-
Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
Authors:
A. Romero Francia,
A. Perillo Marcone,
S. Pianese,
K. Andersen,
G. Arnau Izquierdo,
J. A. Briz,
D. Carbajo Perez,
E. Carlier,
T. Coiffet,
L. S. Esposito,
J. L. Grenard,
D. Grenier,
J. Humbert,
K. Kershaw,
J. Lendaro,
A. Ortega Rolo,
K. Scibor,
D. Senajova,
S. Sgobba,
C. Sharp,
D. Steyaert,
F. M. Velotti,
H. Vincke,
V. Vlachoudis,
M. Calviani
Abstract:
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams with…
▽ More
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
△ Less
Submitted 27 December, 2023; v1 submitted 24 December, 2023;
originally announced December 2023.
-
Design development and implementation of an irradiation station at the neutron time-of-flight facility at CERN
Authors:
M. Ferrari,
D. Senajova,
O. Aberle,
Y. Aguiar,
D. Baillard,
M. Barbagallo,
A. -P. Bernardes,
L. Buonocore,
M. Cecchetto,
V. Clerc,
M. Di Castro,
R. Garcia Alia,
S. Girod,
J. -L. Grenard,
K. Kershaw,
G. Lerner,
M. Maeder,
A. Makovec,
A. Mengoni,
M. Perez Ornedo,
F. Pozzi,
C. V. Almagro,
M. Calviani
Abstract:
A new parasitic, mixed-field, neutron-dominated irradiation station has been recently commissioned at the European Laboratory for Particle Physics (CERN). The station is installed in the Neutron Time-Of-Flight (n\_TOF) facility, taking advantage of the secondary radiation produced by the neutron spallation target. The new station allows radiation damage studies to be performed in irradiation condi…
▽ More
A new parasitic, mixed-field, neutron-dominated irradiation station has been recently commissioned at the European Laboratory for Particle Physics (CERN). The station is installed in the Neutron Time-Of-Flight (n\_TOF) facility, taking advantage of the secondary radiation produced by the neutron spallation target. The new station allows radiation damage studies to be performed in irradiation conditions that are closer to the ones encountered during the operation of particle accelerators; the irradiation tests carried out in the station will be complementary to the standard tests on materials, usually performed with gamma sources. Samples will be exposed to neutron doses in the MGy range per year, with minimal impact on the n TOF facility operation. The station has twenty-four irradiation positions, each hosting up to 100 cm3 of sample material. In view of its proximity to the n\_TOF target, inside protective shielding, the irradiation station and its operating procedures have been carefully developed taking into account the safety of personnel and to avoid any unwanted impact on the operation of the n\_TOF facility and experiments. Due to the residual radioactivity of the whole area around the n\_TOF target and of the irradiated samples, access to the irradiation station is forbidden to human operators even when the n\_TOF facility is not in operation. Robots are used for the remote installation and retrieval of the samples, and other optimizations of the handling procedures were developed in compliance with radiation protection regulations and the aim of minimizing doses to personnel.
△ Less
Submitted 18 June, 2022; v1 submitted 25 February, 2022;
originally announced February 2022.
-
High intensity proton beam impact at 440 GeV/c on Mo and Cu coated CfC/graphite and SiC/SiC absorbers for beam intercepting devices
Authors:
Jorge Maestre,
Cristina Bahamonde,
Inigo Lamas Garcia,
Keith Kershaw,
Nicolo Biancacci,
Josep Busom,
Matthias Frankl,
Anton Lechner,
Adnan Kurtulus,
Shunsuke Makimura,
Naofumi Nakazato,
Ana Teresa Perez,
Antonio Perillo-Marcone,
Benoit Salvant,
Regis Seidenbinder,
Lorenzo Teofili,
Marco Calviani
Abstract:
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the…
▽ More
Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the LHC. Several issues with the TDI were encountered during LHC operation, most of them due to outgassing from its core components induced by electron cloud effects, which led to limitations of the injector intensity and hence had an impact on LHC availability. The absorbing cores of the TDIs, and of beam intercepting devices in general, need to deal with high thermo-mechanical loads induced by the high intensity particle beams. In addition, devices such as the TDI - where the absorbing materials are installed close to the beam, are important contributors to the accelerator impedance budget. To reduce impedance, the absorbing materials that make up the core must be typically coated with high electrical conductivity metals. Beam impact testing of the coated absorbers is a crucial element of development work to ensure their correct operation. The behaviour of several metal-coated absorber materials was investigated when exposed to high intensity and high energy proton beams in the HiRadMat facility at CERN. Different coating configurations based on copper and molybdenum, and absorbing materials such as isostatic graphite, Carbon Fibre Composite (CfC) and Silicon Carbide reinforced with Silicon Carbide fibres (SiC-SiC), were tested in the facility to assess the TDI's performance and to extract information for other BIDs using these materials. In addition to beam impact tests and an extensive Post Irradiation Examination (PIE) campaign, extensive numerical simulations were carried out.
