorough examination by the ORR, with, on a weekday, all southbound services and all northbound services, except the 10.48 from London, calling at the station. This station has much better connections with Huddersfield than Brighouse.[citation needed]

Performance

Unlike fellow open-access operator First Hull Trains, Grand Central did not previously release performance statistics and, because it is not a rail franchise holder, it was not obliged to do so. However, the latest performance statistics published by the ORR (Office for Rail Regulation) do include Grand Central. The Public Performance Measure (PPM) for the second quarter of 2010-2011 was 84.6%.[50]

In its National Passenger Survey for Autumn 2009, Passenger Focus reported an overall passenger satisfaction rating of 95% for Grand Central - the second highest score in the survey.[51] The highest score was for another open-access operator, Wrexham & Shropshire.

Rolling stock

Rolling stock procurement

Class 43 Power Car No. 43067 at London Kings Cross.

The difficulty with procuring rolling stock was a major factor in the delays Grand Central suffered in launching its open-access services. Grand Central originally planned to use a fleet of five of Bombardier Transportation's five-coach Class 222 Diesel-electric Multiple Unit (DEMU) 125-mile-per-hour (200 km/h) trains, similar to those already in use with Hull Trains and Midland Mainline, and related to the Class 220/221. However, there were difficulties in securing these units, leading Grand Central to make alternative plans.

On 5 October 2006, Grand Central said it had secured the use of six Class 43 power cars, and 24 Mark 3 trailer vehicles. The former loco-hauled Mark 3a coaches required complete rewiring in order to work with the power cars as they have different electrical requirements.[52] This caused the company's start date to be pushed back to 20 May 2007[53] and then again to September 2007, and again at a later update.

Current fleet

Grand Central's fleet currently totals eight trains. Three are HST sets formed of Class 43 (HST) power cars and Mark 3 coaches, and the other five are Class 180 sets.

HST sets

The power cars, numbered 43465/467/468/480/484/423[54] all have buffers, since they were previously modified for use with Class 91 locomotives during the electrification of the East Coast Main Line. The coaches consist of six HST trailer vehicles (3 TRSB and 3 TGS) and 18 ex-locomotive-hauled Mk3a coaches originally built for the West Coast Main Line. The power cars were originally fitted with Valenta engines, but these have been replaced with new MTU engines similar to those fitted to East Coast, CrossCountry and First Great Western HSTs. Power car 43423 (formally 43123) has retained its "Valenta" name plates.[55]

Class 180

The Class 180 diesel multiple units, originally in service with First Great Western, were obtained when Grand Central was granted permission for a fourth daily service to and from Sunderland.[56] The first unit, 180112, was named James Herriot at a naming ceremony in July 2009, prior to its entry into service.[57] The remaining two units, 180105 and 180114, are due to enter service later in 2009.[58] Grand Central has secured two extra Class 180 units, 180101 and 180107, bringing the total number of units to five.[59] It has also been announced that the name Adelante will no longer be used to refer to the Class 180s, as it was with First Great Western. The Class 180 fleet is pooled between the additional Sunderland service and the services to and from Bradford.

 Class  Image  Type   Top speed   Number   Routes operated   Built 
 mph   km/h 
Class 43 High Speed Train Diesel power car 125 200 6 London King's Cross - Sunderland 1976–1982
Mark 3 Coach Passenger Coach 125 200 24 London King's Cross - Sunderland 1975–1988
Class 180 diesel multiple unit 125 200 5 London King's Cross - Sunderland
London King's Cross - Bradford Interchange
2001

Future fleet

In April 2007, Grand Central announced plans to lease brand-new rolling stock from 2010 to replace the HSTs, on the provision that its track-access contract is extended beyond the initial five years. In conjunction with Sovereign Trains, a newly formed rolling stock lessor, Grand Central plans to obtain new Polaris DEMU trains from China. These new express trains could be capable of up to 140 miles per hour (225 km/h), which would allow them to take advantage of any future speed-limit increases on the ECML.[60]

Directly Operated Railways, the company set up by the Department for Transport to operate the East Coast franchise, has stated its unhappiness with the Class 180 units obtained by National Express East Coast for the planned additional services specified in the franchise agreement, and has indicated that it wishes to return to the original proposal of using locomotive-hauled trains instead. The original plan was for 110-mile-per-hour (177 km/h) trains pulled by Class 90 locomotives. However, DOR has raised the possibility of obtaining Grand Central's three 125-mile-per-hour-capable (200 km/h) HSTs for these services, in exchange for the Class 180s currently under lease to NXEC/East Coast, giving Grand Central a single, uniform fleet.[61]

