-
PIP-II Linac Cryogenic Distribution System Design Challenges
Authors:
T. Banaszkiewicz,
M. Chorowski,
P. Duda,
M. Stanclik,
R. Dhuley,
A. Martinez,
W. Soyars
Abstract:
The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising 25 Bayonet Cans, and ends with a Turnaround Can. Multiple helium streams, each characterized by distinct helium parameters, flow through each of these elements.…
▽ More
The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising 25 Bayonet Cans, and ends with a Turnaround Can. Multiple helium streams, each characterized by distinct helium parameters, flow through each of these elements. The CDS geometry allows maintaining an acceptable pressure drop for each helium stream, considering the planned flows and helium parameters in different operation modes. This is particularly crucial for the return line of helium vapors, which return from cryomodules to the cold compressors and thus have very restrictive pressure drop requirements. On both sides of the DVB there are fixed supports for process pipes. One of the DVB design challenges was to route the process pipes in such a way that their shape provided sufficient compensation for thermal shrinkage. This ensures th at the forces resulting from thermal shrinkage acting on the cryogenic valves remain at a level acceptable to the manufacturer. The required thermal budget of the CDS was achieved by thermo-mechanical optimization of its components, like process pipes fixed supports in Bayonet Cans.
△ Less
Submitted 20 August, 2024;
originally announced August 2024.
-
Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility
Authors:
Maria Barba,
Benjamin Hansen,
Michael White,
Gregory Johnson,
Omar Al Atassi,
Jun Dong,
Shreya Ranpariya,
William Soyars,
Ahmed Faraj,
Pratik Patel,
Noelle Besse,
Annelise Machefel,
Lois Perrot
Abstract:
The increase over the last years of the testing activities related to quantum systems, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic l…
▽ More
The increase over the last years of the testing activities related to quantum systems, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4 kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three control valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two Dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.
△ Less
Submitted 29 August, 2023;
originally announced August 2023.
-
Warm Compressor system Overview and status of the PIP-II cryogenic system
Authors:
A Martinez,
J Creus Prats,
W Soyars,
R Dhuley,
B Hansen,
Y Jia,
A Chakravarty,
M Goyal,
T Banaszkiewicz,
P Duda,
M Stanclik
Abstract:
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single…
▽ More
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.
△ Less
Submitted 21 August, 2023;
originally announced August 2023.
-
Pressure safety approach for PIP-II cryogenic distribution system and cryomodules
Authors:
William Soyars,
Tomasz Banaszkiewicz,
Ram Dhuley
Abstract:
The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic tran…
▽ More
The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.
△ Less
Submitted 17 July, 2023;
originally announced July 2023.
-
Proton Improvement Plan II Cryogenic Distribution System thermodynamic design
Authors:
Ashish Kumar Shukla,
Andrew Dalesandro,
Ram Dhuley,
William Soyars
Abstract:
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will be provided by cryogenic helium produced by a Helium Cryoplant and distributed by a Cryogenic Distribution System (CDS). Based primarily on the Linac heat load…
▽ More
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will be provided by cryogenic helium produced by a Helium Cryoplant and distributed by a Cryogenic Distribution System (CDS). Based primarily on the Linac heat load requirements at each temperature and the allowable pressure drop, we have made a preliminary thermodynamic design of the CDS. The design also incorporates special requirements such as controlled and or fast cooldown of the superconducting RF cavities and their dual maximum allowable working pressure. This paper presents the overall features of the PIPII CDS, sizing of helium process circuits, different operating modes, and calculated mass flow capacities that cater to these operating modes.
△ Less
Submitted 22 June, 2022;
originally announced June 2022.
-
Upgrade of the ILC cryomodule
Authors:
A. Basti,
F. Bedeschi,
A. Bryzgalin,
J. Budagov,
P. Fabbricatore,
E. Harms,
S. Illarionov,
S. Nagaitsev,
E. Pekar,
V. Rybakov,
B. Sabirov,
Ju. Samarokov,
W. Soyars,
Ju. Taran,
G. Trubnikov
Abstract:
Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions Ti_SS, Nb_SS have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest v…
▽ More
Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions Ti_SS, Nb_SS have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest version of the Nb/Ti/SS transition element has led to improvement of the ILC cryomodule. This new component resolves problems of residual stress, and its specific design prevents the possibility of a shift due to the difference in the linear expansion coefficients of the constituent metals. Leak tests with the He gas revealed no leaks at the background rate of 0.2x10-10atmxcc-1s. The test results are very encouraging. The up-to-date design of trimetallic Nb_Ti_SS element promises technologically simpler and less expensive manufacture. Investigations have shown that explosion welding allows unique trimetallic components to be made not only for cryogenic units of accelerators but also for laboratory equipment and for general engineering applications.