△ Less
Submitted 22 December, 2021; v1 submitted 9 December, 2021;
originally announced December 2021.
-
Design and behaviour of the Large Hadron Collider external beam dumps capable of receiving 539 MJ/dump
Authors:
J. Maestre,
C. Torregrosa,
K. Kershaw,
C. Bracco,
T. Coiffet,
M. Ferrari,
R. Franqueira Ximenes,
S. Gilardoni,
D. Grenier,
A. Lechner,
V. Maire,
J. M. Martin Ruiz,
E. Matheson,
N. Solieri,
A. Perillo Marcone,
T. Polzin,
V. Rizzoglio,
D. Senajova,
C. Sharp,
M. Timmins,
M. Calviani
Abstract:
Two 6-t beam dumps, made of a graphite core encapsulated in a stainless steel vessel, are used to absorb the energy of the two Large Hadron Collider (LHC) intense proton beams during operation of the accelerator. Operational issues started to appear in 2015 during LHC Run 2 (2014-2018) as a consequence of the progressive increase of the LHC beam kinetic energy, necessitating technical intervention…
▽ More
Two 6-t beam dumps, made of a graphite core encapsulated in a stainless steel vessel, are used to absorb the energy of the two Large Hadron Collider (LHC) intense proton beams during operation of the accelerator. Operational issues started to appear in 2015 during LHC Run 2 (2014-2018) as a consequence of the progressive increase of the LHC beam kinetic energy, necessitating technical interventions in the highly radioactive areas around the dumps. Nitrogen gas leaks appeared after highly energetic beam impacts and instrumentation measurements indicated an initially unforeseen movement of the dumps. A computer modelling analysis campaign was launched to understand the origin of these issues, including both Monte Carlo simulations to model the proton beam interaction as well as advanced thermo-mechanical analyses. The main findings were that the amount of instantaneous energy deposited in the dump vessel leads to a strong dynamic response of the whole dump and high accelerations (above 2000g). Based on these findings, an upgraded design, including a new support system and beam windows, was implemented to ensure the dumps' compatibility with the more intense beams foreseen during LHC Run 3 (2022-2025) of 539 MJ per beam. In this paper an integral overview of the operational behaviour of the dumps and the upgraded configurations are discussed.
△ Less
Submitted 27 October, 2021; v1 submitted 17 October, 2021;
originally announced October 2021.
-
Design of the third-generation lead-based neutron spallation target for the neutron time-of-flight facility at CERN
Authors:
Raffaele Esposito,
Marco Calviani,
Oliver Aberle,
Massimo Barbagallo,
Daniel Cano-Ott,
Nicola Colonna,
Thibaut Coiffet,
César Domingo-Pardo,
Francesco Dragoni,
Rui Franqueira Ximenes,
Laurene Giordanino,
Damien Grenier,
Frank Gunsing,
Keith Kershaw,
Roland Logé,
Vincent Maire,
Pierre Moyret,
Ana Teresa Perez Fontenla,
Antonio Perillo-Marcone,
Fabio Pozzi,
Stefano Sgobba,
Marc Timmins,
Vasilis Vlachoudis
Abstract:
The neutron time-of-flight (n_TOF) facility at the European Laboratory for Particle Physics (CERN) is a pulsed white-spectrum neutron spallation source producing neutrons for two experimental areas: the Experimental Area 1 (EAR1), located 185 m horizontally from the target, and the Experimental Area 2 (EAR2), located 20 m above the target. The target, based on pure lead, is impacted by a high-inte…
▽ More
The neutron time-of-flight (n_TOF) facility at the European Laboratory for Particle Physics (CERN) is a pulsed white-spectrum neutron spallation source producing neutrons for two experimental areas: the Experimental Area 1 (EAR1), located 185 m horizontally from the target, and the Experimental Area 2 (EAR2), located 20 m above the target. The target, based on pure lead, is impacted by a high-intensity 20-GeV/c pulsed proton beam. The facility was conceived to study neutron-nucleus interactions for neutron kinetic energies between a few meV to several GeV, with applications of interest for nuclear astrophysics, nuclear technology, and medical research. After the second-generation target reached the end of its lifetime, the facility underwent a major upgrade during CERN's Long Shutdown 2 (LS2, 2019-2021), which included the installation of the new third-generation neutron target. The first and second-generation targets were based on water-cooled massive lead blocks and were designed focusing on EAR1, since EAR2 was built later. The new target is cooled by nitrogen gas to avoid erosion-corrosion and contamination of cooling water with radioactive lead spallation products. Moreover, the new design is optimized also for the vertical flight path and EAR2. This paper presents an overview of the target design focused on both physics and thermo-mechanical performance, and includes a description of the nitrogen cooling circuit and radiation protection studies.