Grand Central have proposed running services between London and Blackpool starting in 2012. With the planned electrification not due to reach Blackpool until 2014, Grand Central have stated that their intention is to start their service by using Class 67 diesel locomotives and Mark 3 coaching stock, before obtaining Polaris trains that are tilt capable.[62]

Past fleet

In August 2007, Grand Central hired a pair of Class 47 locomotives and a rake of five Mark 3 coaches from Direct Rail Services, to enable its staff to learn the route prior to the introduction of its HST fleet.[63]

In its first few months of operation, Grand Central experienced significant difficulties with its rolling stock, particularly the Class 43 power cars, which were prone to equipment failure. As a consequence, Grand Central were forced to hire replacement rolling stock on several occasions - either replacement Class 43 power cars, or other locomotives and passenger coaches from EWS and various spot-hire companies, including a pair of EWS Class 37s, a pair of Riviera Trains Class 47s and a pair of Virgin Trains Class 57s to operate Sunderland - York shuttle services.[64]

Routes

London King's Cross–Sunderland

Grand Central operates services from London King's Cross to Sunderland. The service passes through the stations at Seaham, Billingham, Stockton-on-Tees and Yarm but does not call there.

London King's Cross–Bradford Interchange

Grand Central also operate services from London King's Cross to Bradford Interchange. This service goes along the ECML, and diverges at Doncaster, from where the train uses the a former freight-only route to Pontefract and then via Wakefield and Brighouse on to the Caldervale Line to Halifax and Bradford.

Proposed future services

In addition to its services to Sunderland and Bradford, Grand Central has also expressed interest in a number of other routes. It had planned to double the number of Sunderland - London return services from December 2008. This aspiration was part of a wider track access application also involving Grand Union.

London-Blackpool North

In November 2010, Grand Central applied to the Office of Rail Regulation for a new service, running up to four times a day in each direction, between Blackpool North and London Euston. These services would call at Poulton-le-Fylde, Kirkham & Wesham, Preston, Hartford, Tamworth and Nuneaton. There would also be one extra service a day between Hartford and Euston calling additionally at Lichfield Trent Valley. Grand Central seeks to run these services from May 2012, using Class 67 locomotives and Mark 3 coaches running at up to 110 miles per hour (177 km/h), until such time as the Preston-Blackpool line is electrified.[65][66]

London-Sunderland

Grand Central applied for a new track access agreement in March 2008 requesting three further London-Sunderland services in each direction per day, taking its total to six trains per day.[67]

Grand Union

Grand Union developed a case for running services over an additional route, London Euston to Bradford Interchange via Huddersfield and the West Coast Main Line (WCML). This proposal was dropped due to difficulties involving Virgin Trains' moderation of competition protection.[68]

London-Lincoln

Grand Central Railway has proposed a direct service from London to Lincoln, following the withdrawal of East Coast's proposed expansion of its current service between Lincoln and the capital.[69]

Other proposed routes

Grand Central was originally linked with a proposal to run shortened HSTs between Newcastle and Preston, via the Durham Coast, York, Wakefield, Brighouse, Rochdale and Manchester. It later suggested a York to Chester service to be run by DMUs (probably Class 158s displaced from TransPennine Express). According to its on-board magazine, it is currently developing proposals for a Scarborough to London service.[70]

Named trains

Grand Central has given names to two trains on its Sunderland route. Contrary to tradition in British named trains, these are not pairs of trains but individual one-way trips. In the 2008 timetable, the name The Zephyr is given to the early morning (06:41) departure from Sunderland, while the teatime (15:50) train from London is called The 21st Century Limited.

