-
Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
Authors:
A. Romero Francia,
A. Perillo Marcone,
S. Pianese,
K. Andersen,
G. Arnau Izquierdo,
J. A. Briz,
D. Carbajo Perez,
E. Carlier,
T. Coiffet,
L. S. Esposito,
J. L. Grenard,
D. Grenier,
J. Humbert,
K. Kershaw,
J. Lendaro,
A. Ortega Rolo,
K. Scibor,
D. Senajova,
S. Sgobba,
C. Sharp,
D. Steyaert,
F. M. Velotti,
H. Vincke,
V. Vlachoudis,
M. Calviani
Abstract:
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams with…
▽ More
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
△ Less
Submitted 27 December, 2023; v1 submitted 24 December, 2023;
originally announced December 2023.
-
Automatic setup of 18 MeV electron beamline using machine learning
Authors:
Francesco Maria Velotti,
Brennan Goddard,
Verena Kain,
Rebecca Ramjiawan,
Giovanni Zevi Della Porta,
Simon Hirlaender
Abstract:
To improve the performance-critical stability and brightness of the electron bunch at injection into the proton-driven plasma wakefield at the AWAKE CERN experiment, automation approaches based on unsupervised Machine Learning (ML) were developed and deployed. Numerical optimisers were tested together with different model-free reinforcement learning agents. In order to avoid any bias, reinforcemen…
▽ More
To improve the performance-critical stability and brightness of the electron bunch at injection into the proton-driven plasma wakefield at the AWAKE CERN experiment, automation approaches based on unsupervised Machine Learning (ML) were developed and deployed. Numerical optimisers were tested together with different model-free reinforcement learning agents. In order to avoid any bias, reinforcement learning agents have been trained also using a completely unsupervised state encoding using auto-encoders. To aid hyper-parameter selection, a full synthetic model of the beamline was constructed using a variational auto-encoder trained to generate surrogate data from equipment settings. This paper describes the novel approaches based on deep learning and reinforcement learning to aid the automatic setup of a low energy line, as the one used to deliver beam to the AWAKE facility. The results obtained with the different ML approaches, including automatic unsupervised feature extraction from images using computer vision are presented. The prospects for operational deployment and wider applicability are discussed.
△ Less
Submitted 7 September, 2022;
originally announced September 2022.
-
Design of a new SPS injection system via numerical optimisation
Authors:
E. Waagaard,
M. J. Barnes,
W. Bartmann,
J. Borburgh,
L. S. Ducimetière,
T. Kramer,
T. Stadlbauer,
P. Trubacova,
F. M. Velotti
Abstract:
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the de…
▽ More
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the design of a completely new injection system for the SPS using multi-level numerical optimisation, including realistic hardware assumptions. We also present how this hierarchical optimisation framework can be adapted to other situations for optimal accelerator system design.
△ Less
Submitted 29 June, 2022; v1 submitted 23 June, 2022;
originally announced June 2022.
-
Millisecond burst extractions from synchrotrons using RF phase displacement acceleration
Authors:
Pablo A. Arrutia Sota,
Philip N. Burrows,
Matthew A. Fraser,
Francesco M. Velotti
Abstract:
FLASH radiation therapy calls for the delivery of fast bursted spills of particles with dose delivery times of the order of milliseconds. The requirements overlap with fundamental physics experimental requests that are being studied at CERN, albeit at very different energy scales. In this contribution, a scheme for extracting millisecond bursts from synchrotrons is explored by controlling a third-…
▽ More
FLASH radiation therapy calls for the delivery of fast bursted spills of particles with dose delivery times of the order of milliseconds. The requirements overlap with fundamental physics experimental requests that are being studied at CERN, albeit at very different energy scales. In this contribution, a scheme for extracting millisecond bursts from synchrotrons is explored by controlling a third-integer resonant and chromatic extraction with RF phase displacement acceleration. The scheme would be implementable in existing medical and experimental synchrotron facilities. Using a model of the CERN Proton Synchrotron, both single-burst and multi-burst extractions are simulated. Results show that 80 - 90% of the total beam intensity is extracted in a single burst of 40 - 60 ms. This would correspond to a ~10 ms burst in a typical medical synchrotron, namely the one outlined in the Proton Ion Medical Machine Study. A set of 3 consecutive bursts of 30 ms was simulated in the Proton Synchrotron with optimised machine parameters.
△ Less
Submitted 26 May, 2022;
originally announced May 2022.
-
Injection tolerances and self-matching in a quasilinear wakefield accelerator
Authors:
John P. Farmer,
Linbo Liang,
Rebecca Ramjiawan,
Francesco M. Velotti,
Martin Weidl,
Edda Gschwendtner,
Patric Muggli
Abstract:
Particle acceleration in a quasilinear plasma wake provides access to high acceleration gradients while avoiding self-trapping of the background electrons. However, the plasma response to the externally injected witness bunch leads to a variation of the focussing fields along the bunch length, which can lead to a emittance growth. In order to investigate the impact of this emittance growth on the…
▽ More
Particle acceleration in a quasilinear plasma wake provides access to high acceleration gradients while avoiding self-trapping of the background electrons. However, the plasma response to the externally injected witness bunch leads to a variation of the focussing fields along the bunch length, which can lead to a emittance growth. In order to investigate the impact of this emittance growth on the overall beam quality, we develop a single figure of merit based on a potential high-energy application for the AWAKE experiment at CERN. We show that the development of such a figure of merit naturally gives rise to constraints on both the tunability and stability of the initial witness bunch parameters. It is further shown that the unique physics of the quasilinear wake gives rise to broad tolerances for the witness bunch radius at the injection point, as the plasma wakefields self-match to the witness bunch.