△ Less
Submitted 14 August, 2021; v1 submitted 21 June, 2021;
originally announced June 2021.
-
Hot Isostatic Pressing (HIP) assisted diffusion bonding between CuCr1Zr and AISI 316L for application to the Super Proton Synchrotron (SPS) internal beam dump at CERN
Authors:
Stefano Pianese,
Antonio Perillo-Marcone,
François-Xavier Nuiry,
Marco Calviani,
Krzysztof Adam Szczurek,
Gonzalo Arnau Izquierdo,
Pietro Avigni,
Simon Bonnin,
Josep Busom Descarrega,
Thierry Feniet,
Keith Kershaw,
Jerome Lendaro,
Ana Teresa Perez Fontenla,
Thomas Schubert,
Thomas Weissgärber
Abstract:
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cool…
▽ More
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cooling circuits and the materials of the dump's core in order to maximise the heat transfer efficiency. This paper presents the investigation of HIP assisted diffusion bonding between two CuCr1Zr blanks enclosing SS 316L tubes and the realisation of a real size prototype of one of the dump's cooling plate, as well as the assessments of its cooling performance under the dumps most critical operational scenarios. Energy-dispersive X-ray (EDX) spectroscopy, microstructural analyses, measurements of thermal conductivity and mechanical strength were performed to characterize the HIP diffusion bonded interfaces (CuCr1Zr-CuCr1Zr and CuCr1Zr-SS316L). A test bench allowed to assess the cooling performance of the real size prototype. At the bonded interface, the presence of typical diffusional phenomena was observed. Moreover, measured tensile strength and thermal conductivity were at least equivalent to the lowest ones of the materials assembled and comparable to its bulk properties, meaning that a good bonding quality was achieved. Finally, the real size prototype was successfully tested with an ad-hoc thermal test bench and with the highest operational thermal power expected in the new generation SPS internal beam dump.
△ Less
Submitted 16 November, 2020;
originally announced November 2020.
-
Sensitivity of the SHiP experiment to dark photons decaying to a pair of charged particles
Authors:
SHiP Collaboration,
C. Ahdida,
A. Akmete,
R. Albanese,
A. Alexandrov,
A. Anokhina,
S. Aoki,
G. Arduini,
E. Atkin,
N. Azorskiy,
J. J. Back,
A. Bagulya,
F. Baaltasar Dos Santos,
A. Baranov,
F. Bardou,
G. J. Barker,
M. Battistin,
J. Bauche,
A. Bay,
V. Bayliss,
G. Bencivenni,
A. Y. Berdnikov,
Y. A. Berdnikov,
M. Bertani,
C. Betancourt
, et al. (309 additional authors not shown)
Abstract:
Dark photons are hypothetical massive vector particles that could mix with ordinary photons. The simplest theoretical model is fully characterised by only two parameters: the mass of the dark photon m$_{γ^{\mathrm{D}}}$ and its mixing parameter with the photon, $\varepsilon$. The sensitivity of the SHiP detector is reviewed for dark photons in the mass range between 0.002 and 10 GeV. Different pro…
▽ More
Dark photons are hypothetical massive vector particles that could mix with ordinary photons. The simplest theoretical model is fully characterised by only two parameters: the mass of the dark photon m$_{γ^{\mathrm{D}}}$ and its mixing parameter with the photon, $\varepsilon$. The sensitivity of the SHiP detector is reviewed for dark photons in the mass range between 0.002 and 10 GeV. Different production mechanisms are simulated, with the dark photons decaying to pairs of visible fermions, including both leptons and quarks. Exclusion contours are presented and compared with those of past experiments. The SHiP detector is expected to have a unique sensitivity for m$_{γ^{\mathrm{D}}}$ ranging between 0.8 and 3.3$^{+0.2}_{-0.5}$ GeV, and $\varepsilon^2$ ranging between $10^{-11}$ and $10^{-17}$.