See also

References

  1. ^ http://data.companieshouse.gov.uk/doc/company/03979826 Companies House extract: Grand Central Railway Company Limited
  2. ^ "Passenger services begin Tuesday 18 December". Grand Central. 18 December 2007.
  3. ^ "Full Grand Central service to begin on Saturday". Grand Central. 29 February 2008.
  4. ^ Rail Magazine Issue 585 13 February 2008 Page 41
  5. ^ Clark, Kevin (17 August 2009). "Grand Central starts fourth train to King's Cross". Sunderland Echo. Retrieved 9 June 2010.
  6. ^ "West Riding Timetable May 2010" (PDF). Grand Central. Retrieved 20 November 2011.
  7. ^ "An historic journey to London with Grand Central West Riding Service". Huddersfield Daily Examiner. 20 May 2010. Retrieved 20 November 2011.
  8. ^ "EC approves DB's takeover of Arriva". Railway Gazette International. London. 11 August 2010. Retrieved 19 August 2010.
  9. ^ Milner, Chris (5 November 2011). "Arriva acquires open access operator Grand Central Railway". The Railway Magazine. Horncastle. Retrieved 12 February 2012.
  10. ^ "Germans buy open-access operator Grand Central". Railnews. Stevenage. 4 November 2011. Retrieved 12 February 2012.
  11. ^ Zientek, Henryk (5 November 2011). "Arriva buys Grand Central Railway". Huddersfield Daily Examiner. Retrieved 12 February 2012.
  12. ^ Smulian, Mark (8 November 2011). "Arriva buys open access firm Grand Central". Public Sector Travel. London. Retrieved 12 February 2012.
  13. ^ Laycock, Mike (5 November 2011). "York train operator Grand Central bought by Arriva". The Press. York.
  14. ^ "Sunderland-based Arriva buys Grand Central rail". Sunderland Echo. 6 November 2011. Retrieved 12 February 2012.
  15. ^ "DB Arriva acquires Grand Central". International Railway Journal. London. 4 November 2011. Retrieved 12 February 2012.
  16. ^ Laing, Iain (5 November 2011). "Transport giant Arriva takeover (sic) Grand Central". The Journal. Newcastle upon Tyne. Retrieved 12 February 2012.
  17. ^ http://www.alliancerail.co.uk/about/
  18. ^ Harrison, Michael (14 March 2007). "Former Prism bosses buy Grand Central in £10 million deal". The Independent. London. Retrieved 9 June 2010.
  19. ^ http://www.bbc.co.uk/news/uk-england-15592125
  20. ^ http://www.grandcentralrail.com/arriva
  21. ^ http://www.rail-reg.gov.uk/upload/pdf/202.pdf
  22. ^ "Plans for new rail link hit the buffers". Huddersfield Daily Examiner. 23 June 2004. Retrieved 20 November 2011.
  23. ^ Rail Magazine issue 491 7 July 2004 Page 10
  24. ^ http://www.rail-reg.gov.uk/upload/pdf/s17-gcen1_appfrm.pdf
  25. ^ http://www.rail-reg.gov.uk/upload/pdf/ecml_dec_230306.pdf
  26. ^ http://www.alycidon.com/ALYCIDON%20RAIL/Proffessional%20stuff%20archive/GNER%20news%20release%2027%2007%2006.htm
  27. ^ www.rail-reg.gov.uk/upload/pdf/s18-ecml-GCU_280308.pdf
  28. ^ http://www.rail-reg.gov.uk/server/show/ConWebDoc.9430
  29. ^ http://www.rail-reg.gov.uk/server/show/ConWebDoc.9949
  30. ^ Smith, Ross (7 October 2006). "London rail service winner has no trains". The Journal. Newcastle upon Tyne. Retrieved 9 June 2010.
  31. ^ "Second delay for new rail service". BBC News Online. 26 April 2007. Retrieved 27 April 2007.
  32. ^ "A message from Grand Central's new Managing Director Tom Clift" (Press release). Grand Central. 16 October 2007. Retrieved 25 October 2007.
  33. ^ "Latest news on Grand Central launch" (Press release). Grand Central. 19 November 2007. Retrieved 21 November 2007.
  34. ^ "Grand Central set for March launch". The Railway Centre. 22 February 2008. Retrieved 25 February 2008.
  35. ^ "Train firm forced to cut services". BBC News Online. 20 May 2008.
  36. ^ "New delay for troubled rail firm". BBC News Online. 7 July 2008.
  37. ^ Current Vehicle Change Proposals; Grand Central Class 180, Network Rail.
  38. ^ Acceptance of proposed Vehicle Change Grand Central Class 180, Network Rail, 11 June 2008.
