A primary electron beam facility at CERN -- eSPS Conceptual design report
Authors:
M. Aicheler,
T. Akesson,
F. Antoniou,
A. Arnalich,
P. A. Arrutia Sota,
P. Bettencourt Moniz Cabral,
D. Bozzini,
M. Brugger,
O. Brunner,
P. N. Burrows,
R. Calaga,
M. J. Capstick,
R. Corsini,
S. Doebert,
L. A. Dougherty,
Y. Dutheil,
L. A. Dyks,
O. Etisken,
L. Evans,
A. Farricker,
R. Fernandez Ortega,
M. A. Fraser,
J. Gall,
S. J. Gessner,
B. Goddard
, et al. (30 additional authors not shown)
Abstract:
The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastru…
▽ More
The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastructure. The facility would be relevant for several of the key priorities in the 2020 update of the European Strategy for Particle Physics, such as an electron-positron Higgs factory, accelerator R\&D, dark sector physics, and neutrino physics. In addition, it could serve experiments in nuclear physics. The electron beam delivered by this facility would provide access to light dark matter production significantly beyond the targets predicted by a thermal dark matter origin, and for natures of dark matter particles that are not accessible by direct detection experiments. It would also enable electro-nuclear measurements crucial for precise modelling the energy dependence of neutrino-nucleus interactions, which is needed to precisely measure neutrino oscillations as a function of energy. The implementation of the facility is the natural next step in the development of X-band high-gradient acceleration technology, a key technology for compact and cost-effective electron/positron linacs. It would also become the only facility with multi-GeV drive bunches and truly independent electron witness bunches for plasma wakefield acceleration. A second phase capable to deliver positron witness bunches would make it a complete facility for plasma wakefield collider studies. [...]
△ Less
Submitted 21 December, 2020; v1 submitted 15 September, 2020;
originally announced September 2020.
SPS Beam Dump Facility -- Comprehensive Design Study
Authors:
C. Ahdida,
R. G. Alia,
G. Arduini,
A. Arnalich,
P. Avigni,
F. Bardou,
M. Battistin,
J. Bauche,
M. Brugger,
J. Busom,
M. Calviani,
M. Casolino,
N. Colonna,
L. Dougherty,
Y. Dutheil,
E. Fornasiere,
M. A. Fraser,
L. Gatignon,
J. Gall,
S. Gilardoni,
B. Goddard,
J-L. Grenard,
D. Grenier,
C. Hessler,
R. Jacobsson
, et al. (23 additional authors not shown)
Abstract:
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector…
▽ More
The proposed Beam Dump Facility (BDF) is foreseen to be located at the North Area of the SPS. It is designed to be able to serve both beam dump like and fixed target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. In the first instance, exploitation of the facility, in beam dump mode, is envisaged to be for the Search for Hidden Particle (SHiP) experiment.
Following the first evaluation of the BDF in 2014-2016, CERN management launched a Comprehensive Design Study over three years for the facility. The BDF study team has since executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key sub-systems and evaluations of the radiological aspects and safety. A first iteration of detailed integration and civil engineering studies have been performed in order to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the studies, and draws up a possible road map for a three-year Technical Design Report phase, followed by a 5 to 6 year construction phase.
△ Less
Submitted 13 December, 2019;
originally announced December 2019.