△ Less
Submitted 1 March, 2021; v1 submitted 10 November, 2020;
originally announced November 2020.
-
SND@LHC
Authors:
SHiP Collaboration,
C. Ahdida,
A. Akmete,
R. Albanese,
A. Alexandrov,
M. Andreini,
A. Anokhina,
S. Aoki,
G. Arduini,
E. Atkin,
N. Azorskiy,
J. J. Back,
A. Bagulya,
F. Baaltasar Dos Santos,
A. Baranov,
F. Bardou,
G. J. Barker,
M. Battistin,
J. Bauche,
A. Bay,
V. Bayliss,
G. Bencivenni,
A. Y. Berdnikov,
Y. A. Berdnikov,
M. Bertani
, et al. (319 additional authors not shown)
Abstract:
We propose to build and operate a detector that, for the first time, will measure the process $pp\toνX$ at the LHC and search for feebly interacting particles (FIPs) in an unexplored domain. The TI18 tunnel has been identified as a suitable site to perform these measurements due to very low machine-induced background. The detector will be off-axis with respect to the ATLAS interaction point (IP1)…
▽ More
We propose to build and operate a detector that, for the first time, will measure the process $pp\toνX$ at the LHC and search for feebly interacting particles (FIPs) in an unexplored domain. The TI18 tunnel has been identified as a suitable site to perform these measurements due to very low machine-induced background. The detector will be off-axis with respect to the ATLAS interaction point (IP1) and, given the pseudo-rapidity range accessible, the corresponding neutrinos will mostly come from charm decays: the proposed experiment will thus make the first test of the heavy flavour production in a pseudo-rapidity range that is not accessible by the current LHC detectors. In order to efficiently reconstruct neutrino interactions and identify their flavour, the detector will combine in the target region nuclear emulsion technology with scintillating fibre tracking layers and it will adopt a muon identification system based on scintillating bars that will also play the role of a hadronic calorimeter. The time of flight measurement will be achieved thanks to a dedicated timing detector. The detector will be a small-scale prototype of the scattering and neutrino detector (SND) of the SHiP experiment: the operation of this detector will provide an important test of the neutrino reconstruction in a high occupancy environment.
△ Less
Submitted 20 February, 2020;
originally announced February 2020.
-
SPS Beam Dump Facility -- Comprehensive Design Study
Authors:
C. Ahdida,
R. G. Alia,
G. Arduini,
A. Arnalich,
P. Avigni,
F. Bardou,
M. Battistin,
J. Bauche,
M. Brugger,
J. Busom,
M. Calviani,
M. Casolino,
N. Colonna,
L. Dougherty,
Y. Dutheil,
E. Fornasiere,
M. A. Fraser,
L. Gatignon,
J. Gall,
S. Gilardoni,
B. Goddard,
J-L. Grenard,
D. Grenier,
C. Hessler,
R. Jacobsson
, et al. (23 additional authors not shown)
Abstract:
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector…
▽ More
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment.
Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.
△ Less
Submitted 13 December, 2019;
originally announced December 2019.
-
Design of a Helium Passivation System for the Target Vessel of the Beam Dump Facility at CERN
Authors:
P. Avigni,
M. Battistin,
M. Calviani,
P. Dalakov,
K. Kershaw,
J. Klier,
M. Lamont,
E. Lopez Sola,
J. M. Martin Ruiz
Abstract:
The Beam Dump Facility (BDF) is a proposed general-purpose facility at CERN, dedicated to fixed target and beam dump experiments, currently being developed in the context of the Physics Beyond Colliders program. The design of the facility will allow to host different types of experiments, of which SHiP is planned to be the initial one. The core of the facility is a high-density target/dump absorbi…
▽ More
The Beam Dump Facility (BDF) is a proposed general-purpose facility at CERN, dedicated to fixed target and beam dump experiments, currently being developed in the context of the Physics Beyond Colliders program. The design of the facility will allow to host different types of experiments, of which SHiP is planned to be the initial one. The core of the facility is a high-density target/dump absorbing the full intensity of the SPS beam and generating a cascade of particles that are detected downstream the target complex. The target and its shielding blocks are positioned inside a vessel, which is planned to be passivized with helium, in order to reduce the activation of the gas surrounding the target and to extend the operational life of materials and equipment. The passivation system that will be in charge of purifying and circulating the helium is a critical component for the operation of the facility. Fluid dynamics simulations have been performed to study the circulation of the helium through the vessel. A detailed design of the helium passivation system and its main components has been developed.