△ Less
Submitted 21 June, 2022; v1 submitted 22 March, 2022;
originally announced March 2022.
-
Online Multi-Objective Particle Accelerator Optimization of the AWAKE Electron Beam Line for Simultaneous Emittance and Orbit Control
Authors:
Alexander Scheinker,
Simon Hirlaende,
Francesco Maria Velotti,
Spencer Gessner,
Giovanni Zevi Della Port,
Verena Kain,
Rebecca Ramjiawan
Abstract:
Multi-objective optimization is important for particle accelerators where various competing objectives must be satisfied routinely such as, for example, transverse emittance vs bunch length. We develop and demonstrate an online multi-time scale multi-objective optimization algorithm that performs real time feedback on particle accelerators. We demonstrate the ability to simultaneously minimize the…
▽ More
Multi-objective optimization is important for particle accelerators where various competing objectives must be satisfied routinely such as, for example, transverse emittance vs bunch length. We develop and demonstrate an online multi-time scale multi-objective optimization algorithm that performs real time feedback on particle accelerators. We demonstrate the ability to simultaneously minimize the emittance and maintain a reference trajectory of a beam in the electron beamline in CERN's Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE).
△ Less
Submitted 24 March, 2020;
originally announced March 2020.
-
Predicting the Trajectory of a Relativistic Electron Beam for External Injection in Plasma Wakefields
Authors:
Felipe Peña Asmus,
Francesco Maria Velotti,
Marlene Turner,
Spencer Gessner,
Mikhail Martyanov,
Chiara Bracco,
Brennan Goddard,
Patric Muggli
Abstract:
We use beam position measurements over the first part of the AWAKE electron beamline, together with beamline modeling, to deduce the beam average momentum and to predict the beam position in the second part of the beamline. Results show that using only the first five beam position monitors leads to much larger differences between predicted and measured positions at the last two monitors than when…
▽ More
We use beam position measurements over the first part of the AWAKE electron beamline, together with beamline modeling, to deduce the beam average momentum and to predict the beam position in the second part of the beamline. Results show that using only the first five beam position monitors leads to much larger differences between predicted and measured positions at the last two monitors than when using the first eight beam position monitors. These last two positions can in principle be used with ballistic calculations to predict the parameters of closest approach of the electron bunch with the proton beam. In external injection experiments of the electron bunch into plasma wakefields driven by the proton bunch, only the first five beam position monitors measurements remain un-affected by the presence of the much higher charge proton bunch. Results with eight beam position monitors show the prediction method works in principle to determine electron and proton beams closest approach within the wakefields width ($<$1\,mm), corresponding to injection of electrons into the wakefields. Using five beam position monitors is not sufficient.
△ Less
Submitted 2 February, 2020;
originally announced February 2020.
-
SPS Beam Dump Facility -- Comprehensive Design Study
Authors:
C. Ahdida,
R. G. Alia,
G. Arduini,
A. Arnalich,
P. Avigni,
F. Bardou,
M. Battistin,
J. Bauche,
M. Brugger,
J. Busom,
M. Calviani,
M. Casolino,
N. Colonna,
L. Dougherty,
Y. Dutheil,
E. Fornasiere,
M. A. Fraser,
L. Gatignon,
J. Gall,
S. Gilardoni,
B. Goddard,
J-L. Grenard,
D. Grenier,
C. Hessler,
R. Jacobsson
, et al. (23 additional authors not shown)
Abstract:
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector…
▽ More
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment.
Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.
△ Less
Submitted 13 December, 2019;
originally announced December 2019.
-
Upgrades Of the SPS, Transfer Line and LHC Injection Protection Devices For the HL-LHC Era
Authors:
Ö. Mete,
O. Aberle,
F. Cerutti,
K. Cornelis,
B. Goddard,
V. Kain,
R. Losito,
F. L. Maciariello,
M. Meddahi,
J. Uythoven,
F. M. Velotti,
E. Gianfelice-Wendt,
A. Mereghetti
Abstract:
The challenging High Luminosity LHC (HL-LHC) beam requirements will lead in the future to unprecedented beam parameters along the LHC injector chain. In the SPS accelerator these requests translate into about a factor two higher intensity and brightness than the present design performance. In addition to the challenge of producing and accelerating such beams, these parameters affect the resistance…
▽ More
The challenging High Luminosity LHC (HL-LHC) beam requirements will lead in the future to unprecedented beam parameters along the LHC injector chain. In the SPS accelerator these requests translate into about a factor two higher intensity and brightness than the present design performance. In addition to the challenge of producing and accelerating such beams, these parameters affect the resistance of the existing equipment against beam impact. Most of the protection devices in the SPS ring, its transfer lines and the LHC injection areas will be put under operational constraints which are beyond their design specification. The equipment concerned has been reviewed and their resistance to the HL-LHC beams checked. Theoretical and simulation studies have been performed for the SPS beam scraping system, the protection devices and the dump absorbers of the SPS-to-LHC transfer lines, as well as for the LHC injection protection devices. The first results of these studies are reported, together with the future prospects.
△ Less
Submitted 19 September, 2014;
originally announced September 2014.