Abstract
This paper considers the problem of motivating the reduction of project duration. The duration cuts of project works and the corresponding costs are given. A group incentive scheme is used to compensate for the costs. In this scheme, all works are partitioned into groups and a unified incentive scheme is applied for each group. Two types of unified incentive schemes are studied for groups, namely, linear and jump ones. The problem is to partition all project works into groups and choose an appropriate incentive scheme for each group by minimizing the total incentive fund. Solution algorithms are proposed based on determining the shortest path in the network. Special cases are also analyzed (partition with the minimum number of groups and partition with the maximum number of groups).
REFERENCES
Novikov, D.A., Stimulirovanie v organizatsionnykh sistemakh (Incentives in Organizational Systems), Moscow: Sinteg, 2003.
Novikov, D.A. and Tsvetkov, A.V., Mekhanizmy stimulirovaniya v mnogoelementnykh organizatsionnykh sistemakh (Incentive Mechanisms in Multielement Organizational Systems), Moscow: Apostrof, 2000.
Burkov, V.N., Burkova, I.V., Goubko, M.V., et al., Mekhanizmy upravleniya (Control Mechanisms), Novikov, D.A., Ed., Moscow: LENAND, 2013.
Author information
Authors and Affiliations
Corresponding authors
Additional information
This paper was recommended for publication by A.I. Mikhalskii, a member of the Editorial Board
Publisher’s Note.
Pleiades Publishing remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Burkov, V.N., Burkova, I.V. & Kashenkov, A.R. Optimization of Group Incentive Schemes. Autom Remote Control 84, 1294–1301 (2023). https://doi.org/10.1134/S0005117923120020
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S0005117923120020