△ Less
Submitted 13 April, 2020;
originally announced April 2020.
-
Fermilab Muon Campus g-2 Cryogenic Distribution Remote Control System
Authors:
L. Pei,
J. Theilacker,
A. Klebaner,
W. Soyars,
R. Bossert
Abstract:
The Muon Campus (MC) is able to measure Muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors and four liquid helium refrigerators. The centerpiece of the Muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire, was…
▽ More
The Muon Campus (MC) is able to measure Muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors and four liquid helium refrigerators. The centerpiece of the Muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire, was built for the previous g-2 experiment at Brookhaven. Due to each subsystem has to be far away from each other and be placed in the distant location, therefore, Siemens Process Control System PCS7-400, Automation Direct DL205 & DL05 PLC, Synoptic and Fermilab ACNET HMI are the ideal choices as the MC g-2 cryogenic distribution real-time and on-Line remote control system.
This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time and On-Line remote control systems.
△ Less
Submitted 5 November, 2015;
originally announced November 2015.
-
Dynamic PID loop control
Authors:
L. Pei,
A. Klebaner,
J. Theilacker,
W. Soyars,
A. Martinez,
R. Bossert,
B. DeGraff,
C. Darve
Abstract:
The Horizontal Test Stand (HTS) SRF Cavity and Cryomodule 1 (CM1) of eight 9-cell, 1.3GHz SRF cavities are operating at Fermilab. For the cryogenic control system, how to hold liquid level constant in the cryostat by regulation of its Joule-Thompson JT-valve is very important after cryostat cool down to 2.0 K. The 72-cell cryostat liquid level response generally takes a long time delay after regul…
▽ More
The Horizontal Test Stand (HTS) SRF Cavity and Cryomodule 1 (CM1) of eight 9-cell, 1.3GHz SRF cavities are operating at Fermilab. For the cryogenic control system, how to hold liquid level constant in the cryostat by regulation of its Joule-Thompson JT-valve is very important after cryostat cool down to 2.0 K. The 72-cell cryostat liquid level response generally takes a long time delay after regulating its JT-valve; therefore, typical PID control loop should result in some cryostat parameter oscillations. This paper presents a type of PID parameter self-optimal and Time-Delay control method used to reduce cryogenic system parameters' oscillation.
△ Less
Submitted 19 September, 2012;
originally announced September 2012.
-
Measurements of SCRF cavity dynamic heat load in horizontal test system
Authors:
B. D. DeGraff,
R. J. Bossert,
L. Pei,
W. M. Soyars
Abstract:
The Horizontal Test System (HTS) at Fermilab is currently testing fully assembled, dressed superconducting radio frequency (SCRF) cavities. These cavities are cooled in a bath of superfluid helium at 1.8K. Dissipated RF power from the cavities is a dynamic heat load on the cryogenic system. The magnitude of heat flux from these cavities into the helium is also an important variable for understandi…
▽ More
The Horizontal Test System (HTS) at Fermilab is currently testing fully assembled, dressed superconducting radio frequency (SCRF) cavities. These cavities are cooled in a bath of superfluid helium at 1.8K. Dissipated RF power from the cavities is a dynamic heat load on the cryogenic system. The magnitude of heat flux from these cavities into the helium is also an important variable for understanding cavity performance. Methods and hardware used to measure this dynamic heat load are presented. Results are presented from several cavity tests and testing accuracy is discussed.
△ Less
Submitted 5 July, 2012;
originally announced July 2012.