△ Less
Submitted 18 November, 2019; v1 submitted 1 October, 2019;
originally announced October 2019.
-
Design of a high power production target for the Beam Dump Facility at CERN
Authors:
E. Lopez Sola,
M. Calviani,
P. Avigni,
M. Battistin,
J. Busom Descarrega,
J. Canhoto Espadanal,
M. A. Fraser,
S. Gilardoni,
B. Goddard,
D. Grenier,
R. Jacobsson,
K. Kershaw,
M. Lamont,
A. Perillo-Marcone,
M. Pandey,
B. Riffaud,
S. Sgobba,
V. Vlachoudis,
L. Zuccalli
Abstract:
The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of opera…
▽ More
The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of operation, in order to search for feebly interacting particles. The target/dump assembly lies at the heart of the facility, with the aim of safely absorbing the full high intensity Super Proton Synchrotron (SPS) beam, while maximizing the production of charmed and beauty mesons. High-Z materials are required for the target/dump, in order to have the shortest possible absorber and reduce muon background for the downstream experiment. The high average power deposited on target (305 kW) creates a challenge for heat removal. During the BDF facility Comprehensive Design Study (CDS), launched by CERN in 2016, extensive studies have been carried out in order to define and assess the target assembly design. These studies are described in the present contribution, which details the proposed design of the BDF production target, as well as the material selection process and the optimization of the target configuration and beam dilution. One of the specific challenges and novelty of this work is the need to consider new target materials, such as a molybdenum alloy (TZM) as core absorbing material and Ta2.5W as cladding. Thermo-structural and fluid dynamics calculations have been performed to evaluate the reliability of the target and its cooling system under beam operation. In the framework of the target comprehensive design, a preliminary mechanical design of the full target assembly has also been carried out, assessing the feasibility of the whole target system.
△ Less
Submitted 30 October, 2019; v1 submitted 5 April, 2019;
originally announced April 2019.
-
Design Development for the Beam Dump Facility Target Complex at CERN
Authors:
K. Kershaw,
J. -L. Grenard,
M. Calviani,
C. Ahdida,
M. Casolino,
S. Delavalle,
D. Hounsome,
R. Jacobsson,
M. Lamont,
E. Lopez Sola,
R. Scott,
V. Vlachoudis,
H. Vincke
Abstract:
CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but which also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facili…
▽ More
CERN has launched a study phase to evaluate the feasibility of a new high-intensity beam dump facility at the CERN Super Proton Synchrotron accelerator with the primary goal of exploring Hidden Sector models and searching for Light Dark Matter, but which also offers opportunities for other fixed target flavour physics programs such as rare tau lepton decays and tau neutrino studies. The new facility will require - among other infrastructure - a target complex in which a dense target/dump will be installed, capable of absorbing the entire energy of the beam extracted from the SPS accelerator. In theory, the target/dump could produce very weakly interacting particles, to be investigated by a suite of particle detectors to be located downstream of the target complex. As part of the study, a development design of the target complex has been produced, taking into account the handling and remote handling operations needed through the lifetime of the facility. Two different handling concepts have been studied and both resulting designs are presented.
△ Less
Submitted 5 April, 2019; v1 submitted 15 June, 2018;
originally announced June 2018.
-
openSE: A Systems engineering framework particularly suited to particle accelerator studies and development projects
Authors:
P. Bonnal,
B. Féral,
K. Kershaw,
B. Nicquevert,
M. Baudin,
L. Lari,
J. Le Cardinal
Abstract:
Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and th…
▽ More
Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework is a systems engineering and project management framework specifically designed for scientific facilities' systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.
△ Less
Submitted 5 January, 2018;
originally announced January 2018.
-
The International Linear Collider Technical Design Report - Volume 3.I: Accelerator R&D in the Technical Design Phase
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.
-
The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.