  39. ^ "Track Access Rights Applications - Proposed Decision" (PDF). Office of Rail Regulation. 28 January 2009. Retrieved 29 January 2009.
  40. ^ "From Tom Clift, Managing Director" (Press release). Grand Central. 29 December 2008.
  41. ^ Killner, Will (21 April 2010). "Plans for trains to London from Bradford are on track". Telegraph & Argus. Bradford. Retrieved 22 April 2010.
  42. ^ a b "Rail firm optimistic despite loss". BBC News Online. 24 August 2009. Retrieved 24 August 2009.
  43. ^ "Passenger Charter (p.7)" (PDF). Grand Central. Retrieved 20 November 2011.
  44. ^ Allen, Katie (28 July 2006). "GNER fails to block rival's east coast line service". The Guardian. London.
  45. ^ "Track Access Rights on the East Coast Main Line" (PDF). Office of Rail Regulation. 28 March 2008. Retrieved 9 June 2008.
  46. ^ ORR Track Access Rights Application Decision for ECML - 28 January 2009 ORR Website; Retrieved 29 January 2009.
  47. ^ Drury, Colin (19 August 2009). "London rail link blow: Service will be delayed until May". Halifax Evening Courier. Retrieved 21 August 2009.
  48. ^ "Grand Central launches West Riding service". Modern Railways. London. June 2010. p. 7..
  49. ^ a b Killer, Will (4 June 2010). "Train company 'pleasantly surprised' at Bradford user numbers". Telegraph & Argus. Bradford. Retrieved 9 June 2010.
  50. ^ "National Rail Trends Chapter 2" (PDF). Office for Rail Regulation.
  51. ^ "National Passenger Survey - Autumn 2009". Passenger Focus. 4 February 2010. Retrieved 13 May 2010.
  52. ^ "Grand Central Railway to operate HST power cars and loco-hauled Mk3s". The RailwayCentre.Com.
  53. ^ "New rail service launch delayed". BBC News Online. 21 November 2006. Retrieved 5 January 2010.
  54. ^ "125 History - Privatisation 2005 - Present". 125Group.
  55. ^ "New engines and new look for Grand Central HSTs". Rail. No. 654. Peterborough. 6 October 2010. p. 11.
  56. ^ Network Rail Acceptance of proposed vehicle change, 11 June 2008.
  57. ^ "Grand Central honours Yorkshire vet 'James Herriot'" (PDF). Railway Herald. No. 188. Scunthorpe. 2009. p. 3. Retrieved 30 June 2011. {{cite news}}: Unknown parameter |month= ignored (help)
  58. ^ Miles, Tony (2009). "Third Adelante for Grand Union". Modern Railways. London. p. 92. {{cite news}}: Unknown parameter |month= ignored (help)
  59. ^ "GC sets out plan for five '180s' by 2010". Rail. No. 624. Peterborough. 12 August 2009. p. 15.
  60. ^ "Rail company's Chinese trains bid". BBC News Online. 12 April 2007. Retrieved 5 January 2010.
  61. ^ Miles, Tony (November 2009). "DOR evaluates alternative to Adelante sets". Modern Railways. London. p. 74.
  62. ^ Grand Central North Western - Restoring direct trains between London and Blackpool in 2012 - Grand Central
  63. ^ "Sunderland – London crew training trips start next week" (Press release). Grand Central.
  64. ^ The Railway Centre Picture of the Day Index 6 May 2008, 15 May 2008
  65. ^ "Application to the Office of Rail Regulation for a passenger track access contract under section 17 of the Railways Act 1993" (PDF). Office of Rail Regulation. 2010.
  66. ^ Miles, Tony (2010). "Blackpool through service proposed in West Coast path frenzy". Modern Railways. London. p. 6. {{cite news}}: Unknown parameter |month= ignored (help)
  67. ^ Grand Union - Track Access Rights on the East Coast Main Line, Office of the Rail Regulator, 28 March 2008
  68. ^ "Virgin's competition protection deserves to be challenged for the good of the railway". TransportXtra. 29 August 2008. Retrieved 20 November 2011.
  69. ^ "Lincoln to London rail service could be saved by another train operator". Lincolnshire Echo. Lincoln. 25 June 2010. Retrieved 25 June 2010.
  70. ^ "GC Magazine Issue 1" (PDF). Grand Central. Retrieved 20 November 2011.