-
Superfluid helium testing of a stainless steel to titanium piping transition joint
Authors:
W. Soyars,
A. Basti,
F. Bedeschi,
J. Budagov,
M. Foley,
E. Harms,
A. Klebaner,
S. Nagaitsev,
B. Sabirov
Abstract:
Stainless steel-to-titanium bimetallic transitions have been fabricated with an explosively bonded joint. This novel joining technique was conducted by the Russian Federal Nuclear Center, working under contract for the Joint Institute for Nuclear Research. These bimetallic transitions are being considered for use in future superconducting radio-frequency cavity cryomodule assemblies. This applicat…
▽ More
Stainless steel-to-titanium bimetallic transitions have been fabricated with an explosively bonded joint. This novel joining technique was conducted by the Russian Federal Nuclear Center, working under contract for the Joint Institute for Nuclear Research. These bimetallic transitions are being considered for use in future superconducting radio-frequency cavity cryomodule assemblies. This application requires cryogenic testing to demonstrate that this transition joint remains leak-tight when sealing superfluid helium. To simulate a titanium cavity vessel connection to a stainless steel service pipe, bimetallic transition joints were paired together to fabricate piping assemblies. These piping assemblies were then tested in superfluid helium conditions at Fermi National Accelerator Laboratory test facilities. The transition joint test program will be described. Fabrication experience and test results will be presented.
△ Less
Submitted 27 June, 2012;
originally announced June 2012.
-
First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab
Authors:
R. Madrak,
J. Branlard,
B. Chase,
C. Darve,
P. Joireman,
T. Khabiboulline,
A. Mukherjee,
T. Nicol,
E. Peoples-Evans,
D. Peterson,
Y. Pischalnikov,
L. Ristori,
W. Schappert,
D. Sergatskov,
W. Soyars,
J. Steimel,
I. Terechkine,
V. Tupikov,
R. Wagner,
R. C. Webber,
D. Wildman
Abstract:
In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. Fo…
▽ More
In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Qext ~ 106 was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.
△ Less
Submitted 17 February, 2012;
originally announced February 2012.
-
First high gradient test results of a dressed 325 MHz superconducting single spoke resonator at Fermilab
Authors:
R. C. Webber,
T. Khabiboulline,
R. Madrak,
T. Nicol,
L. Ristori,
W. Soyars,
R. Wagner
Abstract:
A new superconducting RF cavity test facility has been commissioned at Fermilab in conjunction with first tests of a 325 MHz, β = 0.22 superconducting single-spoke cavity dressed with a helium jacket and prototype tuner. The facility is described and results of full gradient, CW cavity tests with a high Qext drive coupler are reported. Sensitivities to Q disease and externally applied magnetic fie…
▽ More
A new superconducting RF cavity test facility has been commissioned at Fermilab in conjunction with first tests of a 325 MHz, β = 0.22 superconducting single-spoke cavity dressed with a helium jacket and prototype tuner. The facility is described and results of full gradient, CW cavity tests with a high Qext drive coupler are reported. Sensitivities to Q disease and externally applied magnetic fields were investigated. Results are compared to bare cavity results obtained prior to hydrogen degassing and welding into the helium jacket.
△ Less
Submitted 7 February, 2012;
originally announced February 2012.
-
Recent advances in Ti and Nb explosion welding with stainless steel for 2K operating (ILC Program)- To the proceedings of LCWS11
Authors:
B. Sabirov,
J. Budagov,
A. Sissakian,
G. Shirkov,
Yu. Taran,
G. Trubnikov,
N. Dhanarai,
M. Foley,
E. Harms,
D. Mitchell,
S. Nagaitsev,
W. Soyars,
V. Rybakov,
Yu. Samarokov,
V. Zhigalov,
A. Basti,
F. Bedeschi
Abstract:
The world first samples 0f Ti+SS and Nb+SS joints were manufactured by an explosion welding technology demonstrating a high mechanic properties and leak absence at 4.6 x 10^{-9} atm-cc/sec. Residual stresses in bimetallic joints resulting from explosion welding measured by neutron diffraction method are quite high (~1000 MPa). Thermal tempering of explosion welded Ti+SS and Nb+SS specimens leads t…
▽ More
The world first samples 0f Ti+SS and Nb+SS joints were manufactured by an explosion welding technology demonstrating a high mechanic properties and leak absence at 4.6 x 10^{-9} atm-cc/sec. Residual stresses in bimetallic joints resulting from explosion welding measured by neutron diffraction method are quite high (~1000 MPa). Thermal tempering of explosion welded Ti+SS and Nb+SS specimens leads to complete relaxation of internal stresses in Ti,Nb and Stainless steel and makes the transition elements quite serviceable.
△ Less
Submitted 17 January, 2012;
originally announced January 2012.