Construction techniques and performances of a full-size prototype Micromegas chamber for the ATLAS muon spectrometer upgrade
Authors:
T. Alexopoulos,
M. Alviggi,
M. Antonelli,
F. Anulli,
C. Arcangeletti,
P. Bagnaia,
A. Baroncelli,
M. Beretta,
C. Bini,
J. Bortfeldt,
D. Calabrò,
V. Canale,
G. Capradossi,
G. Carducci,
A. Caserio,
C. Cassese,
S. Cerioni,
G. Ciapetti,
V. D' Amico,
B. De Fazio,
M. Del Gaudio,
C. Di Donato,
R. Di Nardo,
D. D' Uffizi,
E. Farina
, et al. (54 additional authors not shown)
Abstract:
A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures used in constructing the single modules of the chamber in various INFN laboratories and the final assembly at the Laboratori Nazionali di Frascati (LNF). Results of the chamber ex…
▽ More
A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures used in constructing the single modules of the chamber in various INFN laboratories and the final assembly at the Laboratori Nazionali di Frascati (LNF). Results of the chamber exposure to the CERN SPS/H8 beam line in June 2016 are also presented. The performances achieved in the construction and the results of the test beam are compared with the requirements, which are imposed by the severe environment during the data-taking of the LHC foreseen for the next years.
△ Less
Submitted 11 September, 2018; v1 submitted 29 August, 2018;
originally announced August 2018.